Search Results

1710 Records Found

Record Name and Description

  1. REVIEW COMMENTS ON 100 AREA BURIAL GROUNDS FOCUSED FEASIBILITY STUDY DOE/RL 98-18 DRAFT C AND PROPOSED PLAN FOR 100 AREA BURIAL GROUNDS INTERIM REMEDIAL ACTION DOE/RL 99-59 DRAFT A

    Accession: D8224983
    Doc Number: —
    Revision: —
    Author: Faulk D, Bond R
    Doc Date: January 27, 2000
    Download
  2. DATA PACKAGE SUMMARY ANALYTICAL LABORATORY REMEDIAL ACTION OF THE 100-C-7 AND 100-C-7:1 WASTE SITES IN PROCESS SAMPLING

    Accession: 0089260
    Doc Number: J01745
    Revision: —
    Author: NA
    Doc Date: March 12, 2013
    Download
  3. RIVER CORRIDOR/CENTRAL PLATEAU QUARTERLY TRI-PARTY AGREEMENT MILESTONE REVIEW MEETING MINUTES MARCH 15 2018

    Accession: 0065834H
    Doc Number: —
    Revision: —
    Author: Smith A K, Einan D R, Franco J R
    Doc Date: March 15, 2018
    Download
  4. Cost Estimate Inputs for Remedial Investigation/Feasibility Study Alternatives for 100-BC-1, 100-BC-2, and 100-BC-5 Operable Units

    Accession: AR-00026
    Doc Number: ECF-100BC1-16-0085
    Revision: 1
    Author: Evans R T
    Doc Date: February 21, 2019
    Download
  5. DATA PACKAGE SUMMARY ANALYTICAL LABORATORY 100-BC BURIAL GROUNDS SOIL FULL PROTOCOL SAMPLING

    Accession: DA01055166
    Doc Number: H3321
    Revision: —
    Author: NA-1
    Doc Date: August 12, 2005
    Download
  6. DATA PACKAGE SUMMARY ANALYTICAL LABORATORY 100-BC REMAINING PIPELINES AND SEWERS SOIL FULL PROTOCOL SAMPLING

    Accession: DA01056994
    Doc Number: H3319
    Revision: —
    Author: NA-1
    Doc Date: August 12, 2005
    Download
  7. TRANSMITTAL OF APPROVED CLEANUP VERIFICATION PACKAGE FOR THE 100-D-32 MINOR CONSTRUCTION BURIAL GROUNDS #6

    Accession: 0084787
    Doc Number: 10-AMRC-0062
    Revision: —
    Author: French M S
    Doc Date: February 9, 2010
    Download
  8. MEETING MINUTES UNIT MANAGERS MEETING GROUNDWATER AND SOURCE OPERABLE UNITS FACILITY DEACTIVATION DECONTAMINATION DECOMMISSION AND DEMOLITION (D4) INTERIM SAFE STORAGE (ISS) FIELD REMEDIATION (FR) AND MISSION COMPLETION AUGUST 8 2013

    Accession: 1310160535
    Doc Number: 172913
    Revision: —
    Author: French M S
    Doc Date: September 19, 2013
    Download
  9. TRI PARTY AGREEMENT TPA CHANGE NOTICE DOE/RL-2008-46 ADD3 INTEGRATED 100 AREA REMEDIAL INVESTIGATION FEASIBILITY STUDY WORK PLAN ADDENDUM 3 100-BC-1 100-BC-2 AND 100-BC-5 OPERABLE UNITS REV 0 AS MODIFIED BY TPA-CN-558

    Accession: 1310160530
    Doc Number: TPA-CN-592
    Revision: —
    Author: Charboneau B L
    Doc Date: September 26, 2013
    Download
  10. D&D-34992 REV 0: SAMPLE AND ANALYSIS PLAN FOR DEMOLITION OF 105-K EAST BASIN STRUCTURE

    Accession: 1402100625
    Doc Number: D&D-34992
    Revision: —
    Author: NA
    Doc Date: February 29, 2008
    Download