Advanced Search Results
Displaying 1-100 of 285 records found of 103,340

Where           Original Author     eq     "JA DOWELL"
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
0068680H 18-Apr-2017 M-15-12-01 ESTABLISH A NEW MILESTONE TO DEVELOP A REMEDIAL INVESTIGATION/FEASIBILITY STUDY WORK PLAN TO EVALUATE THE 100-OL-1 OPERABLE UNIT
0087670 03-Oct-2013 13-AMRP-0333 13-AMRP-0333: CALENDAR YEAR 2012 ANNUAL SUMMARY REPORT FOR THE 200-ZP-1 AND 200-UP-1 OPERABLE UNIT PUMP AND TREAT OPERATIONS DOE/RL-2013-14 REVISION 0
0087672 03-Oct-2013 13-AMRP-0335 13-AMRP-0335: 200-UP-1 GROUNDWATER OPERABLE UNIT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/RL-2013-07 REVISION 0
0087736 26-Sep-2013 13-AMRP-0328,HNF-55990 0 ENGINEERING REPORT FOR THE 400 AREA SEWER SYSTEM HNF-55990 REVISION 0
0087731 25-Sep-2013 13-AMRP-0319,DOE/RL-2013-37 DRAFT A ENGINEERING EVALUATION COST ANALYSIS FOR PERCHED WATER PUMPING PORE WATER EXTRACTION DOE/RL-2013-37 DRAFT A
0087733 25-Sep-2013 13-AMRP-0314 INFORMATION REQUESTED IN SUPPORT OF THE AUGUST 20-21 2013 US ENVIRONMENTAL PROTECTION AGENCY (EPA) TREATMENT STORAGE AND DISPOSAL (TSD) INSPECTION OF THE HANFORD FACILITY RESOURCE CONSERVATION AND RECOVERY ACT PERMIT LIQUID EFFLUENT RETENTION FACILITY AND 200 AREA EFFLUENT TREATMENT FACILITY OPERATING UNIT GROUP 3 (200 EAST LERF/ETF)
0087734 25-Sep-2013 13-AMRP-0323 NOTICE OF DEFICIENCIES FOR THE 216-B-3 MAIN POND CLOSURE PLAN DOE/RL-2013-24 DRAFT A AND 216-S-10 POND AND DITCH CLOSURE PLAN DOE/RL-2006-12 DRAFT B
1310070065 25-Sep-2013 M-16-13-01 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM IMPLEMENT THE ACTIONS INDENTIFIED IN THE 200-UP-1 GROUNDWATER OPERABLE UNIT REMEDIAL DESIGN REMEDIAL ACTION WORK PLAN TO FULFILL REMEDIAL ACTION COMPONENTS IDENTIFIED IN THE 200-UP-1 ROD FOR INTERIM REMEDIAL ACTION
1309250786 18-Sep-2013 Not listed. MEETING MINUTES INTER AGENCY MANAGEMENT INTEGRATION TEAM (IAMIT) AUGUST 15 2013
0087797 17-Sep-2013 13-AMRP-0308 13-AMRP-0308: COMPLETION OF HANFORD FACILITY AGREEMENT AND CONSENT ORDER (HFFACO) TRI PARTY AGREEMENT MILESTONE M-016-174 COMPLETE FINAL DESIGN OF SLUDGE RETRIEVAL AND TRANSFER SYSTEM
1309160566 10-Sep-2013 13-AMRP-0309 13-AMRP-0309: M-91 TRANSURANIC MIXED/MIXED LOW LEVEL WASTE PROJECT MANAGEMENT PLAN HNF-19169 REVISION 12 COMMENT RESPONSES
1309110705 08-Sep-2013 M-16-13-03 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM CHANGE NUMBER: M-16-13-03 REVISE THE SCOPE OF MILESTONE M-016-145 TO EXCLUDE 100-K-111
1309110709 28-Aug-2013 13-AMRP-0298 13-AMRP-0298: HANFORD SITE GROUNDWATER MONITORING REPORT FOR 2012 DOE/RL-2013-22 REVISION 0
1308150387 15-Aug-2013 Not listed. MEETING MINUTES RIVER CORRIDOR CENTRAL PLATEAU TRI PARTY AGREEMENT MILESTONE REVIEW JULY 18 2013
1308150388 15-Aug-2013 Not listed. MEETING MINUTES INTER AGENCY MANAGEMENT INTEGRATION TEAM (IAMIT) JULY 18 2013
1308070141 01-Aug-2013 M-15-13-01 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM EXTEND THE DUE DATES FOR TWO INTERIM MILESTONES AT 100-BC FOR INSTALLATION OF GROUNDWATER MONITORING WELLS AND COMPLETION OF TWO YEARS OF SAMPLING FOR THE 100-BC OPERABLE UNITS
1308060531 31-Jul-2013 13-AMRP-0263 13-AMRP-0263: WMA C OCTOBER THROUGH DECEMBER 2012 QUARTERLY GROUNDWATER MONITORING REPORT SGW-54675 REV 0 [1221257]
1308060535 31-Jul-2013 13-AMRP-0272 13-AMRP-0272: CALENDAR YEAR 2012 HANFORD SITE MIXED WASTE LAND DISPOSAL RESTRICTIONS SUMMARY REPORT DOE/RL-2012-12 REV 0 [EDMC 1213180] **** IMPORTANT NOTE TO DOCUMENT **** DOE RESPONSES TO ECOLOGYS COMMENTS DOCUMENT (DOE/RL-2012-12 REV 0) REFERENCED IN THE ABOVE TITLE SHOULD HAVE BEEN DOE/RL-2013-19 REV 0. PLEASE REFER TO DOE/RL-2013-19 REV 0 FOR INFORMATION.
0088123 30-Jul-2013 13-AMRP-0261 13-AMRP-0261: WASTE ANALYSIS PLANS FOR SOLID WASTE OPERATIONS COMPLEX FACILITIES
0088107 24-Jul-2013 M-24-13-01 M-24-13-01: GROUNDWATER PROTECTION MONITORING AND REMEDIATION WELL INSTALLATION PRIORITY LIST UPDATE THROUGH CY 2016 INCLUDING A NEW TPA INTERIM MILESTONE AND TPA TARGET DATE
0088351 08-Jul-2013 13-AMRP-0250 PROPOSED PLAN FOR REMEDIATION OF THE 300-FF-1 300-FF-2 AND 300-FF-5 OPERABLE UNITS DOE/RL-2011-47 REVISION 0 REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR THE 300-FF-1 300-FF-2 AND 300-FF-5 OPERABLE UNITS DOE/RL-2010-99 REVISION 0 AND REMEDIAL INVESTIGATION FEASIBILITY STUDY FOR THE 300-FF-1 300-FF-2 AND 300-FF-5 OPERABLE UNITS ADDENDUM DOE/RL-2010-99 ADD1 REVISION 0
0088352 08-Jul-2013 13-AMRP-0249 REQUEST FOR ADDITIONAL 90 DAY EXTENSION FOR COMMENT RESPONSE AND PLAN FOR DOCUMENT UPDATE REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR THE 100-DR-1 100-DR-2 100-HR-1 100-HR-2 AND 100-HR-3 OPERABLE UNITS DOE/RL-2010-95 DRAFT A AND PROPOSED PLAN FOR REMEDIATION OF THE 100-DR-1 100-DR-2 100-HR-1 100-HR-2 AND 100-HR-3 OPERABLE UNITS DOE/RL-2011-111 DRAFT A
0088355 28-Jun-2013 13-AMRP-0235,DOE/RL-2013-22 REGULATORY DRAFT 13-AMRP-0235: HANFORD SITE GROUNDWATER MONITORING REPORT FOR 2012 DOE/RL-2013-22 REGULATOR DRAFT
0088364 27-Jun-2013 13-AMRP-0212 13-AMRP-0212: COMPLETION OF HANFORD FEDERAL FACILITY AND CONSENT ORDER (TRI PARTY AGREEMENT) INTERIM MILESTONE M-015-00D DOE SHALL COMPLETE THE REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) PROCESS THROUGH THE SUBMITTAL OF A RI/FS REPORT AND PROPOSED PLAN FOR ALL 100 AND 300 AREA OPERABLE UNITS EXCEPT 100-BC-1 100-BC-2 AND 100-BC-5 AND 100-NR-1 AND 100-NR-2
0088370 24-Jun-2013 13-AMRP-0233 PROPOSED PLAN FOR REMEDIATION OF THE 100-NR-1 AND 100-NR-2 OPERABLE UNITS DOE/RL-2012-68 DRAFT A REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR THE 100-NR-1 AND 100-NR-2 OPERABLE UNITS DOE/RL-2012-15 DRAFT A AND COMPLETION OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) MILESTONE M-015-75
0088382 19-Jun-2013 13-AMRP-0209 13-AMRP-0209: 200-UP-1 GROUNDWATER OPERABLE UNIT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/RL-2013-07 DRAFT A
0088386 18-Jun-2013 13-AMRP-0216 13-AMRP-0216: RESOURCE CONSERVATION AND RECOVERY ACT GROUNDWATER QUARTERLY REPORT FOR CALENDAR YEAR APRIL THROUGHT JUNE 2012 SGW-54314 REVISION 1
0088388 18-Jun-2013 13-AMRP-0215 13-AMRP-0215: RESOURCE CONSERVATION AND RECOVERY ACT GROUNDWATER QUARTERLY REPORT FOR CALENDAR YEAR JULY THROUGH SEPTEMBER 2012 SGW-54677 REV 1
0088390 18-Jun-2013 13-AMRP-0194 13-AMRP-0194: U PLANT ANCILLARY FACILITIES REMOVAL ACTION REPORT DOE/RL-2011-04 REVISION 0
0088469 18-Jun-2013 13-AMRP-0195 INTERIM COMPLETION REPORT FOR THE 221-U FACILITY DOE/RL-2011-80 REVISION 0
0088470 18-Jun-2013 13-AMRP-0219 RESOURCE CONSERVATION AND RECOVERY ACT GROUNDWATER QUARTERLY REPORT FOR CALENDAR YEAR JANUARY THROUGH MARCH 2013 SGW-53449 REVISION 1
1306191154 18-Jun-2013 Not listed. MEETING MINUTES INTER AGENCY MANAGEMENT INTEGRATION TEAM (IAMIT) MAY 16 2013
0088384 17-Jun-2013 13-AMRP-0214 13-AMRP-0214: POST CLOSURE CORRECTIVE ACTION GROUNDWATER MONITORING REPORT FOR THE 183-H SOLAR EVAPORATION BASINS AND THE 300 AREA PROCESS TRENCHES JULY-DECEMBER 2012 SECOND SEMI ANNUAL REPORT SGW-54971 REVISION 1
0088467 14-Jun-2013 13-AMRP-0207,DOE/RL-2013-07 DRAFT B,M-16-13-01 200-UP-1 GROUNDWATER OPERABLE UNIT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/RL-2013-07 DRAFT B AND DRAFT TRI PARTY AGREEMENT CHANGE CONTROL FORM NUMBER M-16-13-01
0088476 12-Jun-2013 13-AMRP-0206 M-91 TRANSURANIC MIXED/MIXED LOW LEVEL WASTE PROJECT MANAGEMENT PLAN HNF-19169 REVISION 12
0088480 12-Jun-2013 13-AMRP-0205 STATE OF WASHINGTON DEPARTMENT OF HEALTH REQUEST FOR COMPLETED STACK INSPECTION AND LEAK TEST OF SAMPLES AT STACK 296-B-10 AT THE WASTE ENCAPSULATION AND STORAGE FACILITY (WESF)
0088596 30-May-2013 13-AMRP-0184 13-AMRP-0184: RESPONSE TO COMMENTS ON INTERIM STATUS GROUNDWATER QUALITY ASSESSMENT PLAN FOR THE SINGLE SHELL TANK WASTE MANAGEMENT AREA TX-TY DOE/RL-2009-67 REVISION 1
0088663 28-May-2013 13-AMRP-0190 13-AMRP-0190: COMPLETION OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) MILESTONE M-024-58 FOR CALENDAR YEAR 2013
0088664 28-May-2013 13-AMRP-0192 13-AMRP-0192: NOTIFICATION OF RESOURCE CONSERVATION AND RECOVERY ACT INDICATOR PARAMETER EXCEEDANCE AT LOW LEVEL WASTE MANAGEMENT AREA 2
0088660 23-May-2013 13-AMRP-0189 13-AMRP-0189: NOTIFICATION OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) TARGET DATES TO BE MISSED FOR FISCAL YEAR 2013
1305170316 16-May-2013 Not listed. MEETING MINUTES INTER AGENCY MANAGEMENT INTEGRATION TEAM (IAMIT) APRIL 18 2013
1305170317 16-May-2013 Not listed. MEETING MINUTES RIVER CORRIDOR CENTRAL PLATEAU TRI PARTY AGREEMENT MILESTONE REVIEW APRIL 18 2013
0088752 14-May-2013 13-AMRP-0172 PROPOSED PLAN FOR REMEDIATION OF THE 100-FR-1 100-FR-2 100-FR-3 100-IU-2 AND 100-IU-6 OPERABLE UNITS DOE/RL-2012-41 DRAFT A
0088748 10-May-2013 13-AMRP-0176 FIRST DETERMINATION RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) GROUNDWATER QUALITY ASSESSMENT REPORT FOR LOW LEVEL BURIAL GROUNDS LOW LEVEL WASTE MANAGEMENT AREA 1 DOE/RL-2013-25 REVISION 0
0088749 10-May-2013 13-AMRP-0173 REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR THE 100-FR-1 100-FR-2 100-FR-3 100-IU-2 AND 100-IU-6 OPERABLE UNITS DOE/RL-2010-98 DRAFT A AND PROPOSED PLAN FOR REMEDIATION OF THE 100-FR-1 100-FR-2 100-FR-3 100-IU-2 AND 100-IU-6 OPERABLE UNITS DOE/RL-2012-41 DRAFT A
1305010276 25-Apr-2013 M-15-12-03,M-16-12-06,M-85-12-02,M-89-12-02,M-93-12-02 TRI PARTY AGREEMENT APPROVED TPA CHANGE CONTROL FORMS FROM NEGOTIATIONS OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER REVISIONS PERTAINING TO 100 AREA WASTE SITE REMEDIATION 300 AREA SURPLUS FACILITIES 200 AREA RI/FS AND CANYON FACILITIES RESPONSE ACTIONS
1305060798 25-Apr-2013 M-15-12-03 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM ADD SIX NEW INTERIM MILESTONES AND DELETE TWO TARGET DATES FOR RIVER CORRIDOR DECISION DOCUMENTS AND REVISE INTERIM MILESTONE M-015-00D
1305060799 25-Apr-2013 M-16-12-06 M-16-12-06: FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM MODIFICATIONS TO MILESTONES M-016-00A, M-016-55 AND M-016-145 AND CREATION OF NEW TPA MILESTONES
1305060800 25-Apr-2013 M-85-12-02 M-85-12-02: FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM REVISE INTERIM MILESTONES IN THE M-085 SERIES (CANYONS/ASSOCIATED WASTE SITES AND TIER 2 FACILITIES) TO INCORPORATE LESSONS LEARNED FROM U PLANT
1305060802 25-Apr-2013 M-93-12-02 M-93-12-02: FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM PROVIDE A REVISED SCHEDULE FOR 105-KE AND 105-KW REACTOR INTERIM SAFE STORAGE
0088932 24-Apr-2013 13-AMRP-0163 REMEDIAL INVESTIGATION/FEASIBILITY STUDY WORK PLAN TO EVALUATE THE 100-OL-1 OPERABLE UNIT PRE HANFORD ORCHARD LANDS DOE/RL-2012-64 DRAFT A
008938 22-Apr-2013 13-AMRP-0146,SGW-46029 2 PRIORITY LIST OF RECOMMENDED SERVICE WATER LINE UPGRADES OR STORM WATER RUN OFF CONTROL PROJECTS SGW-46029 REVISION 2
0088982 11-Apr-2013 13-AMRP-0145,DOE/RL-2013-19 0 CALENDAR YEAR 2012 HANFORD SITE MIXED WASTE LAND DISPOSAL RESTRICTIONS SUMMARY REPORT DOE/RL-2013-19 REVISION 0
0088989 10-Apr-2013 13-AMRP-0153 REQUEST FOR EXTENSION FOR COMMENT RESPONSE AND PLAN FOR DOCUMENT UPDATE REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR THE 100-DR-1 100-DR-2 100-HR-1 100-HR-2 AND 100-HR-3 OPERABLE UNITS DOE/RL-2010-95 DRAFT A AND PROPOSED PLAN FOR REMEDIATION OF THE 100-DR-1 100-DR-2 100-HR-1 100-HR-2 AND 100-HR-3 OPERABLE UNITS DOE/RL-2011-111 DRAFT A
0088990 09-Apr-2013 13-AMRP-0137 RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) GROUNDWATER QUARTERLY REPORT FOR CALENDAR YEAR JULY THROUGH SEPTEMBER 2012 SGW-54677 REVISION 0
0088979 08-Apr-2013 13-AMRP-0155,DOE/RL-2006-12 DRAFT B,DOE/RL-2013-24 DRAFT A 216-B-3 MAIN POND CLOSURE PLAN DOE/RL-2013-24 DRAFT A AND 216-S-10 POND AND DITCH CLOSURE PLAN DOE/RL-2006-12 DRAFT B
0089057 02-Apr-2013 13-AMRP-0144,DOE/RL-2013-07 DRAFT A,M-16-13-01 200-UP-1 GROUNDWATER OPERABLE UNIT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN DOE/RL-2013-07 DRAFT A AND DRAFT TRI PARTY AGREEMENT CHANGE CONTROL FORM NUMBER M-16-13-01
0089158 28-Mar-2013 13-AMRP-0142 13-AMRP-0142: REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) FOR THE 100-FR-1 100-FR-2 100-FR-3 100-IU-2 AND 100-IU-6 OPERABLE UNITS DOE/RL-2010-98 DRAFT A AND PROPOSED PLAN FOR REMEDIATION OF THE 100-FR-1 100-FR-2 100-FR-3 100-IU-2 AND 100-IU-6 OPERABLE UNITS DOE/RL-2012-41 DRAFT A
0089271 22-Mar-2013 13-AMRP-0135 ANNUAL LETTER REPORT FOR TRITIUM TREATMENT TECHNOLOGY DEVELOPMENTS MARCH 2013
1303270128 21-Mar-2013 Not listed. MEETING MINUTES IAMIT (INTER-AGENCY MANAGEMENT INTEGRATION TEAM) FEBRUARY 21 2013
0089270 20-Mar-2013 13-AMRP-0122 RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) GROUNDWATER QUARTERLY REPORTS FOR WMA C JULY THROUGH SEPTEMBER 2011 QUARTERLY GROUNDWATER MONITORING REPORT SGW-51484 REVISION 0 WASTE MANAGEMENT AREA C OCTOBER THROUGH DECEMBER 2011 QUARTERLY GROUNDWATER MONITORING SUMMARY REPORT SGW-51931 REVISION 0 WASTE MANGEMENT AREA C JANUARY THROUGH APRIL 2012 QUARTERLY GROUNDWATER MONITORING SUMMARY REPORT SGW-52653 REVISION 0 AND WASTE MANAGEMENT AREA C JUNE 2012 QUARTERLY GROUNDWATER MONITORING REPORT SGW-53891 REVISION 0
1303260869 19-Mar-2013 M-85-13-01 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM EXTEND THE COMPLETION DATE FOR TPA INTERIM MILESTONE M-085-01 TO APRIL 30 2013
1304031016 19-Mar-2013 M-85-13-01 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM EXTEND THE COMPLETION DATE FOR TPA INTERIM MILESTONE M-085-01 TO APRIL 30 2013
1303040557 26-Feb-2013 13-AMRP-0120 13-AMRP-0120: STRATEGY FOR THE NEAR TERM MANAGEMENT OF WASTE CONTAINER 231-Z-DR-11
0089636 22-Feb-2013 13-AMRP-0114 HANFORD SITE WASTE MANAGEMENT UNITS REPORT DOE/RL-88-30 REVISION 22
0089634 21-Feb-2013 13-AMRP-0111 RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) GROUNDWATER QUARTERLY REPORT FOR CALENDAR YEAR JANUARY THROUGH MARCH 2012 SGW-53449 REVISION 0 AND APRIL THROUGH JUNE 2012 SGW-54314 REVISION 0
1302211010 21-Feb-2013 Not listed. MEETING MINUTES RIVER CORRIDOR CENTRAL PLATEAU TRI PARTY AGREEMENT MILESTONE REVIEW JANUARY 17 2013
1302211011 21-Feb-2013 Not listed. MEETING MINUTES IAMIT (INTER-AGENCY MANAGEMENT INTEGRATION TEAM) JANUARY 17 2013
0068353H 13-Feb-2013 M-37-13-01 REVISED CLOSURE PLANS TO SUPPORT TSD CLOSURE FOR THE 216-B-3 MAIN POND SYSTEM AND 216-S-10 POND AND DITCH
0089840 28-Jan-2013 13-AMRP-0092,TPA-CN-558 COMPLETION OF PROPOSED HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) INTERIM MILESTONE M-015-74
0089909 28-Jan-2013 13-AMRP-0088 NOTIFICATION THAT HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) INTERIM MILESTONE M-037-03 IS AT RISK OF NOT BEING MET
1302050067 28-Jan-2013 M-37-13-01 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM REVISED CLOSURE PLANS TO SUPPORT TSD CLOSURE FOR THE 216-B-3 MAIN POND SYSTEM AND 216-S-10 POND AND DITCH
0090416 08-Jan-2013 13-AMRP-0078 13-AMRP-0078: COMPLETION OF HANFORD FEDERAL FACILITY AND CONSENT ORDER (TRI PARTY AGREEMENT) INTERIM MILESTONE M-091-44P
0090417 02-Jan-2013 13-AMRP-0074 REISSUE 13-AMRP-0074 REISSUE: STATE OF WASHINGTON DEPARTMENT OF ECOLOGY REVIEW COMMENTS OF CALENDAR YEAR 2011 TRANSURANIC MIXED/MIXED LOW LEVEL WASTE PROJECT MANAGEMENT PLAN SUBMITTED FOR TRI PARTY AGREEMENT MILESTONE M-091-03
1301140285 02-Jan-2013 13-AMRP-0074 STATE OF WASHINGTON DEPARTMENT OF ECOLOGY REVIEW COMMENTS OF CALENDAR YEAR 2011 TRANSURANIC MIXED/MIXED LOW LEVEL WASTE PROJECT MANAGEMENT PLAN SUBMITTED FOR TRI PARTY AGREEMENT MILESTONE M-091-93
0090566 20-Dec-2012 13-AMRP-0064,CHPRC-1204936,DOE/RL-2009-130 2 13-AMRP-0064: COMPLETION OF HANFORD FEDERAL FACILITY AND CONSENT ORDER (TRI PARTY AGREEMENT) MILESTONE M-016-93B AND M-16-93 WORK PLAN DOE/RL-2009-130 REVISION 2
1212310270 20-Dec-2012 Not listed. MEETING MINUTES IAMIT (INTER-AGENCY MANAGEMENT INTEGRATION TEAM) NOVEMBER 15 2012
0090562 19-Dec-2012 13-AMRP-0050 13-AMRP-0050: REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR THE 100-FR-1 100-FR-2 100-FR-3 100-IU-2 AND 100-IU-6 OPERABLE UNITS DOE/RL-2010-98 DRAFT A AND PROPOSED PLAN FOR REMEDIATION OF THE 100-FR-1 100-FR-2 100-FR-3 100-IU-2 AND 100-IU-6 OPERABLE UNITS DOE/RL-2012-41 DRAFT A
0090580 19-Dec-2012 13-AMRP-0063 13-AMRP-0063: FIRST SEMIANNUAL REPORT FOR 2012 POST CLOSURE CORRECTIVE ACTION GROUNDWATER MONITORING AT THE 183-H SOLAR EVAPORATION BASINS AND 300 AREA PROCESS TRENCHES JANUARY-JUNE 3023 SGW-53895 REVISION 0
1212270865 14-Dec-2012 M-16-12-07 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM
0090583 13-Dec-2012 13-AMRP-0051 REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR THE 100-DR-1 100-DR-2 100-HR-1 100-HR-2 AND 100-HR-3 OPERABLE UNITS DOE/RL-2010-95 DRAFT A AND PROPOSED PLAN FOR REMEDIATION OF THE 100-DR-1 100-DR-2 100-HR-1 100-HR-2 AND 100-HR-3 OPERABLE UNITS DOE/RL-2011-111 DRAFT A COMPLETION OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) TARGET MILESTONE M-015-070-T01
0090734 07-Dec-2012 13-AMRP-0059 PROPOSED PLAN FOR AN AMENDMENT TO THE ENVIRONMENTAL RESTORATION DISPOSAL FACILITY (ERDF) RECORD OF DECISION TO ALLOW TREATMENT OF LAND DISPOSAL RESTRICTED (LDR) WASTE IN THE TRENCH
0090247 05-Dec-2012 13-AMRP-0056 SAMPLING AND ANALYSIS PLAN FOR INSTALLATION OF 100-HR-3 GROUNDWATER OPERABLE UNIT REPLACEMENT WELLS DOE/RL-2012-45 REVISION 0
0090740 05-Dec-2012 13-AMRP-0049 GROUNDWATER QUALITY ASSESSMENT PLAN FOR THE SINGLE SHELL TANK WASTE MANAGEMENT AREA B-BX-BY DOE/RL-2012-53 REVISION 0
0090845 29-Nov-2012 13-AMRP-0058 COMPLETION OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) MILESTONE M-016-53 COMPLETE THE INTERIM RESPONSE ACTIONS FOR THE 100-K AREA WITHIN THE PERIMETER BOUNDARY AND TO THE RIVER FOR PHASE 1 ACTIONS
0090912 26-Nov-2012 13-AMRP-0048 COMPLETION OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) MILESTONE M-024-64 FOR GROUNDWATER WELL INSTALLATIONS
0090732 21-Nov-2012 13-AMRP-0041 COLUMBIA RIVER COMPONENT RISK ASSESSMENT VOLUME II PARTS 1 AND 2 BASELINE HUMAN HEALTH RISK ASSESSMENT DOE/RL-2010-117 REVISION 0
0090955 19-Nov-2012 13-AMRP-0030,DOE/RL-2009-66 1 13-AMRP-0030: INTERIM STATUS GROUNDWATER QUALITY ASSESSMENT PLAN FOR THE SINGLE SHELL TANK WASTE MANAGEMENT AREA T DOE/RL-2009-66 REVISION 1
1211191616 15-Nov-2012 Not listed. MEETING MINUTES IAMIT (INTER-AGENCY MANAGEMENT INTEGRATION TEAM) OCTOBER 18 2012
1211191617 15-Nov-2012 Not listed. MEETING MINUTES RIVER CORRIDOR CENTRAL PLATEAU TRI PARTY AGREEMENT MILESTONE REVIEW OCTOBER 18 2012
0091053 14-Nov-2012 12-AMRP-0172 COMPLETION OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) TARGET MILESTONE M-016-110-T01 "DOE SHALL TAKE ACTIONS NECESSARY TO CONTAIN OR REMEDIATE HEXAVALENT CHROMIUM GROUNDWATER PLUMES IN EACH OF THE 100 AREA NATIONAL PRIORITY LIST OPERABLE UNITS SUCH THAT AMBIENT WATER QUALITY STANDARDS FOR HEXAVALENT CHROMIUM ARE ACHIEVED IN THE HYPORHEIC ZONE AND RIVER WATER COLUMN"
1211191619 14-Nov-2012 TPA-CN-550 TRI PARTY AGREEMENT TPA CHANGE NOTICE FORM DOE/RL-97-01 INTERIM ACTION WASTE MANAGEMENT PLAN FOR THE 100-HR-3 AND 100-KR-4 OPERABLE UNIT REVISION 5
0091173 05-Nov-2012 13-AMRP-0031 ELEVATED TOTAL ORGANIC CARBON CONCENTRATIONS IN WELL 199-N-165 100-N UNIT MANAGERS MEETING ACTION ITEM 100-193
0091266 30-Oct-2012 13-AMRP-0029 13-AMRP-0029: RIVER CORRIDOR BASELINE RISK ASSESSMENT VOLUME II: HUMAN HEALTH RISK ASSESSMENT DOE/RL-2007-21 REVISION 0 AND RIVER CORRIDOR BASELINE RISK ASSESSMENT VOLUME I: ECOLOGICAL RISK ASSESSMENT DOE/RL-2007-21 REVISION 0
0091268 30-Oct-2012 13-AMRP-0018,DOE/RL-2010-72 1 13-AMRP-0018: SAMPLING AND ANALYSIS PLAN FOR EIGHTEEN REMEDIATION WELLS IN THE 200-ZP-1 OPERABLE UNIT DOE/RL-2010-72 REVISION 1
0091262 29-Oct-2012 13-AMRP-0023,DOE/RL-2009-68 2 13-AMRP-0023: INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE LLBG WMA-3 DOE/RL-2009-68 REVISION 2
0091263 29-Oct-2012 13-AMRP-0025,DOE/RL-2009-69 2 13-AMRP-0025: INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE LLBG WMA-4 DOE/RL-2009-69 REVISION 2
0091264 29-Oct-2012 13-AMRP-0024,DOE/RL-2009-67 1 13-AMRP-0024: INTERIM STATUS GROUNDWATER QUALITY ASSESSMENT PLAN FOR THE SINGLE SHELL TANK WASTE MANAGEMENT AREA TX-TY DOE/RL-2009-67 REVISION 1
0091265 29-Oct-2012 13-AMRP-0007 13-AMRP-0007: US DEPARTMENT OF ENERGY RICHLAND OPERATIONS (RL) PREPARATION OF REMEDIAL INVESTIGATION/FEASIBILITY STUDIES (RI/FS) AND PROPOSED PLANS FOR THE RIVER CORRIDOR AND OPERABLE UNITS FOR THE CENTRAL PLATEAU
0091269 29-Oct-2012 13-AMRP-0022,DOE/RL-2008-60 1 13-AMRP-0022: INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE 216-B-63 TRENCH DOE/RL-2008-60 REV 1