Advanced Search Results
Displaying 1-100 of 168 records found of 103,172

Where           Document Type     eq     "SPECIFICATIONS"
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
1504061038 05-Jun-2014 AIR 14-603 LETTER AIR 14-603: STANDARDS AND MAINTENANCE REQUIRMENTS FOR THE VENTILATION SYSTEM IN THE TANK FARM FACILITIES
D0384895 02-Dec-2002 SNF-8163 PERFORMANCE SPECIFICATION FOR 100-K EAST BASIN SLUDGE TRANSPORTATION SYSTEM PROJECT A.16
D199017671 17-Dec-1998 DOE/RL-98-48 C GROUNDWATER VADOSE ZONE INTEGRATION PROJECT SPECIFICATION
D199122776 29-Sep-1998 OSD-T-151-00007 H-21 OPERATING SPECIFICATIONS FOR 241-AN 241-AP 241-AW 241-AY 241-AZ AND 241-SY TANK FARMS
D198209200 01-Aug-1998 DOE/RL-98-48 A GROUNDWATER VADOSE ZONE INTEGRATION PROJECT SPECIFICATION
D199095636 14-Nov-1996 OSD-T-151-00007 H-18 OPERATING SPECIFICATIONS FOR 241-AN 241-AP 241-AW 241-AY 241-AZ AND 241-SY TANK FARMS
E0035237 11-Mar-1994 SD-EN-SDS-001 001 SYSTEM DESIGN DESCRIPTION FOR THE BASELINE ANALYSIS MATRIX VERSION 3.1
E0034799 28-Feb-1994 SD-EN-CDR-001 000 SYSTEM CONCEPT SPECIFICATION FOR THE BASELINE ANALYSIS MATRIX VERSION 3.1
E0032515 04-Nov-1993 WHC-S-0105 001 SPECIFICATION FOR DRILLING GEOTECHNICAL TEST BORINGS
E0035500 15-Oct-1993 C-018H-P2 000 PROCUREMENT SPECIFICATION FOR FIBERGLASS DOUBLE CONTAINMENT PIPING SYSTEM AND ASSOCIATED ENGINEERING SERVICES 242-A EVAPORATOR AND PUREX CONDENSATE EFFLUENT TREATMENT FACILITY WORK ORDER CR9583
E0035501 15-Oct-1993 C-018H-P3 000 PROCUREMENT SPECIFICATION COLLECTION SYSTEM LOCAL CONTROL UNIT AND MCS INTERFACE DEVICES: WORK ORDER CR9583
E0035502 15-Oct-1993 C-018H-C6 000 CONSTRUCTION SPECIFICATION FOR 242-A PUREX ETF COLLECTION SYSTEM WORK ORDER CR9583
E0035533 01-Oct-1993 C-018H-C7 000 CONSTRUCTION SPECIFICATION FOR 242-A, PUREX EFFLUENT TRANSFER LINE AND DRAIN FIELD: WORK ORDER CR9583
E0032888 27-Sep-1993 WDOE-630 HWVP TRANSMITTAL [SECTION 1 OF 4]
1107141077 27-Sep-1993 WDOE-630 HWVP TRANSMITTAL [SECTION 2 OF 4]
1107141078 27-Sep-1993 WDOE-630 HWVP TRANSMITTAL [SECTION 3 OF 4]
1107141079 27-Sep-1993 WDOE-630 HWVP TRANSMITTAL [SECTION 4 OF 4]
D196038931 20-Sep-1993 FRP-1194,WDOE-625 HWVP TRANSMITTAL A170
E0033358 15-Sep-1993 WDOE-612 HWVP TRANSMITTAL PO6A
E0031836 14-Sep-1993 WHC-S-0222 000 SPECIFICATION FOR IN-SITU CHARACTERIZATION PROBE SPECIFICATIONS
D196104163 09-Sep-1993 WDOE-600 HWVP TRANSMITTAL A170
E0033335 31-Aug-1993 WDOE-587 HWVP TRANSMITTAL
E0033336 30-Aug-1993 WDOE-588 HWVP TRANSMITTAL
E0033290 09-Aug-1993 WDOE-525 HWVP TRANSMITTAL P27A
1011300098 09-Aug-1993 WDOE-524 HWVP TRANSMITTAL [SECTION 5 OF 7]
1011300099 09-Aug-1993 WDOE-524 HWVP TRANSMITTAL [SECTION 6 OF 7]
1011300100 09-Aug-1993 WDOE-524 HWVP TRANSMITTAL [SECTION 7 OF 7]
1012030993 09-Aug-1993 WDOE-524 HWVP TRANSMITTAL [SECTION 1 OF 7]
1012030994 09-Aug-1993 WDOE-524 HWVP TRANSMITTAL [SECTION 2 OF 7]
1012030995 09-Aug-1993 WDOE-524 HWVP TRANSMITTAL [SECTION 3 OF 7]
1012030996 09-Aug-1993 WDOE-524 HWVP TRANSMITTAL [SECTION 4 OF 7]
D196130221 22-Jul-1993 EDT142535 200-BP-1 OU CONSTRUCTION SPECIFICATIONS AND DRAWINGS
D197188601 15-Jul-1993 FRP-1059,WDOE-500 HWVP TRANSMITTAL B210A
D196038918 14-Jul-1993 B-595-C-B210A,FRP-1059 HWVP TRANSMITTAL SPECIFICATION VITRIFICATION BUILDING FOUNDATION B-595-C-B210A
E0032839 23-Jun-1993 WDOE-473 HWVP TRANSMITTAL
E0032840 23-Jun-1993 WDOE-474 HWVP TRANSMITTAL
D196039262 15-Apr-1993 FRP-881,WDOE-395 HWVP TRANSMITTAL P06B
E0028285 12-Apr-1993 HS-BP-0041 CONTAINER METAL BOX FOR SHIPPING AND STORAGE OF SOLID LOW-LEVEL RADIOACTIVE MATERIAL
D196112336 02-Apr-1993 WDOE-385 HWVP TRANSMITTAL A160
D196112329 29-Mar-1993 WDOE-379 HWVP TRANSMITTAL P27A
D196112328 25-Mar-1993 WDOE-377 HWVP TRANSMITTAL B265A
D196115603 26-Feb-1993 WDOE-341 HWVP TRANSMITTAL B210A [SECTION 1 OF2]
D196115604 26-Feb-1993 WDOE-341 HWVP TRANSMITTAL B210A [SECTION 2 OF2]
D196115592 25-Feb-1993 WDOE-339 HWVP TRANSMITTAL
D196115595 25-Feb-1993 WDOE-339 R1 HWVP TRANSMITTAL
D196115894 09-Feb-1993 WDOE-322 HWVP TRANSMITTAL A900
D196115885 02-Feb-1993 WDOE-316 HWVP TRANSMITTAL [SECTION 1 OF 2]
D196115887 02-Feb-1993 WDOE-316 HWVP TRANSMITTAL [SECTION 2 OF 2]
D196132918 08-Jan-1993 W-106H-C3 003 CONSTRUCTION SPECIFICATION FOR RADIOACTIVE MIXED WASTE STORAGE FACILITIES
D196128188 21-Dec-1992 WDOE-285 HWVP TRANSMITTAL [SECTION 1 OF 4]
D196128194 21-Dec-1992 WDOE-285 HWVP TRANSMITTAL [SECTION 2 OF 4]
D196128196 21-Dec-1992 WDOE-285 HWVP TRANSMITTAL [SECTION 3 OF 4]
D196128197 21-Dec-1992 WDOE-285 HWVP TRANSMITTAL [SECTION 4 OF 4]
D196128454 21-Dec-1992 WDOE-287 HWVP TRANSMITTAL B265A
E0031447 14-Dec-1992 2W-92-01164/W 241-T REPAIR 241-T-101 FIC JCS WORK PACKAGE FOR SAMPLING TANK FARMS DRUMS
D196128835 25-Nov-1992 WDOE-267 HWVP TRANSMITTAL A120
D196128829 19-Nov-1992 WDOE-261 HWVP TRANSMITTAL A900
D196128906 17-Nov-1992 WDOE-260 HWVP TRANSMITTAL B210A [SECTION 7 OF 8]
D196128814 17-Nov-1992 WDOE-260 HWVP TRANSMITTAL B210A [SECTION 1 OF 8]
D196128819 17-Nov-1992 WDOE-260 HWVP TRANSMITTAL B210A [SECTION 2 OF 8]
D196128821 17-Nov-1992 WDOE-260 HWVP TRANSMITTAL B210A [SECTION 3 OF 8]
D196128822 17-Nov-1992 WDOE-260 HWVP TRANSMITTAL B210A [SECTION 4 OF 8]
D196128823 17-Nov-1992 WDOE-260 HWVP TRANSMITTAL B210A [SECTION 5 OF 8]
D196128824 17-Nov-1992 WDOE-260 HWVP TRANSMITTAL B210A [SECTION 6 OF 8]
D196128827 17-Nov-1992 WDOE-260 HWVP TRANSMITTAL B210A [SECTION 8 OF 8]
D196120927 04-Nov-1992 ECN W-105-215 ENGINEERING CHANGE NOTICE TO W-105-C3 REV 0 W-105 LERF 242-A EVAPORATOR CONDITION INTERIM RETENTION BASINS
D196130888 14-Oct-1992 WDOE-238 HWVP TRANSMITTAL P30A
D199042428 21-Sep-1992 9208200 TASK ORDER DE-AT06-90RL12103 UNDER MASTER INTERAGENCY AGREEMENT DE-AI06-90RL12074 1100-EM-1 OU REMEDIAL INVESTIGATION FEASIBILITY STUDY SURVEY AND MAPPING TECHNICAL SPECIFICATION
E0023295 16-Sep-1992 WHC-S-0105 000 SPECIFICATION FOR DRILLING GEOTECHNICAL TEST BORINGS
D196130843 02-Sep-1992 WDOE-208 HWVP TRANSMITTAL P27A
D196130816 25-Aug-1992 WDOE-196 HWVP TRANSMITTAL A170
D196130818 25-Aug-1992 WDOE-196 R1 HWVP TRANSMITTAL A170
D196132447 10-Aug-1992 ECN W-016H-102 ENGINEERING CHANGE NOTICE TO W-016H-C3 REV 2 CONSTRUCTION SPECIFICATION FOR RADIOACTIVE MIXED WASTE STORAGE FACILITIES
D196132456 01-Aug-1992 CR9808-C1 000 CONSTRUCTION SPECIFICATION FOR LOW-LEVEL RADIOACTIVE METAL WASTE STORAGE PADS
D196133865 29-Jul-1992 WDOE-177 HWVP TRANSMITTAL P190
D196133860 23-Jul-1992 WDOE-173 HWVP TRANSMITTAL P33A
E0024166 23-Jul-1992 W-011H-DC1 000 DESIGN CONSTRUCT SPECIFICATION FOR 6265 6265-A 6267 6269 6270 BUILDINGS
E0022535 22-Jul-1992 92-RPB-166,9203077 RESP0NSES TO ECOLOGY COMMENTS ON DESIGN DOCUMENTATION FOR PLUTONIUM FINISHING PLANT PFP LIQUID LOW-LEVEL WASTE SYSTEM MODIFICATION PROJECT B-680H
E0022384 22-Jul-1992 WHC-S-0119 001 VAPOR EXTRACTION SYSTEM CONTROL SYSTEM UPGRADE SPECIFICATION
E0029391 13-Jul-1992 WDOE-164 HWVP TRANSMITTAL
E0021993 07-Jul-1992 WHC-S-0119 000 VAPOR EXTRACTION SYSTEM CONTROL SYSTEM UPGRADE SPECIFICATIONS
E0029382 18-Jun-1992 WDOE-155 HWVP TRANSMITTAL
D196080244 12-Jun-1992 DE-AC06-91RL-11946 WRAP FACILITY MODULE 2A OUTLINE SPECIFICATIONS PROJECT 6237.006 [SECTION 1 OF 2]
D196080249 12-Jun-1992 DE-AC06-91RL-11946 WRAP FACILITY MODULE 2A OUTLINE SPECIFICATIONS PROJECT 6237.006 [SECTION 2 OF 2]
D196240605 10-Jun-1992 OSD-Z-184-00010 E-2 OPERATING SPECIFICATIONS FOR PLUTONIUM FINISHING PLANT PFP 241-Z WASTE FACILITY
D196131212 28-May-1992 WDOE-142 HWVP TRANSMITTAL P190
D196133694 19-May-1992 WDOE-136 HWVP TRANSMITTAL A170
D196133697 19-May-1992 WDOE-136 R1 HWVP TRANSMITTAL A170
D196133478 14-May-1992 WDOE-134 HWVP TRANSMITTAL A900
D196133479 14-May-1992 WDOE-135 HWVP TRANSMITTAL A910
D196133691 12-May-1992 WDOE-130 HWVP TRANSMITTAL A120 [SECTION 2 OF 2]
D196133471 12-May-1992 WDOE-131 HWVP TRANSMITTAL
D196133477 12-May-1992 WDOE-130 HWVP TRANSMITTAL A120 [SECTION 1 OF 2]
D196130189 21-Apr-1992 OSD-T-151-00013, TO-040-180 SINGLE-SHELL TANK OPERATING SPECIFICATIONS AND FIC OPERATION PROCEDURE
D196130192 21-Apr-1992 OSD-T-151-00013 D-1 OPERATING SPECIFICATIONS FOR SINGLE-SHELL WASTE STORAGE TANKS
E0022531 17-Apr-1992 B-680H-C1 000 CONSTRUCTION SPECIFICATIONS FOR PLUTONIUM FINISHING PLANT PFP LIQUID LOW-LEVEL WASTE SYSTEM MODIFICATION
E0022532 18-Mar-1992 Not listed. ONE HUNDRED PERCENT SUBMITTAL CALCULATIONS AND CUT SHEETS VOLUME ONE OF ELEVEN FOR PROJECT B-680H PLUTONIUM FINISHING PLANT PFP LIQUID LOW-LEVEL WASTE SYSTEM MODIFICATION
E0020458 05-Feb-1992 92-RPB-024,9201950 CONSTRUCTION SPECIFICATION AND DRAWINGS FOR PROJECT L-092 2751-E 2752-E 2753-E EMERGENCY DRAIN FIELD REPLACEMENT PURSUANT TO WAC 246-272 ONSITE SEWAGE SYSTEMS
E0029803 29-Jan-1992 OSD-T-151-00007 H-5 OPERATING SPECIFICATIONS FOR 241-AN 241-AP 241-AW 241-AY 241-AZ AND 241-SY TANK FARMS
D196086600 17-Jan-1992 SD-EN-TI-010 000 DESIGN OPERATION AND MONITORING OF VAPOR EXTRACTION SYSTEM AT 216-Z-1A TILE FIELD