Advanced Search Results
Displaying 1-61 of 61 records found of 103,189

Where           Original Company     eq     "Washington State Department of Ecology"
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
AR-01175 18-Apr-2019 19-NWP-062 N/A Need for Department of Ecology's Approval of Pending Notice of Construction Application for the 241-A and 241-AX Tank Farm Exhausters
AR-01176 18-Apr-2019 19-NWP-063 N/A Notice of Incompleteness Determination for the Criteria and Toxics Air Emissions Notice of Construction for the Operation of Portable Exhausters Supporting Single-Shell Tank Waste Retrieval at the 241-A and 241-AX Tank Farms, (TOC-ENV-NOC-5252)
AR-01170 17-Apr-2019 N/A N/A Extension at the Project Management Level for the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Dispute Regarding Disapproval of Change Control Form M-16-18-01
AR-01172 17-Apr-2019 N/A N/A Hanford Federal Facility Agreement and Consent Order (HFFACO) Agreement in Principle Extension of Negotiations of Hanford Federal Facility and Consent Order Revisions for Hanford Tank Waste Treatment and Disposition Schedules and Processes
AR-01166 15-Apr-2019 19-NWP-069 N/A Approval of the United States Department of Energy's Extension Request for Proposed Plan for Remediation of the 100-NR-1 and 100-NR-2 Operable Unites, DOE/RL-2012-68, Draft B, and Remedial Investigation/Feasibility Study for the 100-NR-1 and 100-NR-2 Operable Units, DOE/RL-2012-15, Draft B
AR-01167 15-Apr-2019 19-NWP-070 N/A Approval of the United States Department of Energy's Request for Extension for Comment Response and Plan for Document Update: 200-BP-5 and 200-PO-1 Groundwater Operable Unit Feasibility Study for Interim Action, DOE/RL-2018-30, Draft A
AR-01177 15-Apr-2019 19-NWP-067 N/A Completion of 2019 Hanford Lifecycle Scope, Schedule and Cost Report (LCR) - Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-036-01I
AR-01178 15-Apr-2019 19-NWP-057 N/A 24590-LAB-PCN-ENV-19-002 and 24590-LAW-PCN-ENV-19-002, Class 11 Modifications to the Hanford Facility Resource Conservation and Recovery Act Permit, Dangerous Waste Portion, Revision 8C, for the Treatment, Storage, and Disposal of Dangerous Waste, Part ill, Operating Unit Group 10, Waste Treatment and Immobilization Plant (WTP Permit), WA7890008967
AR-01165 12-Apr-2019 19-NWP-064 N/A Tri-Party and Public Participation in Test Bed Initiative
AR-01163 11-Apr-2019 19-NWP-058 N/A Nuclear Waste Program Guidance for Assessing Process Information Requirements in the Draft Hanford Facility Dangerous Waste Permit, Revision 9 - WA7890008967, (Process Information Requirements - Conceptual Agreement Package), April 2019
AR-01164 10-Apr-2019 19-NWP-066 N/A Department of Ecology's (Ecology) Review of Response to Dangerous Waste Compliance Inspections on March 8, 2016 and May 18, 2017, at the Double Shell Tank System, RCRA Site ID: WA7890008967, NWP Compliance Index No 16.554 and 17.592
AR-01168 08-Apr-2019 19-NWP-061 N/A Close-Out Inspection Report for Discharge Points: 1.4.38, 1.4.43, 1.4.71, 1.4.77, and 1.4.78
AR-01131 04-Apr-2019 DOE/RL-2016-41 0 Non-Significant Change for the Action Memorandum for 200-BP-5 Operable Unit Groundwater Extraction (DOE/RL-2016-41, Rev. 0) November 2016; Memo to File Regarding: Eliminating the Limitation on the Pumping Rate for the Wells Extracting Groundwater from the B Complex
AR-01114 02-Apr-2019 Not listed. Extension at the Interagency Management Integration Team (IAMIT) Level for the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Denial of the U.S. Department of Energy, Office of River Protection Request for Waiver to Hanford Federal Facility Agreement and Consent Order Waste Retrieval Criteria for Single-Shell Tank 241-C-106
AR-01116 02-Apr-2019 C-19-01 Update the Tri-Party Agreement (TPA) Action Plan Appendix C Footnote Definition
AR-01117 01-Apr-2019 19-NWP-056 Technical Review and Completeness Determination for the Class 3 Permit Modification to the Hanford Facility Resource and Conservation and Recovery Act (RCRA) Permit, Dangerous Waste Portion, Revision 8C, for the Treatment, Storage, and Disposal of Dangerous Waste, Part III, Operating Unit Group 14, Waste Encapsulation and Storage Facility (WESF) WA7890008967, Received November 20, 2017 (Reference 1)
AR-01132 01-Apr-2019 19-NWP-052 N/A Approval of the Proposed Class 2 Permit Modification 8C.2019.1F to the Hanford Facility Resource Conservation and Recovery Act Permit, Dangerous Waste Portion, Revision 8C, for the Treatment, Storage, and Disposal of Dangerous Waste, WA7890008967 (Site-wide Permit) Permit Attachment 3, Security
AR-01110 28-Mar-2019 2019-002 Interagency Management Integration Team (IAMIT) Determination 2019-002, Agreement Not to Perform Unfiltered Hexavalent Chromium [Cr(VI)] Sampling
AR-01138 27-Mar-2019 Not listed. Waste Encapsulation and Storage Facility (WESF) Project Managers Meeting February 28, 2019, Meeting Minutes
AR-01088 22-Mar-2019 19-NWP-053 N/A Approval of 24590-WTP-PCN-ENV-18-013, Class 1 Modification to the Hanford Facility Resource Conservation and Recovery Act Permit, Dangerous Waste Portion, Revision 8C, for the Treatment, Storage, and Disposal of Dangerous Waste, Part III, Operating Unit Group 10, Waste Treatment and Immobilization Plant (WTP Permit), WA7890008967
AR-01089 21-Mar-2019 19-NWP-054 N/A Additional Extension of the Department of Ecology's (Ecology) Comment Review Period for the Remedial Design/Remedial Action Work Plan for the 100-DR-1, 100-DR-2, 100-HR-1, 100-HR-2, and 100-HR-3 Operable Units, DOE/RL-2017-13, Draft A, and the Remedial Action Waste Management Plan for the 100-DR-1, 100-DR-2, 100-HR-1, 100-HR-2, and 100-HR-3 Operable Units, DOE/RL-2017-39, Draft A
AR-01100 21-Mar-2019 CHPRC-1901099 N/A 100 Area 300 Area Unit Managers Meeting March 21, 2019
AR-01101 21-Mar-2019 CHPRC-1901098 N/A Project Managers Meeting 200 Area Groundwater and Source Operable Unit March 21, 2019, Final Meeting Minutes
AR-01083 21-Mar-2019 N/A N/A Extension at the Interagency Management Integration Team (IAMIT) Level for the Hanford Federal Facility Agreement and Consent order (Tri-Party Agreement) Dispute Regarding Disapproval of Change Control Form M-15-18-03
AR-01084 21-Mar-2019 2018-003 N/A Interagency Management Integration Team (IAMIT) Determination Number 2018-003 Milestone M-091 Project Management Meeting (PMM) Documentation Determination
AR-01085 21-Mar-2019 2018-004 Interagency Management Integration Team (IAMIT) Determination Number 2018-004 Solid Waste Operation Complex (SWOC) - T Plant, Low Level Burial Ground, Waste Retrieval and Processing, and Central Waste Complex Project Management Meeting (PMM) Documentation Determination
AR-01086 21-Mar-2019 2018-005 N/A Interagency Management Integration Team (IAMIT) Determination Number 2018-005 Waste Encapsulation and Storage Facility (WESF) Project Management Meeting (PMM) Documentation Determination
AR-01069 18-Mar-2019 19-NWP-044 Air Operating Permit No. 00-05-06 Renewal 2 Revision B Compliance Certification for Calendar Year 2017
AR-01070 15-Mar-2019 19-NWP-036 Denial of Part A Form Submittal for the Double-Shell Tank (DST) Unit Group, for the Hanford Facility Resource Conservation and Recovery Act Permit, Dangerous Waste Portion, Revision 8C, for the Treatment, Storage, and Disposal of Dangerous Waste (Site-wide Permit), Part V, WA7890008967
AR-01064 15-Mar-2019 19-NWP-045 Dangerous Waste Compliance Inspection on September 27, 2018, at 400 Area Dangerous Waste Management Units (DWMU), RCRA Site ID: WA7890008967, NWP Compliance Index No. 18.652
AR-01065 15-Mar-2019 19-NWP-050 Notification the United States Department of Energy (USDOE) Actions Jeopardize Completion of Tri-Party Agreement (TPA) Milestone M-35-09K
AR-01066 14-Mar-2019 19-NWP-025 Approval of 24590-LAB-PCN-ENV-18-001, Class 1 Modification to the Hanford Facility Resource Conservation and Recovery Act Permit, Dangerous Waste Portion, Revision 8C, for the Treatment, Storage, and Disposal of Dangerous Waste, Part III, Operating Unit Group 10, Waste Treatment and Immobilization Plant (WTP Permit), WA7890008967
AR-01068 14-Mar-2019 19-NWP-051 Draft Technology Evaluation and Treatability Studies Assessment, DOE/RL-2017-58, Draft A, for the Hanford Central Plateau Deep Vadose Zone
AR-00062 14-Mar-2019 N/A N/A Agreement in Principle, Extension of Negotiations of Hanford Federal Facility and Consent Order Revisions for Hanford Tank Waste Treatment and Disposition Schedules and Processes
AR-01074 11-Mar-2019 19-NWP-035 Proposed Class 3 Permit Modification 8C.2018.8D of the Hanford Facility Resource Conservation and Recovery Act Permit, Dangerous Waste Portion 8C, for the Treatment, Storage, and Disposal of Dangerous Waste, Part V, Closure Unit Group 32, 276-BA Organic Storage Area, WA7890008967
AR-01139 28-Feb-2019 N/A N/A M-091 Milestone Project Managers Meeting February 28, 2019, Meeting Minutes
AR-01140 28-Feb-2019 N/A N/A Solid Waste Operations Complex (SWOC) Project Managers Meeting T-Plant, Low-Level Burial Ground (LLBG), Waste Receiving and Processing (WRAP), and Central Waste Complex (CWC), February 28, 2019, Meeting Minutes
AR-00031 27-Feb-2019 19-NWP-032 N/A Close-out inspection report for discharge points: 1.4.64, 1.4.65, 1.4.66 and 1.4.67
AR-00035 25-Feb-2019 19-NWP-033 N/A Determination on Closure Certification for the Dangerous Waste Storage Facility (DWSF) for the Dangerous Waste Management Permit, Framatome (formerly AREVA NP, Inc.), WAD 99082 8402 (Permit)
AR-00037 25-Feb-2019 19-NWP-034 N/A Department of Ecology Concerns with the Cumulative Impacts Evaluation Approach
AR-00051 22-Feb-2019 19-NWP-018 N/A Additional Requested Actions on Department of Ecology (Ecology) Dangerous Waste Compliance Inspections on June 27, 2018, at 216-B-3 Main Pond, 216-S-10 Pond and Ditch, 216-A-29 Ditch, 216-B-63 Trench, 216-A-36B Crib, and 216-A-37-1 Crib, RCRA Site ID: WA7890008967, NWP Compliance Index No 18.638 through 18.643
AR-00052 22-Feb-2019 19-NWP-029 N/A Notice of a 30-day Extension for a Decision on the Proposed Class 2 Permit Modification to the Hanford Facility Resource Conservation and Recovery Act Permit, Dangerous Waste Portion, Revision 8C, for the Treatment, Storage, and Disposal of Dangerous Waste, WA7890008967 (Site-wide Permit), Permit Attachment 3, Security
AR-01146 07-Feb-2019 N/A N/A Office of River Protection Tri-Party Agreement Monthly Project Manager Meeting Minutes February 7, 2019
AR-00023 31-Jan-2019 19-NWP-019 N/A Dangerous Waste Compliance Inspection on September 26, 2018 at 241-CX Tank Systems RCRA Site ID: WA7890008967, NWP Compliance Index No.: 18.651
AR-01072 31-Jan-2019 Not listed. Inter-Agency Management Integration Team (IAMIT) Meeting Minutes January 31, 2019
AR-00056 28-Jan-2019 19-NWP-015 N/A Polychlorinated Biphenyl (PCB) Method Analysis Selection for the 200-EA-1 Operable Unit Waste Site RCRA Facility Investigation/Corrective Measures Study and Remedial Investigation/Feasibility Study Work Plan, Draft A, (DOE/RL-2016-58)
AR-00057 28-Jan-2019 19-NWP-016 N/A Sensitivity Analysis on Recharge Rates for the 200-EA-1 Operable Unit Waste Site RCRA Facility Investigation/Corrective Measures Study and Remedial Investigation/Feasibility Study Work Plan (200-EA-1 Work Plan), Draft A, DOE/RL-2016-58
AR-01090 22-Jan-2019 N/A N/A Plutonium Finishing Plant (PFP) Project Managers Meeting Minutes, January 22, 2019
AR-01098 16-Jan-2019 N/A N/A Meeting Minutes, 222-S Project Managers' Meeting and Miscellaneous Laboratory Issues (TSD TS-2-1; Operating Unit 8) January 16, 2019
AR-00063 09-Jan-2019 Not listed. PNNL 300 Area Project Manager's Meeting January 9, 2019
AR-00016 09-Jan-2019 19-NWP-003 N/A DE02NWP-002, Revision 2, Request for Approval of Proposed Steam Plant Boiler Carbon Monoxide Direct-reading Measurement Device
AR-00017 09-Jan-2019 19-NWP-001 N/A Department of Ecology (Ecology) Review of Responses to Dangerous Waste Compliance Inspections (8), RCRA Site ID: WA7890008967, NWP Compliance Index Nos. 16.560, 16.575, 17.588, 17.590, 17.599, 18.626, 18.630, and 18.632
AR-01174 09-Jan-2019 N/A N/A M-035-09 Project Manager Meeting Minutes January 2019
AR-00055 07-Jan-2019 19-NWP-005 N/A Approval of the United States Department of Energy's Request for an Addditional Extension for Comment Response and Plan for Document Update on the 200-EA-1 Operable Unit Waste Site RCRA Facility Investigation/Corrective Measures Study and Remedial Investigation/Feasibility Study Work Plan, DOE/RL-2016-58, Draft A
AR-00015 21-Dec-2018 18-NWP-208 N/A Meeting with the Department of Ecology to Provide Information on the Revised Approach to the Test Bed Initiative (TBI)
AR-00004 20-Dec-2018 18-NWP-205 N/A Dangerous Waste Compliance Inspection on September 18, 2018 and October 11, 2018 at the 222-S Dangerous and Mixed Waste Treatment, Storage, and Disposal (TSD) Unit, RCRA Site ID: WA7890008967, NWP Compliance Index No. 18.648
AR-00003 13-Dec-2018 18-NWP-201 N/A Dangerous Waste Compliance Inspection on June 27, 2018 at the 216-B-3 Main Pond, 216-S-10 Pond and Ditch, 216-A-29 Ditch, 216-B-63 Trench, 216-A-36B Crib, and 216-A-37-1 Crib, RCRA Site ID: WA7890008967, NWP Compliance Index No's 18.638 to 18.643
AR-01173 06-Dec-2018 N/A N/A M-035-09 Project Manager Meeting Minutes December 2018
AR-00022 15-Nov-2018 N/A N/A November 15, 2018 Office of River Protection Tri-Party Agreement Quarterly Milestone Review Meeting Minutes
AR-01099 15-Nov-2018 CHPRC-1805537 N/A 200 Area Project Managers Meeting November 15, 2018
AR-01171 12-Sep-2018 N/A N/A 222-S Project Manager's Meeting and Miscellaneous Laboratory Issues (TSD:TS-2-1; Operating Unit 8)