Advanced Search Results
Displaying 1-100 of 157 records found of 103,427

Where           Treatment Storage Disposal Unit     eq     "D-2-10 216-A-37-1 CRIB"
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
AR-02370 22-May-2019 ECF-200E-18-0085 0 Water Level Mapping and Hydraulic gradient Calculations for 200 East Area RCRA Sites, 2018
AR-02371 22-May-2019 ECF-HANFORD-18-0079 0 Calculation of Critical Means for Calendar Year 2019 RCRA Groundwater Monitoring
AR-01189 22-Apr-2019 19-ESQ-0070 N/A Calculation Methods for Groundwater Monitoring Indicator Parameter Critical Means
AR-02381 06-Mar-2019 ECF-HANFORD-18-0049 0 Hydraulic Gradients and Velocity Calculations for RCRA Sites in 2018
AR-00051 22-Feb-2019 19-NWP-018 N/A Additional Requested Actions on Department of Ecology (Ecology) Dangerous Waste Compliance Inspections on June 27, 2018, at 216-B-3 Main Pond, 216-S-10 Pond and Ditch, 216-A-29 Ditch, 216-B-63 Trench, 216-A-36B Crib, and 216-A-37-1 Crib, RCRA Site ID: WA7890008967, NWP Compliance Index No 18.638 through 18.643
AR-01118 21-Feb-2019 DOE/RL-2018-65 0 Hanford Site RCRA Groundwater Monitoring Report for 2018
0063867H 05-Feb-2019 19-AMRP-0054 Submittal of Supplemental Information to the Hanford Facility Resource Conservation and Recovery Act (RCRA) Permit Renewal (Revision 9) Application for the 216-A-36B Crib Waste Management Unit, Closure Unit Group 12, and 216-A-37-1 Crib Waste Management Unit, Closure Unit Group 13, Addendum H, Closure Plans
0063813H 20-Dec-2018 Not listed. River Corridor/Central Plateau Quarterly Tri-Party Agreement Milestone Review Meeting Minutes December 20, 2018
0064076H 18-Dec-2018 ECF-200E-18-0066 0 GROUNDWATER FLOW AND MIGRATION CALCULATIONS TO ASSESS MONITORING NETWORKS IN THE 200 EAST AREA DANGEROUS WASTE MANAGEMENT UNITS
AR-00003 13-Dec-2018 18-NWP-201 N/A Dangerous Waste Compliance Inspection on June 27, 2018 at the 216-B-3 Main Pond, 216-S-10 Pond and Ditch, 216-A-29 Ditch, 216-B-63 Trench, 216-A-36B Crib, and 216-A-37-1 Crib, RCRA Site ID: WA7890008967, NWP Compliance Index No's 18.638 to 18.643
0064147H 27-Nov-2018 19-ESQ-0016 TRANSMITTAL OF THE UPDATED CENTRAL PLATEAU RISK MANAGEMENT DANGEROUS WASTE TRAINING PLAN
0064146H 01-Nov-2018 PRC-STD-TQ-40236 CENTRAL PLATEAU RISK MANAGEMENT DANGEROUS WASTE TRAINING PLAN
0064792H 19-Jul-2018 Not listed. RIVER CORRIDOR/CENTRAL PLATEAU QUARTERLY TRI-PARTY AGREEMENT MILESTONE REVIEW MEETING MINUTES JULY 19 2018
0065278H 25-Jun-2018 18-ESQ-0071 TRANSMITTAL OF UPDATED DANGEROUS WASTE TRAINING PLANS
AR-01326 05-Apr-2018 DN0308 1 SAF: W18-001 RCRA, January 2018
AR-01342 30-Mar-2018 SC2654 1 SAF: W18- 001 RCRA, January 2018
0065842H 27-Mar-2018 18-AMRP-0068 REISSUE REISSUE - REQUEST FOR WAIVER OF SECURITY ADDENDA REQUIREMENTS FOR THE 216-A-29 DITCH, 216-A-36B CRIB, 216-A-37-1 CRIB, 216-B-3 MAIN POND, 216-B-63 TRENCH AND 216-S-10 POND AND DITCH
0066061H 27-Mar-2018 18-AMRP-0068 REQUEST FOR WAIVER OF SECURITY ADDENDA REQUIREMENTS FOR THE 216-A-29 DITCH, 216-A-36B CRIB 216-A-37-1 CRIB 216-B-3 MAIN-POND 216-B-63 TRENCH AND 216-S-10 POND AND DITCH
0066390H 15-Feb-2018 ECF-HANFORD-17-0241 0 HYDRAULIC GRADIENT AND VELOCITY CALCULATIONS FOR RCRA SITES IN 2017
0066776H 17-Jan-2018 18-AMRP-0034 INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE 216-A-37-1 PUREX PLANT CRIB, DOE/RL-2010-92, REVISION 3
AR-01082 19-Oct-2017 SGW-61096 0 Borehole Summary Report for the Installation of Five M-24 Monitoring Wells at the 200-PO-1 and 200-BP-5 Operable Unit, FY 2017
0066775H 27-Sep-2017 DOE/RL-2010-92 3 INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE 216-A-37-1 PUREX PLANT CRIB
0069089H 09-Aug-2017 H-2-62876 3 PLAN AND PROFILE DRAWING
0069088H 07-Aug-2017 H-2-62877 3 PLANS AND DETAILS DRAWING
0069680H 13-Jun-2017 17-AMRP-0183 INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE 216-A-37-1 PUREX PLANT CRIB DOE/RL-2010-92 REVISION 2
0064086H 17-May-2017 ECF-200E-17-0003 1 EVALUATE 216-A-37-1 DANGEROUS WASTE DESIGNATION
0071317H 16-May-2017 17-AMRP-0149 INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE 216-A-37-1 PUREX PLANT CRIB, DOE/RL-2010-92, REVISION 2
0069780H 09-May-2017 ECF-HANFORD-17-0009 0 CALCULATION OF CRITICAL MEANS FOR CALENDAR YEAR 2017 RCRA GROUNDWATER MONITORING
0071316H 12-Apr-2017 DOE/RL-2010-92 2 INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE 216-A-37-1 PUREX PLANT CRIB
0071845H 08-Feb-2017 ECF-HANFORD-16-0139 0 HYDRAULIC GRADIENTS AND VELOCITY CALCULATIONS FOR RCRA SITES IN 2016
0073843H 16-Nov-2016 16-NWP-197 DANGEROUS WASTE COMPLIANCE INSPECTION ON JUNE 7 8 AND JUNE 9 2016 AT UNITED STATES DEPARTMENT OF ENERGY HANFORD SITE RCRA SITE IS: WA7890008967 NWP COMPLIANCE INDEX NOS. 16.562 THROUGH 16.574
0075636H 28-Jul-2016 16-NWP-129 16-NWP-129: GROUNDWATER ENGINEERING REPORT AND FINAL STATUS GROUNDWATER MONITORING PLAN REQUIREMENTS FOR 216-A-37-1 CRIB 216-A-36B CRIB 216-B-63 TRENCH 216-B-3 POND 216-A-29 DITCH AND 216-S-10 POND AND DITCH DANGEROUS WASTE MANAGEMENT UNITS
0077204H 12-Feb-2016 Not listed. PUBLIC COMMENTS FOR THE TENTATIVE AGREEMENT ON HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER REVISIONS FOR CENTRAL PLATEAU CLEANUP [SECTION 3 OF 3]
0077205H 12-Feb-2016 Not listed. PUBLIC COMMENTS FOR THE TENTATIVE AGREEMENT ON HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER REVISIONS FOR CENTRAL PLATEAU CLEANUP [SECTION 2 OF 3]
0077206H 12-Feb-2016 Not listed. PUBLIC COMMENTS FOR THE TENTATIVE AGREEMENT ON HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER REVISIONS FOR CENTRAL PLATEAU CLEANUP [SECTION 1 OF 3]
0079234H 19-Nov-2015 CHPRC-1505094 PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS NOVEMBER 19 2015
0079514H 18-Nov-2015 CHPRC-1503264 CHPRC-1503264 MEETING MINUTES: PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS SEPTEMBER 17 2015
0079698H 17-Sep-2015 DOE/RL-2010-92 2 DOE/RL-2010-92 DRAFT REV 2: INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE 216-A-37-1 PUREX PLANT CRIB
0071641H 14-Oct-2014 CHPRC-00189 12 CH2M HILL PLATEAU REMEDIATION COMPANY ENVIRONMENTAL QUALITY ASSURANCE PROGRAM PLAN
1410160174 10-Oct-2014 14-NWP-222 LETTER 14-NWP-222: HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER HFFACO EXTENSION OF REVIEW PERIOD MILESTONE M-037-02 SUBMIT REVISED CLOSURE PLANS TO SUPPORT TSD CLOSURE FOR FIVE 5 TSD UNITS 207 A SOUTH RETENTION BASIN 216 A 36N CRIB 216 A 37 1 CRIB AND 216 B 63 TRENCH
1401301038 23-Jan-2014 CHPRC-1400012 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS JANUARY 23 2014
1401080053 21-Nov-2013 CHPRC-1304269 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS NOVEMBER 21 2013
0071846H 02-Oct-2013 ECF-HANFORD-12-0061 0 GROUNDWATER HYDRAULIC GRADIENT AND VELOCITY CALCULATIONS FOR 200 EAST AREA RCRA SITES IN 2011
1308220018 15-Aug-2013 CHPRC-1303098 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS AUGUST 15 2013
1306040210 16-May-2013 CHPRC-1301897 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS MAY 16 2013
1305170323 21-Feb-2013 CHPRC-1300294 ATTACHMENT 4 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS FEBRUARY 21 2013
1305170322 15-Nov-2012 CHPRC-1204180 ATTACHMENT 4 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS NOVEMBER 15 2012
1209270371 20-Sep-2012 CHPRC-1203468 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS SEPTEMBER 20 2012
1208221107 16-Aug-2012 CHPRC-1202650 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS AUGUST 16 2012
1206250551 18-Jun-2012 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING IAMIT MAY 17 2012
1205170984 17-May-2012 Not listed. MEETING MINUTES IAMIT APRIL 19 2012
1206010550 17-May-2012 CHPRC-1201659 MEETING MINUTES PROJECT MANAGERS 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS MAY 17 2012
1204240714 19-Apr-2012 CHPRC-1201277 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS APRIL 19 2012
1203260897 15-Mar-2012 CHPRC-1200727 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS MARCH 15 2012
1106170793 01-Nov-2011 DOE/RL-2010-92 0 DOE/RL-2010-92 REV 0: INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE 216-A-37-1 PUREX PLANT CRIB
1110261180 20-Oct-2011 CHPRC-1104158 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS SEPTEMBER 12 2011
1110261181 20-Oct-2011 CHPRC-1104890 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS OCTOBER 20 2011
1109213029 15-Sep-2011 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING IAMIT AUGUST 18 2011
1109011791 24-Aug-2011 11-AMCP-0207 INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE 216-A-37-1 PUREX PLANT CRIB DOE/RL-2010-92 REVISION 1
1108241349 18-Aug-2011 Not listed. MEETING MINUTES RIVER CORRIDOR CENTRAL PLATEAU TRI PARTY AGREEMENT MILESTONE REVIEW JULY 21 2011
1108261292 18-Aug-2011 CHPRC-1103939 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNIT AUGUST 18 2011
1108261293 18-Aug-2011 Not listed. MEETING MINUTES IAMIT JULY 21 2011
1108181090 21-Jul-2011 CHPRC-1102649,SGW-49168 0 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS JULY 21 2011
1106220320 22-Jun-2011 Not listed. MEETING MINUTES IAMIT MAY 19 2011
1106271470 21-Jun-2011 DOE/RL-2010-92 1 DOE/RL-2010-92 REV 1: INTERIM STATUS GROUNDWATER MONITORING PLAN FOR THE 216-A-37-1 PUREX PLANT CRIB
1106011342 19-May-2011 CHPRC-1102161 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS MAY 19 2011
1104220935 14-Apr-2011 TRAC-1393 0 RCRA QUARTERLY GROUNDWATER MONITORING MEETING FOR JULY THRU SEPTEMBER 2010
1103310210 17-Mar-2011 CHPRC-1101200 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS
1103070702 17-Feb-2011 CHPRC-1100641 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS FEBRUARY 17 2011
1104220936 10-Feb-2011 CHPRC-1102-03,SGW-48904-VA 0 RESOURCE CONSERVATION AND RECOVERY ACT GROUNDWATER MONITORING SUMMARY JULY THROUGH SEPTEMBER 2010
1102081315 03-Feb-2011 Not listed. REQUEST FOR COPIES OF APPROVED STATE ENVIRONMENTAL POLICY ACT SEPA ENVIRONMENTAL CHECKLISTS BIOLOGICAL REVIEWS AND CULTURAL RESOURCES REVIEWS FOR SPECIFIC DANGEROUS WASTE MANAGEMENT UNITS
1101260922 20-Jan-2011 CHPRC-1003716,TPA-CN-390 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS NOVEMBER 18 2010
1101260923 20-Jan-2011 CHPRC-1100020 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS JANUARY 20 2011
1102150104 10-Dec-2010 TRAC-1373 RCRA GROUNDWATER SAMPLE COLLECTION RECOVERY PLAN
1102150105 09-Dec-2010 TRAC-1372 RCRA GROUNDWATER SAMPLE RECOVERY AFTER SAMPLING STOP WORK DIRECTIVE SECOND MEETING
1012140653 08-Dec-2010 Not listed. RCRA QUARTERLY GROUNDWATER MONITORING MEETING FOR APRIL-JUNE 2010
1102150106 07-Dec-2010 TRAC-1371 RCRA GROUNDWATER SAMPLE RECOVERY AFTER SAMPLING STOP WORK DIRECTIVE
1012140654 30-Nov-2010 SGW-48415-VA 0 RESOURCE CONSERVATION AND RECOVERY ACT GROUNDWATER MONITORING SUMMARY APRIL-JUNE 2010
1011021006 26-Oct-2010 M-37-10-01 ADD TRI PARTY AGREEMENT TREATMENT STORAGE DISPOSAL TSD UNIT CLOSURE INTERIM MILESTONES
1010270162 21-Oct-2010 CHPRC-1003553 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNIT OCTOBER 21 2010
1009270921 16-Sep-2010 CHPRC-1002580 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS SEPTEMBER 16 2010
1009270912 26-Aug-2010 SGW-47540-VA 0 RESOURCE CONSERVATION AND RECOVERY ACT GROUNDWATER MONITORING SUMMARY JANUARY THROUGH MARCH 2010
1008250904 19-Aug-2010 CHPRC-1000558 MEETING MINUTES PROJECT MANGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS AUGUST 19 2010
1007210243 15-Jul-2010 CHPRC-1000536 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER AND SOURCE OPERABLE UNITS JULY 15 2010
1006280698 17-Jun-2010 CHPRC-1000410 MEETING MINUTES PROJECT MANAGERS MEETING 200 AREA GROUNDWATER SOURCE OPERABLE UNITS MAY 20 2010
DA05238192 21-Jun-2007 Not listed. SUBMITTAL OF NEW CERTIFIED PART A APPLICATION FORMS TO TREATMENT STORAGE AND DISPOSAL TSD UNITS
DA02472169 04-May-2006 06-AMCP-0188 TRANSMITTAL OF DRAFT A VERSION OF 216-A-10 CRIB 216-A-36B CRIB 216-A-37-1 CRIB 207-A SOUTH RETENTION BASIN CLOSURE POSTCLOSURE PLANS
DA02472177 04-May-2006 06-AMCP-0189 TRANSMITTAL OF DRAFT A VERSION OF 216-A-10 CRIB 216-A-36B CRIB 216-A-37-1 CRIB 207-A SOUTH RETENTION BASIN CLOSURE POSTCLOSURE PLANS
DA02472183 04-May-2006 06-AMCP-0190 TRANSMITTAL OF DRAFT A VERSION OF 216-A-10 CRIB 216-A-36B CRIB 216-A-37-1 CRIB 207-A SOUTH RETENTION BASIN CLOSURE POSTCLOSURE PLANS
DA02472191 04-May-2006 06-AMCP-0191 TRANSMITTAL OF DRAFT A VERSION OF 216-A-10 CRIB 216-A-36B CRIB 216-A-37-1 CRIB 207-A SOUTH RETENTION BASIN CLOSURE POSTCLOSURE PLANS
DA02472194 04-May-2006 06-AMCP-0192 TRANSMITTAL OF DRAFT A VERSION OF 216-A-10 CRIB 216-A-36B CRIB 216-A-37-1 CRIB 207-A SOUTH RETENTION BASIN CLOSURE POSTCLOSURE PLANS
DA02466026 26-Apr-2006 06-AMCP-0187 COMPLETION OF TPA INTERIM MILESTONE M-020-33 AND REQUEST FOR APPROVAL OF 216-A-10 CRIB 216-A-36B CRIB 216-A-37-1 CRIB 207-A SOUTH RETENTION BASIN CLOSURE POSTCLOSURE PLANS
DA02466219 26-Apr-2006 Not listed. 000 STATE ENVIRONMENTAL POLICY ACT SEPA ENVIRONMENTAL CHECKLIST FOR HANFORD FACILITY 216-A-37-1 CRIB CLOSURE
DA02466166 14-Apr-2006 DOE/RL-2005-88 A CLOSURE PLAN FOR 216-A-37-1 CRIB
DA573044 25-Jul-2005 05-AMCP-0356 TPA CHANGE PACKAGES M-15-05-02 PAUSE M-015 INTERIM MILESTONES AND M-20-05-01 PAUSE AGREEMENT INTERIM MILESTONES M-020-39 M-020-33
D6054220 10-Sep-2004 Not listed. APPROVAL OF URANIUM RICH GENERAL PROCESS CONDENSATE AND PROCESS WASTE GROUP OU REMEDIAL INVESTIGATION FEASIBILITY STUDY WORK PLAN AND RCRA TSD UNIT SAMPLING PLAN DOE/RL-2000-60 REV 001
D3448183 27-Aug-2003 WSCF20031183 DATA PACKAGE SUMMARY ANALYTICAL LABORATORY 200-PW-2 200-PW-4 OU BOREHOLE SOIL SAMPLING REANALYSIS
D2331823 26-Jun-2003 H2203 DATA PACKAGE SUMMARY ANALYTICAL LABORATORY 200-PW-2 200-PW-4 OU BOREHOLE SOIL SAMPLING
D2337871 26-Jun-2003 H2209 DATA PACKAGE SUMMARY ANALYTICAL LABORATORY 200-PW-2 200-PW-4 OU BOREHOLE SOIL SAMPLING
D2340980 14-May-2003 H2208 DATA PACKAGE SUMMARY ANALYTICAL LABORATORY 200-PW-2 200-PW-4 OU BOREHOLE SOIL SAMPLING