Search Results

1214 Records Found

Record Name and Description

  1. Transmittal of Approved Remedial Design and Remedial Action Work Plan for the 100 Area Remaining Sites Interim Remedial Action: 105K West Basin Demolition and Removal, DOE/RL-2010-53, Revision 1

    Accession: AR-21197
    Doc Number: 22-PFD-002257, DOE/RL-2010-53, Rev 1
    Author: French M S
    Doc Date: August 18, 2022
    Download
  2. Remedial Design/Remedial Action Work Plan for Waste Sites in the 200-CW-3 Operable Unit, DOE/RL-2007-55, Revision 1

    Accession: AR-22909
    Doc Number: 22-PFD-003996, DOE/RL-2007-55, Rev 1
    Author: French M S
    Doc Date: December 28, 2022
    Download
  3. Removal Action Work Plan for the Plutonium Uranium Extraction Complex, DOE/RL-2020-04, Revision 1

    Accession: AR-21025
    Doc Number: 22-PFD-002236, DOE/RL-2020-04, Rev 1
    Author: French M S
    Doc Date: August 05, 2022
    Download
  4. Completion of the Hanford Federal Facility Agreement and Consent Order Milestone M-091-53B

    Accession: AR-21003
    Doc Number: 22-PFD-001531
    Author: French M S
    Doc Date: August 05, 2022
    Download
  5. Sampling and Analysis Plan for the Plutonium Uranium Extraction Complex, DOE/RL-2020-05, Revision 0

    Accession: AR-19499
    Doc Number: 22-PFD-001053, DOE/RL-2020-05, Rev 0
    Author: French M S
    Doc Date: April 15, 2022
    Download
  6. Removal Action Work Plan for the 200 West Area Tier 2 Building/Structures, DOE/RL 2021-06, Revision 0

    Accession: AR-19575
    Doc Number: 22-PFD-001196, DOE/RL-2021-06, Rev 0
    Author: French M S
    Doc Date: April 21, 2022
    Download
  7. Sampling and Analysis Plan for the 200 West Tier 2 Building/Structures, DOE/RL-2021-07, Revision 0

    Accession: AR-19502
    Doc Number: 22-PFD-001095, DOE/RL-2021-07, Rev 0
    Author: French M S
    Doc Date: April 15, 2022
    Download
  8. Sampling and Analysis Plan for the B Plant Complex, DOE/RL-2020-46, Revision 0

    Accession: AR-20714
    Doc Number: 22-PFD-001975, DOE/RL-2020-46, Rev 0
    Author: French M S
    Doc Date: July 21, 2022
    Download
  9. Reissue Sampling and Analysis Plan for the Plutonium Uranium Extraction Complex Tier 2 Buildings/Structures, DOE/RL-2017-46, Revision 1

    Accession: AR-20400
    Doc Number: 22-PFD-001645 REISSUE, DOE/RL-2017-46, Rev 1
    Author: French M S
    Doc Date: June 22, 2022
    Download
  10. Sampling and Analysis Plan for the Plutonium Uranium Extraction Complex Tier 2 Buildings/Structures, DOE/RL-2017-46, Revision 1

    Accession: AR-20393
    Doc Number: 22-PFD-001645, DOE/RL-2017-46, Rev 1
    Author: French M S
    Doc Date: June 22, 2022
    Download
  11. Action Memorandum for the 200 West Area Tier 2 Buildings/Structures DOE/RL-2020-56 Draft A

    Accession: AR-15355
    Doc Number: 21-PFD-002600, DOE/RL-2020-56 Draft A
    Author: French M S
    Doc Date: August 26, 2021
    Download
  12. Action Memorandum for the B Plant Complex, DOE/RL-2016-51, Revision 0

    Accession: AR-15988
    Doc Number: 21-PFD-002821, DOE/RL-2016-51 Rev 0
    Author: French M S
    Doc Date: September 10, 2021
    Download
  13. Transmittal of Remedial Design and Remedial Action Work Plan for the 100 Area Remaining Sites Interim Remedial Action: 105k West Basin Demolition and Removal, DOE/RL-2010-53, Revision 1, Draft A

    Accession: AR-17500
    Doc Number: 21-PFD-003579, DOE/RL-2010-53, Rev 1 Draft
    Author: French M S
    Doc Date: November 09, 2021
    Download
  14. Remedial Design/Remedial Action Work Plan for 200 North Area Waste Sites Located in the 200-CW-3 Operable Unit, DOE/RL-2007-55, Draft A

    Accession: AR-21702
    Doc Number: 22-PFD-002698, DOE/RL-2007-55, Rev 1, Draft A
    Author: French M S
    Doc Date: September 27, 2022
    Download
  15. Hanford Site Solid Waste Landfill Annual Monitoring Report

    Accession: AR-03645
    Doc Number: 20-PDF-0020
    Revision: N/A
    Author: French M S
    Doc Date: March 30, 2020
    Download
  16. Reissue - Transmittal of Engineering Evaluation Cost Analysis for the B Plant Complex, DOE-RL-2016-14, Revision 0

    Accession: AR-03838
    Doc Number: 20-PFD-0035
    Revision: REISSUE
    Author: French M S
    Doc Date: June 03, 2020
    Download
  17. Removal Action Work Plan for the PUREX Complex Tier 2 Buildings/Structures, DOE/RL-2016-47, Revision 0

    Accession: AR-03825
    Doc Number: 20-PFD-0034
    Revision: N/A
    Author: French M S
    Doc Date: June 03, 2020
    Download
  18. Removal Action Work Plan for Central Plateau General Decommissioning Activities, DOE/RL-2010-33, Revision 1

    Accession: AR-04207
    Doc Number: 21-PFD-0002
    Revision: N/A
    Author: French M S
    Doc Date: October 20, 2020
    Download
  19. Transmittal of Removal Action Work Plan for the 224T Plutonium Concentration Facility, DOE/RL-2019-36, Revision 0 and Sampling and Analysis Plan for the 224T Plutonium Concentration Facility, DOE/RL-2019-37, Revision 0

    Accession: AR-06798
    Doc Number: 21-PFD-000146
    Revision: N/A
    Author: French M S
    Doc Date: January 25, 2021
    Download
  20. Sampling and Analysis Plan for the Plutonium Uranium Extraction Complex, DOE/RL-2020-05, Draft A

    Accession: AR-13400
    Doc Number: 21-PFD-001630, DOE/RL-2020-05 Draft A
    Author: French M S
    Doc Date: May 21, 2021
    Download
  21. Transmittal of Engineering Evaluation Cost Analysis for the B Plant Complex, DOE-RL-2016-14, Revision 0

    Accession: AR-03837
    Doc Number: 20-PFD-0035
    Revision: N/A
    Author: French M S
    Doc Date: June 03, 2020
    Download
  22. Removal Action Work Plan for the 224T Plutonium Concentration Facility, DOE/RL-2019-36, Draft A, and Sampling and Analysis Plan for the 224T Plutonium Concentration Facility, DOE/RL-2019-37, Draft A

    Accession: AR-03997
    Doc Number: 20-PFD-0040
    Revision: N/A
    Author: French M S
    Doc Date: August 12, 2020
    Download
  23. Extension Request for the Continued Operation of the Existing Staging Area at the Environmental Restoration Disposal Facility

    Accession: AR-27052
    Doc Number: 23-PFD-0024
    Author: French M S
    Doc Date: November 16, 2023
    Download
  24. Environmental Restoration Disposal Facility Fact Sheet for Authorization of Super Cell 11

    Accession: AR-27205
    Doc Number: 23-PFD-0025
    Author: French M S
    Doc Date: November 16, 2023
    Download
  25. Reissue Environmental Restoration Disposal Facility Fact Sheet for Authorization of Super Cell 11

    Accession: AR-27217
    Doc Number: 23-PFD-0025 REISSUE
    Author: French M S
    Doc Date: November 16, 2023
    Download