Key Documents
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
No Key Documents Found


Advanced Search Results
Displaying 1-100 of 279 records found of 103,170

Where           Operable Unit     eq     "100-NR-3"
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
0074645H 01-Sep-2016 ECF-HANFORD-15-0040 0 ECF-HANFORD-15-0040 REV 0: ANALYSIS OF WELL DEVELOPMENT DATA IN THE 100 AREAS
0071361H 27-Jun-2016 ECF-HANFORD-10-0429 2 DOCUMENTATION OF PRELIMINARY REMEDIATION GOALS (PRGs) FOR RADIONUCLIDES USING THE IAROD EXPOSURE SCENARIO FOR THE 100 AND 300 AREA REMEDIAL INVESTIGATION / FEASIBILITY STUDY (RI/FS) REPORT
0076173H 19-May-2016 SGW-46279 3 SGW-46279 REV 3: CONCEPTUAL FRAMEWORK AND NUMERICAL IMPLEMENTATION OF 100 AREAS GROUNDWATER FLOW AND TRANSPORT MODEL
00099232 08-Nov-2007 W05265 DATA PACKAGE SUMMARY ANALYTICAL LABORATORY G08-011 I08-005 I08-008 W08-011 100-HR-3 IAM(1/2) NOVEMBER 2007 100-N4-2RB NOVEMBER 2007 200-ZP-1 NOVEMBER 2007 RCRA SAMPLING
D5681308 22-Mar-2004 FP0158 DATA PACKAGE SUMMARY ANALYTICAL LABORATORY I04-022 CERCLA ISRM FEBRUARY 2004 SAMPLING
D195064232 02-Nov-1995 Not listed. COMMENTS ON DESCRIPTION OF WORK AND SAMPLING AND ANALYSIS PLAN FOR PORE WATER SAMPLING AT GROUNDWATER RIVER INTERFACE ADJACENT TO 100-D 100-K AND 100-H REACTOR AREAS DRAFT A
D195064234 25-Oct-1995 022921 COMMENTS ON DESCRIPTION OF WORK AND SAMPLING AND ANALYSIS PLAN FOR PORE WATER SAMPLING AT GROUNDWATER RIVER INTERFACE ADJACENT TO 100-D 100-K AND 100-H REACTOR AREAS BHI-00620 DRAFT A
D197185879 23-Oct-1995 022737 MEETING MINUTES UNIT MANAGERS MEETING REMEDIAL ACTION UNIT SOURCE OU SEPTEMBER 20 1995
D195066606 20-Sep-1995 020361 MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU AUGUST 23 1995
D195066600 23-Aug-1995 020241 MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU 100-BC ERA EXCAVATION SITE JULY 20 1995
D195066672 07-Aug-1995 Not listed. COMMENTS ON 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY
D196006075 07-Aug-1995 018832 COMMENTS ON PROPOSED PLANS FOR HANFORD 100 AREA INTERIM REMEDIAL MEASURES
D196006751 01-Aug-1995 DOE/RL-94-61 000 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY
D196008526 28-Jun-1995 017200-2 TRANSMITTAL OF RISK EVALUATION OF REMEDIAL ALTERNATIVES FOR HANFORD SITE DOE/RL 93-54 REV 0
D196008527 28-Jun-1995 017200-3 TRANSMITTAL OF RISK EVALUATION OF REMEDIAL ALTERNATIVES FOR HANFORD SITE DOE/RL 93-54 REV 000
D196015388 22-Jun-1995 UNI-2533 HANFORD 100 AREA LONG RANGE DECOMMISSIONING PLAN
D196015048 15-Jun-1995 Not listed. 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY REPORT COMMENTS
D196015096 12-Jun-1995 Not listed. PROPOSED GUIDELINES FOR ESTABLISHMENT OF ACTION LEVELS FOR CLEANUP OF RADIOACTIVE CONTAMINATED SOILS
D196015921 01-Jun-1995 DOE/RL-94-61 000 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY [SECTION 1 OF 2]
D196016522 01-Jun-1995 DOE/RL-94-61 000 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY [SECTION 2 OF 2]
D196016613 01-Jun-1995 Not listed. CURRENT TRI-PARTY PLANNING FOR 100 AREA CLEANUP HANFORD ADVISORY BOARD CONSENSUS ADVICE 23 RESPONSE
D196021462 18-May-1995 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU APRIL 20 1995
D196022886 01-May-1995 DOE/RL-94-61 000 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY [SECTION 1 OF 2]
D196023318 01-May-1995 DOE/RL-94-61 000 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY [SECTION 2 OF 2]
D196024318 21-Apr-1995 M-15-95-02B FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM 100 AREA SOURCE OU PROPOSED MILESTONE CHANGES
D196024317 20-Apr-1995 Not listed. TPA CHANGE CONTROL FORM M-15-95-02B 100 AREA SOURCE OU PROPOSED MILESTONE CHANGES
D196024587 20-Apr-1995 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU MARCH 16 1995
D196024281 18-Apr-1995 014073 100 AREA CHROMIUM CONCENTRATION
D196024258 14-Apr-1995 014008 TPA CHANGE CONTROL FORM M-15-95-02B 100 AREA SOURCE OU MILESTONE CHANGES
D196015095 11-Apr-1995 ERS-95-419 ESTABLISHMENT OF ACTION LEVELS FOR 100 AREA INTERIM RECORDS OF DECISION
D196023940 23-Mar-1995 012785 TRANSMITTAL OF 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY REPORT DOE/RL 94-61 DRAFT B
D196029355 16-Mar-1995 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU FEBRUARY 16 1995
D196029357 16-Mar-1995 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU OCTOBER 20 1994
D196031034 16-Mar-1995 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU SEPTEMBER 28 1994
D196025276 01-Mar-1995 DOE/RL-94-61 B 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY REPORT PROCESS DOCUMENT [SECTION 1 OF 2]
D196025289 01-Mar-1995 DOE/RL-94-61 B 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY REPORT PROCESS DOCUMENT [SECTION 2 OF 2]
D196033909 16-Feb-1995 010097 100 AND 200 AREA PUMP AND TREAT SYSTEMS SHUTDOWN
D196034157 16-Feb-1995 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU JANUARY 19 1995
D196033897 09-Feb-1995 009916 RESPONSE TO ECOLOGY COMMENTS ON PRELIMINARY DETERMINATION OF CHROMIUM CONCENTRATION WITHIN PORE WATER PERIPHYTON AND CHINOOK SALMON EGGS AT HANFORD REACH SPAWNING AREA IN PROXIMITY TO 100-HR-3 OU BHI-00156 REV 0-A NOVEMBER 1994
D196034212 01-Feb-1995 BHI-00156 000 PRELIMINARY DETERMINATION OF CHROMIUM CONCENTRATION WITHIN PORE WATER AND EMBRYONIC CHINOOK SALMON AT HANFORD REACH SPAWNING AREA IN PROXIMITY TO 100-HR-3 OU
D196036768 30-Jan-1995 009048 COMPLETION OF 100-D ISLAND PORTION OF TPA MILESTONE M-16-80 AND 100-N PORTION OF COLUMBIA RIVER
D196033966 24-Jan-1995 008901 EPA EXPEDITED REVIEW COMMENTS ON PRELIMINARY DETERMINATION OF CHROMIUM CONCENTRATION WITHIN PORE WATER PERIPHYTON AND CHINOOK SALMON EGGS AT HANFORD REACH SPAWNING AREA IN PROXIMITY TO 100-HR-3 OU BHI-00156 REV 0-A NOVEMBER 1994
D196042157 12-Jan-1995 Not listed. 100 AND 200 AREA PUMP AND TREAT SYSTEMS SHUTDOWN
D196033971 10-Jan-1995 Not listed. COMMENTS ON PRELIMINARY DETERMINATION OF CHROMIUM CONCENTRATION WITHIN PORE WATER PERIPHYTON AND CHINOOK SALMON EGGS AT HANFORD REACH SPAWNING AREA IN PROXIMITY TO 100-HR-3 OU BHI-00156 REV 0-A NOVEMBER 1994
D196015410 05-Jan-1995 008106 TRANSMITTAL OF HANFORD SITE BACKGROUND: EVALUATION OF EXISTING SOIL RADIONUCLIDE DATA
D196046482 14-Dec-1994 Not listed. COMPLETION OF 100-D ISLAND PORTION OF MILESTONE M-16-80 AND 100-N PORTION OF COLUMBIA RIVER
D196037543 13-Dec-1994 007360 COMMENTS ON DRAFT NORTH SLOPE REVEGETATION PLAN
D196033973 12-Dec-1994 Not listed. COMMENTS ON PRELIMINARY DETERMINATION OF CHROMIUM CONCENTRATION WITHIN PORE WATER PERIPHYTON AND CHINOOK SALMON EGGS AT HANFORD REACH SPAWNING AREA IN PROXIMITY TO 100-HR-3 OU BHI-00156 REV 0-A NOVEMBER 1994
D196033942 01-Dec-1994 DOE/RL-94-150 000 BALD EAGLE SITE MANAGEMENT PLAN FOR HANFORD SITE SOUTH CENTRAL WASHINGTON
D196048920 30-Nov-1994 Not listed. EXPECTATIONS FOR 100 AREA FOCUSED FEASIBILITY STUDY AND PROPOSED PLANS
D196054519 01-Nov-1994 BHI-00137 000 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY COST MODELS
D196053952 31-Oct-1994 Not listed. 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY REPORT REVIEW
D196053957 20-Oct-1994 Not listed. MILESTONE M-15-07B SOIL WASHING PILOT SCALE TEST
D196063334 30-Sep-1994 94-RSD-026 TRANSMITTAL OF 100 AREA SOURCE AND GROUNDWATER OU FOCUSED FEASIBILITY STUDY REPORTS
D196061851 23-Sep-1994 SD-EN-TI-204 000 GROUND PENETRATING RADAR INVESTIGATION CONDUCTED IN 100 AREAS HANFORD SITES FY 1992
D196060693 01-Sep-1994 DOE/RL-94-61 A 100 AREA SOURCE OU FOCUSED FEASIBILITY STUDY REPORT
D196034154 24-Aug-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU JUNE 30 1994
D196034156 24-Aug-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU JULY 28 1994
D196065370 01-Aug-1994 BHI-00028 000 100 AREA PILOT SCALE SOIL WASHING TEST ALTERNATIVES AND RECOMMENDATIONS
D196074913 08-Jul-1994 SD-EN-TI-278 000 COLUMBIA RIVER EFFLUENT PIPELINE SURVEY
D196063437 10-Jun-1994 94-ERB-140 100 AREA SOIL WASHING BENCH SCALE TESTS ON 116-F-4 PLUTO CRIB SOIL
D196076006 10-Jun-1994 94-ERB-140,9400425 100 AREA SOIL WASHING BENCH SCALE TESTS ON 116-F-4 PLUTO CRIB SOIL SD-EN-TI-268 REV 0
D196076370 10-Jun-1994 SD-EN-TI-268 000 100 AREA SOIL WASHING BENCH SCALE TESTS
D196076376 10-Jun-1994 SD-EN-TI-255 000 SOIL WASHING FIELD TEST PROCEDURE FOR 100-DR-1 OU
D196057614 26-May-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU MAY 26 1994
D196070306 26-May-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU MARCH 31 1994
D196080253 19-May-1994 SD-EN-TI-234 000 100 AREA EXCAVATION TREATABILITY STUDY DATA VALIDATION REPORT
D196081351 13-May-1994 94-ERB-120,9402676,9402979 100-DR-1 OU SOIL WASHING TREATABILITY STUDY MILESTONE SCHEDULE EXTENSION REQUEST
D196058377 12-May-1994 Not listed. DOCUMENT APPROVAL COLUMBIA RIVER IMPACT EVALUATION PLAN REV 001
D196081290 11-May-1994 9402985 100 AREA FEASIBILITY STUDY PHASE I AND II DOE-RL 92-11 REV 000
D196063250 10-May-1994 9406326 TRANSMITTAL OF FINAL COLUMBIA RIVER IMPACT EVALUATION PLAN AND FINAL RESPONSES TO PUBLIC COMMENTS
D196081815 08-May-1994 94-ERB-114,9401790 FINAL RESPONSES TO REGULATOR AND PUBLIC COMMENTS ON DOE-RL 92-28 COLUMBIA RIVER IMPACT EVALUATION PLAN REV 000 AND TRANSMITTAL OF CRIEP REV 001
D196060723 06-May-1994 94-ERB-114 FINAL RESPONSES TO REGULATOR AND PUBLIC COMMENTS ON DOE/RL 92-28 COLUMBIA RIVER IMPACT EVALUATION PLAN REV 0 AND TRANSMITTAL OF DOE/RL 92-28 CRIEP REV 1
D196081266 06-May-1994 94-ERB-113,9401772 SAMPLING AND ANALYSIS OF 100 AREA SPRINGS REV 001 DOE-RL 92-12
D196081245 29-Apr-1994 94-ERB-104,9401798 SUBMITTAL OF 100 AREA FEASIBILITY STUDY PHASE I AND II REV 000 DOE-RL 92-11 FOR APPROVAL
D196070307 05-Apr-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU FEBRUARY 23 1994
D196088721 01-Apr-1994 PNL-9437 MONITORING GROUNDWATER AND RIVER INTERACTION ALONG HANFORD REACH OF COLUMBIA RIVER
D196060725 16-Mar-1994 Not listed. REVIEW OF 100 AREA SOIL WASHING BENCH SCALE TESTS
D196084453 01-Mar-1994 DOE/RL-92-28 001 COLUMBIA RIVER IMPACT EVALUATION PLAN
D196070091 23-Feb-1994 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU NOVEMBER 17 1993
D196083078 17-Feb-1994 WHC-EP-0620 RECORD OF REVISION 100 AREAS CERCLA ECOLOGICAL INVESTIGATIONS
D196015404 01-Feb-1994 WHC-EP-0510 001 BALD EAGLE SITE MANAGEMENT PLAN FOR HANFORD SITE SOUTH CENTRAL WASHINGTON
D196089652 01-Feb-1994 DOE/RL-92-11 000 100 AREA FEASIBILITY STUDY PHASE I AND II
D196095243 27-Jan-1994 94-ERB-058,9400686 TRANSMITTAL OF 100 AREA SOIL WASHING BENCH SCALE TESTS DOE/RL 93-107 DRAFT A TO COMPLETE M-15-08C
D196101081 17-Jan-1994 SD-EN-TI-216 000 VEGETATION COMMUNITIES ASSOCIATED WITH 100 AREA AND 200 AREA FACILITIES ON HANFORD SITE
D196101077 01-Jan-1994 DOE/RL-93-107 A 100 AREA SOIL WASHING BENCH SCALE TESTS
D196103158 20-Dec-1993 9400659 DOE RESPONSES TO PUBLIC COMMENTS ON COLUMBIA RIVER IMPACT EVALUATION PLAN REV 000
D196101852 14-Dec-1993 94-ERB-028,9400608 DRAFT RESPONSES TO REGULATOR AND PUBLIC COMMENTS ON DOE/RL 92-28 COLUMBIA RIVER IMPACT EVALUATION PLAN REV 000
D196058317 07-Dec-1993 Not listed. REVIEW OF 100 AREAS CERCLA ECOLOGICAL INVESTIGATIONS WHC-EP-0620
D196083076 02-Dec-1993 9307719 100 AREAS CERCLA ECOLOGICAL INVESTIGATIONS
D196093326 30-Nov-1993 94-ERB-023,9400626 PAGE CHANGES FOR 100 AREA FEASIBILITY STUDY PHASE I AND II DRAFT B DOE/RL 92-11
D196105803 17-Nov-1993 Not listed. MEETING MINUTES UNIT MANAGERS MEETING 100 AGGREGATE AREA 100 AREA OU SEPTEMBER 29 1993
D196106568 09-Nov-1993 ECN603858,SD-EN-TC-004 ENGINEERING CHANGE NOTICE TO SD-EN-TC-004 REV 0-A 100 AREA EXCAVATION TREATABILITY TEST PROCEDURES
D196093855 05-Nov-1993 DOE/RL-92-11, PAGE CHANGES 100 AREA FEASIBILITY STUDY PHASE I AND II PAGE CHANGES TO DRAFT B
D196106617 26-Oct-1993 9306257 COMPLETION OF M-30-05
D196085330 22-Oct-1993 Not listed. NEZ PERCE DEPARTMENT OF ENVIRONMENTAL RESTORATION AND WASTE MANAGEMENTS RESPONSE TO COLUMBIA RIVER IMPACT EVALUATION PLAN REV 000
D196106615 22-Oct-1993 9306256,94-ERB-006 COMPLETION OF TPA MILESTONE M-30-05
D196106549 21-Oct-1993 9306259,94-ERB-009 SCHEDULE FOR SUBMITTAL OF 100 AREA FEASIBILITY STUDY PHASE I AND II
D196107886 18-Oct-1993 ECN197995,SD-EN-TC-004 0-A ENGINEERING CHANGE NOTICE TO SD-EN-TC-004 REV 0 100 AREA EXCAVATION TREATABILITY TEST PROCEDURES
D196108071 05-Oct-1993 ECN113778,SD-EN-TC-004 ENGINEERING CHANGE NOTICE TO SD-EN-TC-004 REV 0 100 AREA EXCAVATION TREATABILITY TEST PROCEDURES