Search Results

21568 Records Found

Record Name and Description

  1. Transmittal of Sampling and Analysis Plan for the Fast Flux Test Facility Complex, DOE/RL-2023-17, Revision 0

    Accession: AR-31820
    Doc Number: 24-PFD-0048, DOE/RL-2023-17, Rev 0
    Author: Ebert K A
    Doc Date: October 10, 2024
    Download
  2. Transmittal of Air Monitoring Plan for the Fast Flux Test Facility Removal Action, DOE/RL-2023-15, Revision 0

    Accession: AR-31825
    Doc Number: 24-PFD-0046, DOE/RL-2023-15, Rev 0
    Author: Ebert K A
    Doc Date: October 10, 2024
    Download
  3. Transmittal of Removal Action Work Plan for the Fast Flux Test Facility Complex, DOE/RL-2023-16, Revision 0

    Accession: AR-31824
    Doc Number: 24-PFD-0047, DOE/RL-2023-16, Rev 0
    Author: Ebert K A
    Doc Date: October 10, 2024
    Download
  4. Transmittal of Sampling and Analysis Plan for the 200 West Tier 2 Buildings/Structures, DOE/RL-2021-07, Draft A

    Accession: AR-16596
    Doc Number: 21-PFD-002977, DOE/RL-2021-07 Draft A
    Author: French M A
    Doc Date: September 28, 2021
    Download
  5. Request for Extension for Comment Response and Plan for Document Update: Remedial Investigation/Feasibility Study for the 100-NR-1 and 100-NR-2 Operable Units, DOE/RL-2012-15, Draft B

    Accession: AR-16753
    Doc Number: 21-SGD-003159
    Author: Cline M W
    Doc Date: September 30, 2021
    Download
  6. M-091 Transuranic Mixed/Mixed Low-Level Waste Project Management Plan, HNF-19169, Revision 23

    Accession: AR-16755
    Doc Number: 21-PFD-003096, HNF-19169 Rev 23
    Author: Hamel W F
    Doc Date: September 30, 2021
    Download
  7. Request for Approval to use the Plug-In Approach for Disposal of Miscellaneous Asphalt, Soils, and Debris from the Effluent Treatment Facility Acetonitrile Distillate Load-Out Project in the Environmental Restoration Disposal Facility

    Accession: AR-17255
    Doc Number: 21-PFD-003256
    Author: Hamel W F
    Doc Date: October 25, 2021
    Download
  8. Request for Extension to Respond to Comments Received from U.S. Environmental Protection Agency on the Feasibility Study for the 100-KR-1, 100-KR-2, and 100-KR-4 Operable Units, DOE/RL-2018-22, Draft B

    Accession: AR-16860
    Doc Number: 21-SGD-003157
    Author: Cline M W
    Doc Date: October 05, 2021
    Download
  9. Request for Approval to use the Plug-In Approach for Disposal of Miscellaneous Asphalt, Soils, and Debris from the Effluent Treatment Facility Chiller for Steam Stripper and Grout Project in the Environmental Restoration Disposal Facility

    Accession: AR-17247
    Doc Number: 21-PFD-003231
    Author: Hamel W F
    Doc Date: October 25, 2021
    Download
  10. Request for Approval to use the Plug-In Approach for Disposal of Miscellaneous Asphalt, Soils, and Debris from the Effluent Treatment Facility Acetonitrile Steam Stripper Project in the Environmental Restoration Disposal Facility

    Accession: AR-17251
    Doc Number: 21-PFD-003251
    Author: Hamel W F
    Doc Date: October 25, 2021
    Download
  11. Request for Approval to use the Plug-In Approach for Disposal of Miscellaneous Asphalt, Soils, and Debris from the Effluent Treatment Facility Motor Control Center Power Drop Project in the Environmental Restoration Disposal Facility

    Accession: AR-17253
    Doc Number: 21-PFD-0003253
    Author: Hamel W F
    Doc Date: October 25, 2021
    Download
  12. Transmittal of Sampling and Analysis Plan for 100-KR-4 Groundwater Operable Unit Monitoring, DOE/RL-2013-29, Revision 1, Draft A

    Accession: AR-16683
    Doc Number: 21-SGD-003164, DOE/RL-2013-29 Rev 1 Draft A
    Author: Cline M W
    Doc Date: September 29, 2021
    Download
  13. Initiation of Dispute Resolution for Primary Document Review Process on the Calendar Year 2019 Hanford Site Mixed Waste Land Disposal Restrictions Full Report, DOE/RL-2020-09, Revision 1

    Accession: AR-16682
    Doc Number: 21-PFD-003158
    Author: Hamel W F
    Doc Date: September 29, 2021
    Download
  14. Interim Status Groundwater Quality Assessment Plan for the Single-shell Tank System, DOE/RL-2019-74, Revision 1

    Accession: AR-21129
    Doc Number: 22-SGD-002361, DOE/RL-2019-74, Rev 1
    Author: Cline M W
    Doc Date: August 17, 2022
    Download
  15. Transmittal of Approved Remedial Design and Remedial Action Work Plan for the 100 Area Remaining Sites Interim Remedial Action: 105K West Basin Demolition and Removal, DOE/RL-2010-53, Revision 1

    Accession: AR-21197
    Doc Number: 22-PFD-002257, DOE/RL-2010-53, Rev 1
    Author: French M S
    Doc Date: August 18, 2022
    Download
  16. Interim Status Groundwater Quality Assessment Plan for the 216-S-10 Pond and Ditch, DOE/RL-2022-26, Revision 0

    Accession: AR-21123
    Doc Number: 22-SGD-002364, DOE/RL-2022-26, Rev 0
    Author: Cline M W
    Doc Date: August 17, 2022
    Download
  17. Remedial Design/Remedial Action Work Plan for Waste Sites in the 200-CW-3 Operable Unit, DOE/RL-2007-55, Revision 1

    Accession: AR-22909
    Doc Number: 22-PFD-003996, DOE/RL-2007-55, Rev 1
    Author: French M S
    Doc Date: December 28, 2022
    Download
  18. Closure Request for Hanford Site Air Operating Permit 00-05-006, Renewal 3 Discharge Point 1.4.9, Portable Boiler

    Accession: AR-22907
    Doc Number: 22-ECD-003782
    Author: Vance B T
    Doc Date: December 21, 2022
    Download
  19. Groundwater Assessment First Determination Report for Low-Level Burial Grounds Waste Management Area-2, DOE/RL-2022-35, Revision 0

    Accession: AR-22741
    Doc Number: 22-SGD-003914, DOE/RL-2022-35, Rev 0
    Author: Cline M W
    Doc Date: December 15, 2022
    Download
  20. Removal Action Work Plan for the Plutonium Uranium Extraction Complex, DOE/RL-2020-04, Revision 1

    Accession: AR-21025
    Doc Number: 22-PFD-002236, DOE/RL-2020-04, Rev 1
    Author: French M S
    Doc Date: August 05, 2022
    Download
  21. Completion of the Hanford Federal Facility Agreement and Consent Order Milestone M-091-53B

    Accession: AR-21003
    Doc Number: 22-PFD-001531
    Author: French M S
    Doc Date: August 05, 2022
    Download
  22. Status of Completion of Administrative Order Docket Number 15343 Corrective Action Three Recover and Manage Plutonium Uranium Extraction Plant White Powder and Washington State Department of Ecology Letter 20-NWP-043

    Accession: AR-20482
    Doc Number: 22-ECD-001452
    Author: Vance B T
    Doc Date: June 29, 2022
    Download
  23. Response to Technical Deficiencies to Incorporate the Leachate Collection System as Dangerous Waste Management Units to the Hanford Facility Resource Conservation and Recovery Act Permit for the Integrated Disposal Facility Operating Unit Group 11

    Accession: AR-20476
    Doc Number: 22-ECD-001379, REG-1281, Rev 0, REG-1252, Rev 0, REG-1280, Rev 0
    Author: Vance B T
    Doc Date: June 29, 2022
    Download
  24. Low-Activity Waste Pretreatment System/Tank Side Cesium Removal System, Operating Unit Group 1, Quarterly Summary Report for January 1, 2022, Through March 31, 2022

    Accession: AR-20485
    Doc Number: 22-ECD-001734
    Author: Vance B T
    Doc Date: July 01, 2022
    Download
  25. Removal Action Work Plan for the 200 West Area Tier 2 Building/Structures, DOE/RL 2021-06, Revision 0

    Accession: AR-19575
    Doc Number: 22-PFD-001196, DOE/RL-2021-06, Rev 0
    Author: French M S
    Doc Date: April 21, 2022
    Download