Search Results

267 Records Found

Record Name and Description

  1. Well Installation Sampling and Analysis Plan for 100-HR-3 Groundwater Operable Unit, DOE/RL-2019-15, Draft A

    Accession: AR-02457
    Doc Number: 19-SGD-0030
    Revision: N/A
    Author: Hammel W F
    Doc Date: June 11, 2019
    Download
  2. 2018 Hanford Site Polychlorinated Biphenyl (PCB) Annual Document Log DOE/RL-2019-17, Revision 0 and 2018 Hanford PCB Annual Report DOE/RL-2019-18, Revision 0

    Accession: AR-02509
    Doc Number: 19-ESQ-0079
    Revision: N/A
    Author: Vance B T
    Doc Date: June 28, 2019
    Download
  3. Contract Number DE-AC27-08RV14800 Washington River Protection Solutions LLC Transmittal of Tank Operations Contract Startup Notification Report, June 2019

    Accession: AR-02576
    Doc Number: 19-TPD-0010
    Revision: N/A
    Author: Hastings R G
    Doc Date: July 11, 2019
    Download
  4. Environmental Cost Estimate for the 200-UP-1 Southeast Chromium Plume Remedial Options

    Accession: AR-01363
    Doc Number: ECE-200UP118-00002
    Revision: 1
    Author: Arola C C
    Doc Date: May 22, 2019
    Download
  5. Transmittal of Entity Review Comment Record Forms for Draft Permit and Fact Sheet for State Waste Discharge Permit ST0045514

    Accession: AR-02460
    Doc Number: 19-ESQ-0075
    Revision: N/A
    Author: Vance B T
    Doc Date: June 17, 2019
    Download
  6. U. S. Department of Energy, Office of River Protection Requests For An Administrative Change For Approval DE11NWP-001, Rev. 4

    Accession: AR-02532
    Doc Number: 19-ECD-0046
    Revision: N/A
    Author: Vance B T
    Doc Date: July 2, 2019
    Download
  7. Approval of 24590-LAW-PCN-ENV-17-007, Class 1 Modification to the Hanford Facility Resource Conservation and Recovery Act Permit, Dangerous Waste Portion, Revision 8C, for the Treatment, Storage, and Disposal of Dangerous Waste, Part III, Operating Unit Group 10, Waste Treatment and Immobilization Plant (WTP Permit), WA7890008967

    Accession: AR-02440
    Doc Number: 19-NWP-086
    Revision: N/A
    Author: Dahl S L
    Doc Date: June 12, 2019
    Download
  8. Milestones in the Hanford Federal Facility Agreement and Consent Order Placed "In Abeyance" During the System Plan 8 Negotiations

    Accession: AR-02461
    Doc Number: 19-ORP-0005
    Revision: N/A
    Author: Vance B T
    Doc Date: June 21, 2019
    Download
  9. Water Level Mapping and Hydraulic gradient Calculations for 200 East Area RCRA Sites, 2018

    Accession: AR-02370
    Doc Number: ECF-200E-18-0085
    Revision: —
    Author: Hartman M J
    Doc Date: May 22, 2019
    Download
  10. Calculation of Critical Means for Calendar Year 2019 RCRA Groundwater Monitoring

    Accession: AR-02371
    Doc Number: ECF-HANFORD-18-0079
    Revision: —
    Author: Lee A K
    Doc Date: May 22, 2019
    Download