The Administrative Record website will be upgraded on June 27, 2019. VisitĀ www.hanford.govĀ for more information.
  
Advanced Search Results
Displaying 1-14 of 14 records found of 103,460

Where           Document Type     eq     "B REACTOR"
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
1204260485 01-Jun-2011 DOE/RL-2001-68,MSA-1102952 1 DOE/RL-2001-68 DECISIONAL DRAFT REV 1: REMOVAL ACTION WORK PLAN AND SURVEILLANCE AND MAINTENANCE PLAN FOR THE 105-B REACTOR FACILITY
1204260484 01-Jun-2009 Not listed. DRAFT: REGULATORY STRATEGY FOR 105-B REACTOR PRESERVATION JUNE 2009
DA505904 08-Jul-2005 0502128 COMPLETION OF TPA MILESTONE M-93-25 SUBMIT AND ENGINEERING EVALUATION OF FINAL SURPLUS REACTOR DISPOSITION TO EPA AND ECOLOGY DUE SEPTEMBER 30 2005
D5805805 01-Jul-2004 DOE/RL-2004-55 A ENGINEERING EVALUATION COST ANALYSIS FOR FINAL CONFIGURATION OF 105-B REACTOR FACILITY
D1080319 01-Feb-2003 DOE/RL-2002-43 B EVALUATION OF FINAL CONFIGURATION ALTERNATIVES FOR 105-B REACTOR FACILITY
D1354345 27-Jun-2002 02-RCA-0414 TRANSMITTAL OF REMOVAL ACTION WORK PLAN AND SURVEILLANCE AND MAINTENANCE PLAN FOR 105-B REACTOR FACILITY
D9003789 01-Jan-2002 DOE/RL-2001-68 A REMOVAL ACTION WORK PLAN AND SURVEILLANCE AND MAINTENANCE PLAN FOR 105-B REACTOR B-REACTOR FACILITY
D8758524 01-Jun-2001 DOE/RL-2001-09 000 ENGINEERING EVALUATION COST ANALYSIS FOR 105-B REACTOR B-REACTOR FACILITY
D8723314 01-Apr-2001 DOE/RL-2001-09 A ENGINEERING EVALUATION COST ANALYSIS FOR 105-B REACTOR B-REACTOR FACILITY
D8406867 01-Jun-2000 BHI-01384 000 105-B REACTOR B-REACTOR MUSEUM FEASIBILITY ASSESSMENT PHASE II PROJECT
1204260483 18-Sep-1995 BHI-00076 0 105-B REACTOR FACILITY MUSEUM PHASE I FEASIBILITY STUDY REPORT
D196084645 01-Apr-1994 DOE/RL-93-06 000 LIMITED FIELD INVESTIGATION REPORT FOR 100-BC-1 OPERABLE UNIT
D196133902 01-Jul-1993 DOE/RL-93-06 A LIMITED FIELD INVESTIGATION REPORT FOR 100-BC-1 OU
1204260486 No date listed. RAM 09-001 RAM 09-001: DOCUMENTATION REQUIRED FOR 105-B REACTOR CONTINUED S&M ACTIVITIES AND OPERATION AS A PUBLIC MUSEUM