Search Results

24 Records Found

Record Name and Description

  1. Revising the Sampling and Analysis Plan for the 100-KR-4 Groundwater Operable Unit Monitoring

    Accession: AR-14221
    Doc Number: SGW-66630, SGW-66630-VA, Rev. 0
    Author: Hulstrom J A
    Doc Date: May 24, 2021
    Download
  2. Data Quality Objectives for the 100-KR-4 Rebound Study Sampling and Analysis Plan

    Accession: AR-04071
    Doc Number: SGW-65230-VA
    Revision: 0
    Author: Hulstrom J A
    Doc Date: August 03, 2020
    Download
  3. TPA-CN-0859, Interim Action Waste Management Plan for the 100-HR-3 and 100-KR-4 Operable Units, Rev. 6

    Accession: AR-02646
    Doc Number: TPA-CN-0859
    Revision: N/A
    Author: Hulstrom J A
    Doc Date: July 22, 2019
    Download
  4. Well Installation Sampling and Analysis Plan for 100-KR-4 Groundwater Operable Unit

    Accession: AR-03053
    Doc Number: DOE/RL-2019-16
    Revision: 0
    Author: Hulstrom J A
    Doc Date: September 25, 2019
    Download
  5. TPA-CN-0858: DOE/RL-2013-33, Remedial Design/Remedial Action Work Plan for the 100-KR-4 Groundwater Operable Unit Interim Action, Rev. 0

    Accession: AR-02672
    Doc Number: TPA-CN-0858
    Revision: N/A
    Author: Hulstrom J A
    Doc Date: July 30, 2019
    Download
  6. 100-KR-4 Groundwater Operable Unit Well Installation Sampling and Analysis Plan, Addendum 7: Wells 199-K-238, 199-K-239, and 199-K-240

    Accession: AR-03041
    Doc Number: DOE/RL-2013-36-ADD7
    Revision: 0
    Author: Hulstrom J A
    Doc Date: September 04, 2019
    Download
  7. TPA-CN-0914: DOE/RL-2013-29, Sampling and Analysis Plan for 100-KR-4 Groundwater Operable Unit Monitoring, Rev. 0

    Accession: AR-13648
    Doc Number: TPA-CN-0914, DOE/RL-2013-29, Rev 0
    Author: Hulstrom J A
    Doc Date: June 01, 2021
    Download
  8. Operations and Maintenance Plan for the 100-KR-4 Pump and Treat Systems

    Accession: 0064706H
    Doc Number: DOE/RL-2013-48
    Revision: 1
    Author: Hulstrom J A
    Doc Date: July 18, 2018
    Download
  9. TPA-CN-0857: DOE/RL-2013-29, Sampling and Analysis Plan for 100-KR-4 Groundwater Operable Unit Monitoring, Rev. 0

    Accession: AR-02643
    Doc Number: TPA-CN-0857
    Revision: N/A
    Author: Hulstrom J A
    Doc Date: July 22, 2019
    Download
  10. KW Soil Flushing Treatability Test Effectiveness Assessment and Recommendations

    Accession: AR-03346
    Doc Number: SGW-63885
    Revision: 0
    Author: Hulstrom J A
    Doc Date: September 25, 2019
    Download
  11. ECF-100BC-15-0121 Rev. 0: Hydraulic Gradients in 100-BC-5 Operable Unit 2010 Through 2015

    Accession: 0076178H
    Doc Number: ECF-100BC-15-0121
    Revision: 0
    Author: Hulstrom J A, McDonald J P, Hartman M J
    Doc Date: April 27, 2016
    Download
  12. TPA-CN-0869: DOE/RL-2018-10, KW Soil Flushing/Infiltration Treatability Test Plan Sampling and Analysis Plan, Rev. 0

    Accession: AR-03038
    Doc Number: TPA-CN-0869
    Revision: N/A
    Author: Hulstrom J A
    Doc Date: September 24, 2019
    Download
  13. TPA-CN-0894: DOE/RL-2013-48, Operation and Maintenance Plan for the 100-KR-4 Pump and Treat Systems, Rev. 1

    Accession: AR-03886
    Doc Number: TPA-CN-0894
    Revision: N/A
    Author: Hulstrom J A
    Doc Date: June 29, 2020
    Download
  14. TPA-CN-0899: DOE/RL-97-01, Interim Action Waste Management Plan for the 100-HR-3 and 100-KR-4 Operable Units, Rev. 6

    Accession: AR-04110
    Doc Number: TPA-CN-0899
    Revision: N/A
    Author: Hulstrom J A
    Doc Date: September 24, 2020
    Download
  15. 100-KR-4 Groundwater Operable Unit Well Installation Sampling and Analysis Plan, Addendum 5: Wells 199-K-231, 199-K-232, 199-K-233, and 199-K-234

    Accession: 0066276H
    Doc Number: DOE/RL-2013-36-ADD5
    Revision: 0
    Author: Hulstrom J A
    Doc Date: January 09, 2018
    Download
  16. Data Quality Assessment for 100-HR-3 Groundwater Operable Unit Wells Installed in Calendar Year 2015

    Accession: 0067578H
    Doc Number: SGW-61213
    Revision: 0
    Author: Hulstrom J A
    Doc Date: November 28, 2017
    Download
  17. 100-KR-4 Groundwater Operable Unit Well Installation Sampling and Analysis Plan, Addendum 4: Wells 199-K-227, 199-K-228, 199-K-229, and 199-K-230

    Accession: 0068824H
    Doc Number: DOE/RL-2013-36-ADD4
    Revision: 0
    Author: Hulstrom J A
    Doc Date: January 12, 2017
    Download
  18. 100-K KE Boreholes STOMP Evaluation

    Accession: 0067185H
    Doc Number: CHPRC-03377-VA
    Revision: 0
    Author: Hulstrom J A
    Doc Date: July 19, 2017
    Download
  19. Data Quality Assessment for 100-KR-4 Groundwater Operable Unit Wells Installed in Calendar Year 2014 and 2015

    Accession: 0067579H
    Doc Number: SGW-61212
    Revision: 0
    Author: Hulstrom J A
    Doc Date: November 28, 2017
    Download
  20. KW Soil Flushing/Infiltration Treatability Test Plan Sampling and Analysis Plan

    Accession: 0064445H
    Doc Number: DOE/RL-2018-10
    Revision: 0
    Author: Hulstrom J A
    Doc Date: October 25, 2018
    Download
  21. 100-KR-4 Groundwater Operable Unit Well Installation Sampling and Analysis Plan, Addendum 6: Wells 199-K-235 and 199-K-236

    Accession: 0064702H
    Doc Number: DOE/RL-2013-36-ADD6
    Revision: 0
    Author: Hulstrom J A
    Doc Date: August 28, 2018
    Download
  22. Data Usability Assessment for 100-KR-4 Groundwater Operable Unit Wells Installed in Calendar Year 2014 and 2016

    Accession: 0064705H
    Doc Number: SGW-61544
    Revision: 0
    Author: Hulstrom J A
    Doc Date: September 17, 2018
    Download
  23. Cost Estimate for the 200-MG-2 Operable Unit Engineering Evaluation/Cost Analysis Removal Actions

    Accession: 0809231025
    Doc Number: SGW-38475
    Revision: 0
    Author: Hulstrom J A
    Doc Date: September 09, 2008
    Download
  24. Cost Estimate for the 200-MG-1 Operable Unit Engineering Evaluation/Cost Analysis Removal Actions

    Accession: 0809231026
    Doc Number: SGW-38383
    Revision: 0
    Author: Hulstrom J A
    Doc Date: September 09, 2008
    Download