Key Documents
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
No Key Documents Found


Advanced Search Results
Displaying 1-100 of 218 records found of 103,201

Where           Operable Unit     eq     "100-KR-3"
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
0065561H 28-Feb-2018 SL2804 SAF: S18-002 SITEWIDE SURV FEBRUARY 2018
0065622H 20-Dec-2017 ALS1711294 SAF: S18-011 SURV NOVEMBER 2017
0074645H 01-Sep-2016 ECF-HANFORD-15-0040 0 ECF-HANFORD-15-0040 REV 0: ANALYSIS OF WELL DEVELOPMENT DATA IN THE 100 AREAS
0071361H 27-Jun-2016 ECF-HANFORD-10-0429 2 DOCUMENTATION OF PRELIMINARY REMEDIATION GOALS (PRGs) FOR RADIONUCLIDES USING THE IAROD EXPOSURE SCENARIO FOR THE 100 AND 300 AREA REMEDIAL INVESTIGATION / FEASIBILITY STUDY (RI/FS) REPORT
0076173H 19-May-2016 SGW-46279 3 SGW-46279 REV 3: CONCEPTUAL FRAMEWORK AND NUMERICAL IMPLEMENTATION OF 100 AREAS GROUNDWATER FLOW AND TRANSPORT MODEL
1506301063 05-Jun-2015 TPA-CN-662 TPA-CN-662: REMEDIAL DESIGN REPORT/REMEDIAL ACTION WORK PLAN FOR THE 100 AREA DOE/RL-96-17 REVISION 6
1506301064 05-Jun-2015 TPA-CN-663 TPA-CN-663: REMEDIAL DESIGN AND REMEDIAL ACTION WORK PLAN FOR THE K BASINS INTERIM REMEDIAL ACTION 105K WEST BASIN DEACTIVATION DOE/RL-2010-52 REVISION 0
1506301065 05-Jun-2015 TPA-CN-664 TPA-CN-664: REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR THE 100 AREA REMAINING SITES INTERIM REMEDIAL ACTION 105K WEST BASIN DEMOLITION AND REMOVAL DOE/RL-2010-53 REVISION 0
1506301066 05-Jun-2015 TPA-CN-667 TPA-CN-667: REMOVAL ACTION WORK PLAN FOR 105KE/105KW REACTOR FACILITIES AND ANCILLARY FACILITIES DOE/RL-2005-26 REVISION 1
1506301069 05-Jun-2015 TPA-CN-665 TPA-CN-665: REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR THE K BASINS INTERIM REMEDIAL ACTION: REMOVAL OF K BASINS SLUDGE FROM THE RIVER CORRIDOR TO THE CENTRAL PLATEAU AND REMOVAL OF KNOCK OUT POT CONTENTS FROM THE K BASINS DOE/RL-2010-63 REVISION 0
1506301070 05-Jun-2015 TPA-CN-666 TPA-CN-666: REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR THE K BASINS INTERIM REMEDIAL ACTION: TREATMENT AND PACKAGING OF K BASINS SLUDGE DOE/RL-2011-15 REVISION 0
1010180129 06-Oct-2010 TPA-CN-359 TRI PARTY AGREEMENT TRI PARTY AGREEMENT CHANGE NOTICE FORM DOE/RL-2006-75 REV 1 REISSUE SUPPLEMENT TO THE 100-HR-3 AND 100-KR-4 REMEDIAL DESIGN REPORT AND REMEDIAL ACTION WORKPLAN FOR THE EXPANSION OF THE 100-KR-4 PUMP AND TREAT SYSTEM AS AMENDED BY TPA-CN-273 MAY 20 2009 DOE/RL-2006-52 REV 2 THE KW PUMP AND TREAT SYSTEM REMEDIAL DESIGN AND REMEDIAL ACTION WORK PLAN SUPPLEMENT TO THE 100-KR-4 GROUNDWATER OPERABLE UNIT INTERIM ACTION OCTOBER 2009
DA05893163 25-Jan-2007 FP0418 DATA PACKAGE SUMMARY ANALYTICAL LABORATORY I07-11 ISRM LOI NOVEMBER 2006 SAMPLING
DA05893151 08-Jan-2007 FP0417 DATA PACKAGE SUMMARY ANALYTICAL LABORATORY I07-022 ISRM LOI JANUARY 2007 SAMPLING
D9085067 30-Apr-2002 M-93-01-02 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM MODIFICATION OF TPA M-93 SERIES MILESTONES COMPLETE FINAL DISPOSITION OF ALL 100 AREA SURPLUS PRODUCTION REACTOR BUILDINGS
D9103891 01-Apr-2002 Not listed. HANFORD TPA MODIFICATIONS TO 100 AREA AND 300 AREA WASTE SITES AND FACILITIES CLEANUP MILESTONES TPA CHANGE REQUESTS AND COMMENT RESPONSE DOCUMENT M-16-01-05 M-16-01-06 M-93-01-02 M-94-01-01
D9147709 27-Feb-2002 Not listed. COMMENTS ON PROPOSED TPA MODIFICATIONS AND REFERENCE DOCUMENTS FOR 100 AREA AND 300 AREA WASTE SITES AND FACILITIES CLEANUP MILESTONES ENVIRONMENTAL RESTORATION PROJECT M-16-01-05 M-16-01-06 M-93-01-02 M-94-01-01
D8959592 30-Jan-2002 Not listed. PROPOSED TPA MODIFICATIONS AND REFERENCE DOCUMENTS FOR 100 AREA AND 300 AREA WASTE SITES AND FACILITIES CLEANUP MILESTONES ENVIRONMENTAL RESTORATION PROJECT M-16-01-05 M-16-01-06 M-93-01-02 M-94-01-01
D9118921 16-Nov-2000 M-93-00-01 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM B-REACTOR SURVEILLANCE AND MAINTENANCE PLAN
D197268152 12-Sep-1997 Not listed. RESPONSE TO COMMENTS FOR PROPOSED TPA MODIFICATIONS FOR DISPOSITION OF HANFORD SURPLUS REACTORS M-93-00
D197268156 12-Sep-1997 Not listed. RESPONSE TO COMMENTS FOR PROPOSED TPA MODIFICATIONS FOR DISPOSITION OF HANFORD SURPLUS REACTORS M-93-00
D197298922 05-Sep-1997 Not listed. BOARD CONSENSUS ADVICE 72 PROPOSED TPA MODIFICATIONS 100-K BASINS SPENT NUCLEAR FUEL PROJECT M-34-00A JULY 11 1997
D197268358 28-Aug-1997 M-93-97-01 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM NEGOTIATION OF INITIAL COMMITMENTS FOR COMPLETION OF HANFORD SURPLUS PRODUCTION REACTOR FINAL FACILITY DISPOSITION ESTABLISHMENT OF NEW TPA MAJOR MILESTONE SERIES M-93-00
D197268359 28-Aug-1997 A-97-01 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM MODIFICATIONS TO TPA ACTION PLAN APPENDIX A TO INCLUDE FACILITY DECOMMISSIONING PROCESS TERMS SURPLUS REACTOR NEGOTIATIONS
D197268360 28-Aug-1997 P-08-97-01 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM MODIFICATIONS TO TPA ACTION PLAN SECTION 8.0 TO REFLECT HANFORD SUPRLUS REACTOR DISPOSITION NEGOTIATED AGREEMENTS
D197268357 22-Aug-1997 97-EAP-622 APPROVAL OF TPA COMMITMENTS FOR DISPOSITION OF HANFORD SURPLUS REACTORS M-93-00
D197268154 11-Jul-1997 Not listed. BOARD CONSENSUS ADVICE 73 PROPOSED TPA MODIFICATIONS FOR DISPOSITION OF HANFORD SURPLUS REACTORS M-93-00 JULY 11 1997
D197210285 09-Jun-1997 Not listed. FACT SHEET CHANGES PROPOSED TO HANFORD TPA K BASIN SPENT NUCLEAR FUEL PROJECT DISPOSITION OF HANFORD SURPLUS REACTORS
D197210286 09-Jun-1997 Not listed. FACT SHEET CHANGES PROPOSED TO HANFORD TPA NEW MILESTONES FOR K BASIN AND SPENT NUCLEAR FUEL PROJECT AND K BASIN FACILITY TRANSITION ACTIVITIES REACTORS
D197210287 09-Jun-1997 Not listed. FACT SHEET CHANGES PROPOSED TO HANFORD TPA NEGOTIATIONS FOR DISPOSITION OF HANFORD SURPLUS REACTORS
D197220069 05-Jun-1997 Not listed. PROPOSED TPA MODIFICATIONS AND REFERENCE DOCUMENTS FOR 100-K BASINS SPENT NUCLEAR FUEL PROJECT M-34-00A AND DISPOSITION OF HANFORD SURPLUS REACTORS M-93-00
D197045172 31-Dec-1996 Not listed. AGREEMENT IN PRINCIPLE HANFORD TPA NEGOTIATION OF COMMITMENTS FOR COMPLETION OF DISPOSITION OF HANFORD SURPLUS PRODUCTION REACTORS
D197166518 20-Dec-1996 96-EAP-137 TPA NEGOTIATIONS FOR COMPLETION OF DISPOSITION OF HANFORD SURPLUS REACTOR AGREEMENT IN PRINCIPLE
D196007388 11-Jul-1995 018354 COMPLETION OF MILESTONE M-13-00I SUBMIT PLANNING DOCUMENTATION NECESSARY TO COMPLETE REMEDIAL INVESTIGATION PROCESS FOR 100-FR-2 100-KR-2 AND 100-KR-3 DECEMBER 31 1995
D196008526 28-Jun-1995 017200-2 TRANSMITTAL OF RISK EVALUATION OF REMEDIAL ALTERNATIVES FOR HANFORD SITE DOE/RL 93-54 REV 0
D196008527 28-Jun-1995 017200-3 TRANSMITTAL OF RISK EVALUATION OF REMEDIAL ALTERNATIVES FOR HANFORD SITE DOE/RL 93-54 REV 000
D196015388 22-Jun-1995 UNI-2533 HANFORD 100 AREA LONG RANGE DECOMMISSIONING PLAN
D196053833 27-Oct-1994 M-15-94-11 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM CONSOLIDATE 100-KR-2 AND 100-KR-3
D196053957 20-Oct-1994 Not listed. MILESTONE M-15-07B SOIL WASHING PILOT SCALE TEST
D196063334 30-Sep-1994 94-RSD-026 TRANSMITTAL OF 100 AREA SOURCE AND GROUNDWATER OU FOCUSED FEASIBILITY STUDY REPORTS
D196061851 23-Sep-1994 SD-EN-TI-204 000 GROUND PENETRATING RADAR INVESTIGATION CONDUCTED IN 100 AREAS HANFORD SITES FY 1992
D196060693 01-Sep-1994 DOE/RL-94-61 A 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY REPORT
D196034154 24-Aug-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU JUNE 30 1994
D196034156 24-Aug-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU JULY 28 1994
D196065370 01-Aug-1994 BHI-00028 000 100 AREA PILOT SCALE SOIL WASHING TEST ALTERNATIVES AND RECOMMENDATIONS
D196074905 08-Jul-1994 SD-EN-TI-230 000 GEOPHYSICAL SURVEY FOR PROPOSED BOREHOLE 199-K-106A 100-K AREA
D196074911 08-Jul-1994 SD-EN-TI-228 000 GEOPHYSICAL SURVEY FOR PROPOSED BOREHOLE 199-K-108A 100-K AREA
D196074913 08-Jul-1994 SD-EN-TI-278 000 COLUMBIA RIVER EFFLUENT PIPELINE SURVEY
D196063437 10-Jun-1994 94-ERB-140 100 AREA SOIL WASHING BENCH SCALE TESTS ON 116-F-4 PLUTO CRIB SOIL
D196076006 10-Jun-1994 94-ERB-140,9400425 100 AREA SOIL WASHING BENCH SCALE TESTS ON 116-F-4 PLUTO CRIB SOIL SD-EN-TI-268 REV 0
D196076370 10-Jun-1994 SD-EN-TI-268 000 100 AREA SOIL WASHING BENCH SCALE TESTS
D196076376 10-Jun-1994 SD-EN-TI-255 000 SOIL WASHING FIELD TEST PROCEDURE FOR 100-DR-1 OU
D196057614 26-May-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU MAY 26 1994
D196070306 26-May-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU MARCH 31 1994
D196080253 19-May-1994 SD-EN-TI-234 000 100 AREA EXCAVATION TREATABILITY STUDY DATA VALIDATION REPORT
D196081351 13-May-1994 94-ERB-120,9402676,9402979 100-DR-1 OU SOIL WASHING TREATABILITY STUDY MILESTONE SCHEDULE EXTENSION REQUEST
D196058377 12-May-1994 Not listed. DOCUMENT APPROVAL COLUMBIA RIVER IMPACT EVALUATION PLAN REV 001
D196081290 11-May-1994 9402985 100 AREA FEASIBILITY STUDY PHASE I AND II DOE-RL 92-11 REV 000
D196063250 10-May-1994 9406326 TRANSMITTAL OF FINAL COLUMBIA RIVER IMPACT EVALUATION PLAN AND FINAL RESPONSES TO PUBLIC COMMENTS
D196081815 08-May-1994 94-ERB-114,9401790 FINAL RESPONSES TO REGULATOR AND PUBLIC COMMENTS ON DOE-RL 92-28 COLUMBIA RIVER IMPACT EVALUATION PLAN REV 000 AND TRANSMITTAL OF CRIEP REV 001
D196060723 06-May-1994 94-ERB-114 FINAL RESPONSES TO REGULATOR AND PUBLIC COMMENTS ON DOE/RL 92-28 COLUMBIA RIVER IMPACT EVALUATION PLAN REV 0 AND TRANSMITTAL OF DOE/RL 92-28 CRIEP REV 1
D196081266 06-May-1994 94-ERB-113,9401772 SAMPLING AND ANALYSIS OF 100 AREA SPRINGS REV 001 DOE-RL 92-12
D196081245 29-Apr-1994 94-ERB-104,9401798 SUBMITTAL OF 100 AREA FEASIBILITY STUDY PHASE I AND II REV 000 DOE-RL 92-11 FOR APPROVAL
D196084907 12-Apr-1994 SD-EN-TI-239 000 100-K AREA TECHNICAL BASELINE REPORT
D196070307 05-Apr-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU FEBRUARY 23 1994
D196088721 01-Apr-1994 PNL-9437 MONITORING GROUNDWATER AND RIVER INTERACTION ALONG HANFORD REACH OF COLUMBIA RIVER
D196060725 16-Mar-1994 Not listed. REVIEW OF 100 AREA SOIL WASHING BENCH SCALE TESTS
D196084453 01-Mar-1994 DOE/RL-92-28 001 COLUMBIA RIVER IMPACT EVALUATION PLAN
D196070091 23-Feb-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU NOVEMBER 17 1993
D196083078 17-Feb-1994 WHC-EP-0620 RECORD OF REVISION 100 AREAS CERCLA ECOLOGICAL INVESTIGATIONS
D196015404 01-Feb-1994 WHC-EP-0510 001 BALD EAGLE SITE MANAGEMENT PLAN FOR HANFORD SITE SOUTH CENTRAL WASHINGTON
D196089652 01-Feb-1994 DOE/RL-92-11 000 100 AREA FEASIBILITY STUDY PHASE I AND II
D196095243 27-Jan-1994 94-ERB-058,9400686 TRANSMITTAL OF 100 AREA SOIL WASHING BENCH SCALE TESTS DOE/RL 93-107 DRAFT A TO COMPLETE M-15-08C
D196101081 17-Jan-1994 SD-EN-TI-216 000 VEGETATION COMMUNITIES ASSOCIATED WITH 100 AREA AND 200 AREA FACILITIES ON HANFORD SITE
D196101077 01-Jan-1994 DOE/RL-93-107 A 100 AREA SOIL WASHING BENCH SCALE TESTS
D196103158 20-Dec-1993 9400659 DOE RESPONSES TO PUBLIC COMMENTS ON COLUMBIA RIVER IMPACT EVALUATION PLAN REV 000
D196101852 14-Dec-1993 94-ERB-028,9400608 DRAFT RESPONSES TO REGULATOR AND PUBLIC COMMENTS ON DOE/RL 92-28 COLUMBIA RIVER IMPACT EVALUATION PLAN REV 000
D196058317 07-Dec-1993 Not listed. REVIEW OF 100 AREAS CERCLA ECOLOGICAL INVESTIGATIONS WHC-EP-0620
D196083076 02-Dec-1993 9307719 100 AREAS CERCLA ECOLOGICAL INVESTIGATIONS
D196093326 30-Nov-1993 94-ERB-023,9400626 PAGE CHANGES FOR 100 AREA FEASIBILITY STUDY PHASE I AND II DRAFT B DOE/RL 92-11
D196105803 17-Nov-1993 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU SEPTEMBER 29 1993
D196106568 09-Nov-1993 ECN603858,SD-EN-TC-004 ENGINEERING CHANGE NOTICE TO SD-EN-TC-004 REV 0-A 100 AREA EXCAVATION TREATABILITY TEST PROCEDURES
D196093855 05-Nov-1993 DOE/RL-92-11, PAGE CHANGES 100 AREA FEASIBILITY STUDY PHASE I AND II PAGE CHANGES TO DRAFT B
D196106617 26-Oct-1993 9306257 COMPLETION OF M-30-05
D196085330 22-Oct-1993 Not listed. NEZ PERCE DEPARTMENT OF ENVIRONMENTAL RESTORATION AND WASTE MANAGEMENTS RESPONSE TO COLUMBIA RIVER IMPACT EVALUATION PLAN REV 000
D196106615 22-Oct-1993 9306256,94-ERB-006 COMPLETION OF TPA MILESTONE M-30-05
D196106549 21-Oct-1993 9306259,94-ERB-009 SCHEDULE FOR SUBMITTAL OF 100 AREA FEASIBILITY STUDY PHASE I AND II
D196107886 18-Oct-1993 ECN197995,SD-EN-TC-004 0-A ENGINEERING CHANGE NOTICE TO SD-EN-TC-004 REV 0 100 AREA EXCAVATION TREATABILITY TEST PROCEDURES
D196108071 05-Oct-1993 ECN113778,SD-EN-TC-004 ENGINEERING CHANGE NOTICE TO SD-EN-TC-004 REV 0 100 AREA EXCAVATION TREATABILITY TEST PROCEDURES
D196063321 04-Oct-1993 9406349 RESPONSE TO HEART OF AMERICA COMMENT ON 100 AREA TREATABILITY TEST PLAN
D196063276 01-Oct-1993 9406346 100 AREA EXCAVATION TREATABILITY TEST PLAN
D196063277 01-Oct-1993 9406347 100 AREA EXCAVATION TREATABILITY TEST PLAN
D196063278 01-Oct-1993 9406348 100 AREA EXCAVATION TREATABILITY TEST PLAN
D196107628 30-Sep-1993 SD-WM-DP-045 001 222-S ANALYTICAL LABORATORY 100-K AREA BASIN DATA PACKAGE
D196108041 30-Sep-1993 9307708 RESPONSE TO YOUR COMMENTS ON DOCUMENT ENTITLED COLUMBIA RIVER IMPACT EVALUATION PLAN REV 0
D196107358 29-Sep-1993 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU AUGUST 25 1993
D196111730 16-Sep-1993 SD-EN-TI-198 100 AREA COLUMBIA RIVER SEDIMENT SAMPLING
D196108183 10-Sep-1993 9307707 PUBLIC EPA AND ECOLOGY COMMENTS ON COLUMBIA RIVER IMPACT EVALUATION PLAN REV 0 JUNE 1993
D196114513 07-Sep-1993 SD-EN-TC-004 000 100 AREA EXCAVATION TREATABILITY TEST PROCEDURES
D196083727 01-Sep-1993 WHC-EP-0620 100 AREAS CERCLA ECOLOGICAL INVESTIGATIONS