Advanced Search Results
Displaying 1-100 of 616 records found of 103,321

Where           Original Author     eq     "JB Price"
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
0063767H 06-Mar-2019 19-NWP-038 Completion of PCHB No. 17-084 Notice of Penalty Docket No. 15342 and Corrective Action 2 of PCHB No. 17-084 Administration Order Docket No. 15343, RCRA Site ID: WA7890008967
0063768H 06-Mar-2019 19-NWP-040 State Environmental Policy Act (SEPA) workshop responses
0063858H 22-Feb-2019 Not listed. Extension At The Project Manager Level For The Tri- Party Agreement Dispute Regarding Disapproval Of Change Control Form M-15-18-03
0064425H 02-Nov-2018 18-NWP-179 STATE ENVIRONMENTAL POLICY ACT (SEPA) SCOPING FOR PERMA-FIX NORTHWEST DANGEROUS WASTE REGULATIONS PERMIT
0064647H 27-Sep-2018 M-92-18-03 NEW INTERIM MILESTONE M-092-21 (CESIUM AND STRONTIUM CAPSULES)
0064648H 27-Sep-2018 M-92-18-02 MODIFICATION OF INTERIM MILESTONE M-092-09 (BULK SODIUM)
0064696H 18-Sep-2018 Not listed. EXTENSION TO THE AGREEMENT IN PRINCIPLE FOR THE NEGOTIATION OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (HFFACO) MILESTONE M-091 SERIES
0064644H 13-Sep-2018 Not listed. LIFECYCLE REPORT PROJECT MANAGER S MEETING SEPTEMBER 13 2018
0064808H 29-Aug-2018 18-NWP-033 STATE ENVIRONMENTAL POLICY ACT (SEPA) SCOPING FOR PERMA-FIX NORTHWEST DANGEROUS WASTE REGULATIONS PERMIT
0064721H 13-Jun-2018 Not listed. LIFECYCLE REPORT PROJECT MANAGERS MEETING JUNE 13 2018
0066196H 06-Mar-2018 18-NWP-041 DEPARTMENT OF ECOLOGY (ECOLOGY) APPROVAL OF THE UNITED STATES DEPARTMENT OF ENERGY - OFFICE OF RIVER PROTECTION (USDOE-ORP) REQUEST FOR A 30-DAY EXTENSION FOR THE ALLOWABLE ACCUMULATION PERIOD OF MIXED WASTE FOR THE SINGLE SHELL TANK (SST) AX-02A PUMP
0065353H 01-Mar-2018 Not listed. LIFECYCLE REPORT PROJECT MANAGERS MEETING MARCH 1 2018
0066961H 28-Dec-2017 M-91-17-02 TARGET DATES FOR ACQUISITION OF CAPABILITIES FOR HANFORD SITE RH TRUM AND TRUM WASTE
0067075H 19-Dec-2017 17-NWP-188 RESPONSE TO PLUTONIUM URANIUM EXTRACTION (PUREX) WHITE POWDER DANGEROUS WASTE DESIGNATION FOR CORRECTIVE ACTION 1 IN ADMINISTRATIVE ORDER (DOCKET # 15343)
0067526H 30-Nov-2017 17-NWP-178 CONFIRMATION OF DEADLINE EXTENSION TO CORRECTIVE ACTION 1 IN ADMINISTRATIVE ORDER (DOCKET # 15343)
0067953H 30-Oct-2017 17-NWP-158 RESPONSE TO REQUEST FOR DEADLINE EXTENSION TO CORRECTIVE ACTION 1 IN ADMINISTRATIVE ORDER (DOCKET # 15343)
0068683H 31-Aug-2017 17-NWP-113 ADMINISTRATIVE ORDER DOCKET #15343
0068684H 31-Aug-2017 15342,17-NWP-112 NOTICE OF PENALTY INCURRED AND DUE DOCKET #15342
0072141H 06-Mar-2017 17-NWP-024 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI-PARTY AGREEMENT) CHANGE PACKAGE C-16-02 AND C-17-01
0072267H 14-Feb-2017 17-AMRP-0103 EXTENSION AT THE IAMIT LEVEL FOR THE HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI-PARTY AGREEMENT) DISPUTE REGARDING WASHINGTON STATE DEPARTMENT OF ECOLOGY RESPONSE TO PUREX SURVEILLANCE AND MAINTENANCE PLAN REVIEW COMMENT RECORD NUMBER 8 (16-NWP-166)
0073493H 06-Dec-2016 16-NWP-210 DEPARTMENT OF ECOLOGY (ECOLOGY) REVIEW OF REQUEST FOR EXTENSION TO SCHEDULE FOR IMPLEMENTATION OF ACTIONS REGARDING CONTAINER #Z7610-210
0074512H 20-Oct-2016 16-NWP-175 16-NWP-175: DANGEROUS WASTE COMPLIANCE INSPECTION ON JUNE 13 2016 AT THE CENTRAL WASTE COMPLEX RCRA SITE ID WA7890008967 NWP COMPLIANCE INDEX NO 16.575
0074513H 19-Oct-2016 16-NWP-177 16-NWP-177: DEPARTMENT OF ECOLOGY (ECOLOGY) REVIEW OF RESPONSE TO DANGEROUS WASTE COMPLIANCE INSPECTION ON MARCH 23 2016 AT THE WASTE RECEIVING AND PROCESSING FACILITY RCRA SITE ID WA7890008967 NWP COMPLIANCE INDEX NO 16.556
0074666H 13-Oct-2016 Not listed. MEETING MINUTES: OFFICE OF RIVER PROTECTION TRI PARTY AGREEMENT QUARTERLY MILESTONE REVIEW MEETING MINUTES AUGUST 18 2016
0074667H 11-Oct-2016 Not listed. MEETING MINUTES: INTER-AGENCY MANAGEMENT INTEGRATION TEAM (IAMIT) MEETING MINUTES SEPTEMBER 28 2016
1610060607 28-Sep-2016 16-TF-0111,2016-006 16-TF-0111: HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER INTERAGENCY MANAGEMENT INTEGRATION TEAM (IAMIT) DECISION / DETERMINATION / ACTION ASSIGNMENT NUMBER 2016-006
0075021H 15-Sep-2016 16-TF-0105 16-TF-0105: RESOLUTION OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER INTERAGENCY MANAGEMENT INTEGRATION TEAM DECISION / DETERMINATION / ACTION ASSIGNMENT NO 2016-005
0075535H 10-Aug-2016 12901,16-NWP-138 16-NWP-138 AND 12901: DOCKET NO 12901 STIPULATED PENALTY FOR HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) MILESTONE M-045-92
0075548H 10-Aug-2016 12901 12901: NOTICE OF STIPULATED PENALTY INCURRED AND DUE NO 12901
0076318H 16-Jun-2016 16-NWP-105 16-NWP-105: NUCLEAR WASTE PROGRAM GUIDANCE FOR ASSESSING INSPECTION REQUIREMENTS IN THE DRAFT HANFORD FACILITY DANGEROUS WASTE PERMIT REVISION 9 WA7890008967 INSPECTION REQUIREMENTS CONCEPTUAL AGREEMENT PACKAGE JANUARY 2016
0076493H 02-Jun-2016 16-TF-0063 16-TF-0063: HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER INTERAGENCY MANAGEMENT INTEGRATION TEAM (IAMIT) DECISION / DETERMINATION / ACTION ASSIGNMENT NUMBER 2016-004 EXTENSION OF TPA DISPUTE ON THE DISAPPROVAL OF CHANGE CONTROL FORM M-45-15-01 INTERIM MILESTONE M-045-92 INSTALLATION OF BARRIERS
0076811H 18-May-2016 16-NWP-095 16-NWP-095: HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) CHANGE CONTROL FORM CHANGE NUMBER M-91-16-01 DATED 02/18/2016
0077122H 21-Apr-2016 16-NWP-067 16-NWP-067: HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (HFFACO) CHANGE CONTROL FORM CHANGE NUMBER M-89-16-01 DATED 02/02/2016
0077368H 24-Mar-2016 16-NWP-059 16-NWP-059: RESPONSE TO SUBMITTAL OF THE HANFORD FACILITY NONCOMPLIANCE REPORT FOR CALENDAR YEAR (CY) 2015 (PERMIT CONDITION I.E.19)
0077973H 01-Mar-2016 16-NWP-047 16-NWP-047: NUCLEAR WASTE PROGRAM GUIDANCE FOR ASSESSING CLOSURE REQUIREMENTS IN THE DRAFT HANFORD FACILITY DANGEROUS WASTE PERMIT REVISION 9 WA7890008967 CLOSURE REQUIREMENTS CONCEPTUAL AGREEMENT PACKAGE NOVEMBER 2015
1602220290 08-Feb-2016 16-NWP-029 16-NWP-029: RESPONSE TO COMPLETION OF MILESTONE M-036-01F 2016 HANFORD LIFECYCLE SCOPE SCHEDULE AND COST REPORT HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT)
1511050455 30-Oct-2015 15-NWP-191 15-NWP-191: NUCLEAR WASTE PROGRAM GUIDANCE FOR ASSESSING GROUNDWATER MONITORING REQUIREMENTS IN THE DRAFT HANFORD FACILITY DANGEROUS WASTE PERMIT REVISION 9 WA7890008967 GROUNDWATER MONITORING REQUIREMENTS CONCEPTUAL AGREEMENT PACKAGE OCTOBER 2015
1509240691 21-Sep-2015 15-NWP-126 15-NWP-126: NUCLEAR WASTE PROGRAM GUIDANCE FOR ASSESSING POST-CLOSURE REQUIREMENTS IN THE DRAFT HANFORD FACILITY DANGEROUS WASTE PERMIT REVISION 9 WA7890008967 (POST-CLOSURE REQUIREMENTS CONCEPTUAL AGREEMENT PACKAGE) SEPTEMBER 2015
0080678H 15-Jul-2015 15-NWP-129 15-NWP-129: REVIEW OF FACILITY COMPLIANCE AT THE CENTRAL WASTE COMPLEX (CWC) AND LOW LEVEL BURIAL GROUNDS (LLBG) TRENCHES 31 AND 34
1505110181 06-May-2015 15-NWP-083 LETTER 15-NWP-083: RESPONSE TO MISSION SUPPORT ALLIANCE LETTER MSA-1501229A R1 DATED APRIL 14 2015 RESPONSE TO NOTICE OF VIOLATION CATEGORICAL STATE WASTE DISCHARGE PERMIT NUMBER ST0004511 ST 4511 PERMIT
1505051193 29-Apr-2015 15-NWP-080 15-NWP-080: COMPLETION OF MILESTONE M-036-01E 2015 HANFORD LIFECYCLE SCOPE SCHEDULE AND COST REPORT HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT)
1504211404 17-Apr-2015 15-NWP-075 LETTER 15-NWP-075: HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) CHANGE CONTROL FORM CHANGE NUMBER M-045-15-01 DATED MARCH 3 2015
0084847 19-Aug-2014 14-NWP-172 14-NWP-172: REVISED NUCLEAR WASTE PROGRAM GUIDANCE FOR ASSESSING SECURITY REQUIREMENTS IN THE DRAFT HANFORD FACILITY DANGEROUS WASTE PERMIT REVISION 9 WA7890008967 (SECURITY REQUIREMENTS - CONCEPTUAL AGREEMENT PACKAGE) AUGUST 2014
0084898 31-Jul-2014 M-62-14-01 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM DELETION OF TPA MILESTONE M-062-40ZZ THE ONE TIME HANFORD TANK WASTE SUPPLEMENTAL TREATMENT TECHNOLOGIES REPORT
1408040271 24-Jul-2014 14-NWP-153 LETTER 14-NWP-153: NUCLEAR WASTE PROGRAM GUIDANCE FOR ASSESSING SECURITY REQUIREMENTS IN THE DRAFT HANFORD DANGEROUS WASTE PERMIT REVISION 9 WA7890008967 SECURITY REQUIRMENTS CONCEPTUAL AGREEMENT PACKAGE
0085664 18-Apr-2014 14-NWP-072,DOE/RL-2013-02 1 Completion of Fiscal Year (FY) 2014 Hanford Lifecycle Scope, Schedule and Cost Report - Hanford Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-036-01D
1306040211 22-May-2013 13-NWP-052 13-NWP-052: DEPARTMENT OF ECOLOGY COMPLIANCE EVALUATION INSPECTION OF THE TPLANT COMPLEX REFERRAL TO THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 10
1304031015 25-Mar-2013 13-NWP-032 RE: HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) CHANGE PACKAGE M-85-13-01
1210090084 27-Sep-2012 12-NWP-157 RE: DANGEROUS WASTE COMPLIANCE INSPECTION AT UNITED STATES DEPARTMENT OF ENERGY HANFORD FACILITY CENTRAL WASTE COMPLEX (CWC) ON MARCH 7, 8, 14, 15, 2012
1209200618 13-Sep-2012 12-NWP-152,M-85-12-01 RE: HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) CHANGE PACKAGE M-085-12-01
1207240704 19-Jul-2012 12-NWP-122 RE: DOCKETT NUMBER 9402 STIPULATED PENALTY HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT MILESTONE M-047-06
1207180241 12-Jul-2012 12-NWP-118 NOTICE OF VIOLATION FOR MISSED MILESTONE M-047-06
1207160013 06-Jul-2012 12-NWP-114 RE:CENTRAL WASTE COMPLEX DANGEROUS WASTE STORAGE INVENTORY REQUEST FOR THE OPERATING RECORD
1206051483 24-May-2012 12-NWP-081 ADDITIONAL INFORMATION REQUEST INVESTIGATION OF BOX 231-Z-DR-11
1205170979 15-May-2012 12-NWP-079,C-12-02,M-15-12-02 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT CHANGE PACKAGE C-12-02 AND M-15-12-02
1205150936 07-May-2012 12-NWP-074 DEPARTMENT OF ECOLOGYS (ECOLOGY) COMMENTS AND APPROVAL TO PROCEED ON THE CHPRC ENGINEERING STRUCTURAL ASSESSMENT PROPOSAL FOR BOX 231-Z-DR-11
1203260895 22-Mar-2012 12-NWP-039 IMMEDIATE ACTION REQUIRED HAND DELIVERED AND CERTIFIED MAIL DANGEROUS WASTE COMPLIANCE INSPECTION AT OPERATING UNIT GROUP 6 HANFORD CENTRAL WASTE COMPLES FACILITY RCRA SITE ID: WA 7890008967
1203090189 27-Feb-2012 12-NWP-030,M-15-11-07 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT CHANGE PACKAGE M-15-11-07
1202131354 08-Feb-2012 12-NWP-016 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) CHANGE PACKAGE M-15-11-06
1112020808 30-Nov-2011 11-NWP-145 COMMENTS ON DRAFT ENVIRONMENTAL ASSESSMENT EA ON THE DISPOSAL OF DECOMMISSIONED DEFUELED NAVAL REACTOR PLANTS FROM THE USS ENTERPRISE
1109213028 15-Sep-2011 11-NWP-105,M-15-11-03,M-83-11-01,M-85-11-01 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT CHANGE PACKAGE M-15-11-03 M-83-11-01 AND M-85-11-01
1108302638 25-Aug-2011 11-NWP-099 AGREEMENT IN PRINCIPLE MILESTONE M-045-100 CATCH TANK ASSUMED LEAK RESPONSE PLAN
1108181092 11-Aug-2011 11-NWP-090,C-11-05 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT CHANGE PACKAGE C-11-05
1107250103 15-Jul-2011 11-NWP-073 THE WHITE BLUFFS SUBSTATION
1107060713 30-Jun-2011 11-NWP-067,M-16-11-09,M-16-11-10,M-16-11-11,M-16-11-12 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT CHANGE PACKAGES M-16-11-09 M-16-11-10 M-16-11-11 M-16-11-12 AND M-16-11-13
1106271459 15-Jun-2011 11-NWP-59,M-15-11-02 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT CHANGE PACKAGE M-15-11-02
1105200945 18-May-2011 11-NWP-43 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT CHANGE PACKAGE C-11-02
1105120492 09-May-2011 11-NWP-36,C-11-03 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT CHANGE PACKAGE C-11-03
1101130511 06-Jan-2011 M-45-10-01 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT CHANGE PACKAGE M-45-10-01
1007160820 09-Jul-2010 Not listed. DEPARTMENT OF ECOLOGY EVALUATION OF THE FEASIBILITY STUDY FOR 200-PW-1 200-PW-3 AND 200-PW-6 HANFORD SITE BENTON COUNTY WASHINGTON OPERABLE UNITS
1007020359 29-Jun-2010 Not listed. RESPONSE TO HANFORD ADVISORY BOARD HAB ADVICE #232 AND #234 SELECTING PROJECTS FOR ADDITIONAL ARRA FUNDING AND FISCAL YEAR 2012 BUDGET REQUESTS
1005030690 29-Apr-2010 Not listed. UNITED STATES DEPPARTMENT OF ENERGY (USDOE) LETTER 10-AMCP-0109 DATED MARCH 23 2010 CORRECTIVE ACTION CLASS 3 PERMIT MODIFICATION REQUEST TO THE HANFORD FACILITY RCRA PERMIT IN SUPPORT OF THE CENTRAL PLATEAU CLEANUP STRATEGY
1105241513 13-Jan-2010 Not listed. HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT CHANGE PACKAGE AGREEMENT IN PRINCIPLE M-045-02O
0912150312 14-Dec-2009 M-15-09-07 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT CHANGE PACKAGE M-15-09-07
0911300908 20-Nov-2009 M-15-09-06 HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) CHANGE PACKAGE M-15-09-06
0812290600 15-Oct-2009 FH-0802480 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS OCTOBER 15 2008
0908060916 30-Jul-2009 Not listed. HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT FORM (TRI PARTY AGREEMENT) CHANGE PACKAGE M-24-09-01
0085734 30-Jun-2009 DOE/RL-2009-32 0 DOE/RL-2009-32 REV 0: 100-NR-2 GROUNDWATER OPERABLE UNIT SR-90 PLUME RIVERSHORE SAMPLING AND ANALYSIS PLAN
0907010824 18-Jun-2009 CHPRC-0900225.2 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS JUNE 18 2009
1004120569 20-May-2009 DOE/RL-2008-11,TPA-CN-281 0 CHANGE NOTICE FOR MODIFYING APPROVED DOCUMENTS/WORKPLANS IN ACCORDANCE WITH THE TRI PARTY AGREEMENT ACTION PLAN SECTION 9.0 DOCUMENTATION AND RECORDS DOE/RL-2008-11 REV 0 REMEDIAL INVESTIGATION WORK PLAN FOR HANFORD SITE RELEASES TO THE COLUMBIA RIVER
1004120570 14-May-2009 DOE/RL-2008-11,TPA-CN-282 0 CHANGE NOTICE FOR MOFIFYING APPROVED DOCUMENTS/WORKPLANS IN ACCORDANCE WITH THE TRI PARTY AGREEMENT ACTION LAN SECTION 9.0 DOCUMENTATION AND RECORDS DOE/RL-2008-11 REV 0 REMEDIAL INVESTIGATION WORK PLAN FOR HANFORD SITE RELEASES TO THE COLUMBIA RIVER
0905131260 08-May-2009 Not listed. 200 WEST AREA 200-ZP-1 PUMP AND TREAT REMEDIAL DESIGN REMEDIAL ACTION WORK PLAN DOE/RL-2008-78 DRAFT A
0904240162 16-Apr-2009 Not listed. CLEANUP VERIFICATION PACKAGE FOR THE SOIL COLUMN OF THE 116-N-1 CRIB AND TRENCH CVP-2006-00004 REVISION 1
0906180643 14-Apr-2009 100-H-55 DISCOVERY SITE EVALUATION CHECKLIST WIDS SITE CODE 100-H-55 WIDS SITE NAME 100-H-55 CAST IRON PIPE
0904011649 19-Mar-2009 CHPRC 09-00140 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS MARCH 19 2009
0904240163 18-Mar-2009 2006-018 WASTE SITE RECLASSIFICATION FORM OPERABLE UNIT 100-NR-1 WASTE SITE CODE 116-N-1
0904130556 12-Mar-2009 Not listed. MEETING MINUTES UNIT MANAGER MEETING 100 AREA 300 AREA UNIT MANAGER MEETING FEBRUARY 12 2009
0904011641 06-Mar-2009 Not listed. AIR MONITORING PLAN FOR THE 100H AREA REMAINING SITES AND BURIAL GROUNDS REMEDIAL ACTION
0904011633 04-Mar-2009 Not listed. TRANSMITTAL OF SIGNED COPY OF EXPLANATION OF SIGNIFICANT DIFFERENCES FOR THE INTERIM ACTION RECORD OF DECISION FOR THE 200-UP-1 GROUNDWATER OPERABLE UNIT
0903110447 03-Mar-2009 Not listed. DEPARTMENT OF ECOLOGY'S COMMENTS ON ENGINEERING EVALUATION/COST ANALYSIS FOR THE 200-MG-1 OPERABLE UNIT WASTE SITE DOE/RL-2008-44 DRAFT A AND COST EXTIMATE FOR THE 200-MG-1 OPERABLE UNIT ENGINEERING EVALUATION/COST ANALYSIS REMOVAL ACTIONS SGW-38383 REV 0
0902180680 12-Feb-2009 Not listed. PROPOSAL FOR TWO DAY WORKSHOP TO RESUME AND COMPLETE THE HEXONE STORAGE AND TREATMENT FACILITY CLOSURE PLAN DOE/RL-92-40 REVISION 0
0901300156 27-Jan-2009 Not listed. PROPOSAL FOR TWO DAY WORKSHOP TO RESOLVE COMMENTS ON THE 241-CX TANK SYSTEM CLOSURE PLAN DOE/RL-2008-51 REVISION 0
0901300158 27-Jan-2009 CHPRC-0900020 MEETING MINUTES TRANSMITTAL/APPROVAL PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS JANUARY 15 2009
0901220523 09-Jan-2009 Not listed. DEPARTMENT OF ECOLOGY REVIEW COMMENTS ON THE REMEDIAL DESIGN REPORT/REMEDIAL ACTION WORK PLAN FOR THE 100 AREA REVISION 6 DRAFT A DOE/RL-96-17 AND 100 AREA REMEDIAL ACTION SAMPLING AND ANALYSIS PLAN REVISION 5 DRAFT A DOE/RL-96-22
0901080178 02-Jan-2009 Not listed. LINER FOR SURFACE SOILS CONTAMINATED WITH HEXAVALENT CHROMIUM AT 100D AREA
0812290601 18-Dec-2008 CHPRC-0800215 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE COPERABLE UNITS DECEMBER 18 2008
0901300161 16-Dec-2008 142716 100 AREA AND 300 AREA UNIT MANAGERS MEETING APPROVAL OF MEETING MINUTES NOVEMBER 13 2008
0812180776 11-Dec-2008 Not listed. EXTENSION OF THE DEPARTMENT OF ECOLOGYS REVIEW OF THE REMOVAL ACTION WORK PLAN 100N ANCILLARY FACILITIES DOE/RL-2002-70 REVISION 3
0812180777 11-Dec-2008 Not listed. 100D AREA LEAD REGULATORY AGENCY REQUEST FOR REMEDIAL DESIGN FOR REVIEW AND APPROVAL
0812180779 08-Dec-2008 Not listed. EXTENSION OF THE DEPARTMENT OF ECOLOGYS REVIEW OF THE REMEDIAL DESIGN REPORT/REMEDIAL ACTION WORK PLAN FOR THE 100 AREA DOE/RL-96-17 REVISION 6 DRAFT A AND 100 AREA REMEDIAL ACTION SAMPLING AND ANALYSIS PLAN DOE/RL-96-22 REVISION 5 DRAFT A