The Administrative Record website will be upgraded on June 27, 2019. VisitĀ www.hanford.govĀ for more information.
  
Advanced Search Results
Displaying 1-14 of 14 records found of 103,493

Where           Treatment Storage Disposal Unit     eq     "T-1-2 1324-N/1324-NA LIQUID WASTE FACILITIES"
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
AR-01118 21-Feb-2019 DOE/RL-2018-65 0 Hanford Site RCRA Groundwater Monitoring Report for 2018
AR-01129 06-Feb-2019 19-SSD-0025,DOE/RL-2001-41 9 Sitewide Institutional Controls Plan for Hanford CERCLA Response Actions and RCRA Corrective Actions
0065267H 29-Jun-2018 18-ESQ-0079 CLASS 1 MODIFICATIONS TO THE HANFORD FACILITY RESOURCE CONSERVATION AND RECOVERY ACT PERMIT, QUARTER ENDING JUNE 30, 2018
AR-01226 28-Jun-2018 18-NWP-112 N/A Transmittal of the Part A Forms for the 1324-N Surface Impoundment and the 1324-NA Percolation Pond to the Hanford Facility Resource Conservation and Recovery Act Permit, Dangerous Waste Portion, Revision 8C, for the Treatment, Storage, and Disposal of Dangerous Waste (Site-wide Permit), Part V, Closure Unit Group 3 (CUG-3), WA 7890008967
0065357H 13-Jun-2018 18-AMRP-0115 REVISED PART A FORMS FOR THE 1324-N SURFACE IMPOUNDMENT AND THE 1324-NA PERCOLATION POND
AR-01344 28-Apr-2018 SL2816 0 SAF: W18-001 RCRA, January; S18-003 CERCLA, March 2018; X18-005 Groundwater Background Study, FY2018; W18-002 RCRA, February 2018
0065645H 26-Apr-2018 18-AMRP-0096,REG-0907 0 REVISED PART A FORMS FOR THE 1324-N SURFACE IMPOUNDMENT AND THE 1324-NA PERCOLATION POND
AR-01352 09-Apr-2018 DN0330 0 SAF: W18-003 RCRA, March 2018; W18-002 RCRA, February 2018; W18-001 RCRA, January 2018
AR-01343 06-Apr-2018 SL2815 0 SAF: W18-001 RCRA, January 2018; W18-003 RCRA, March 2018
AR-01348 06-Apr-2018 W08026 0 SAF: I18-005 GW-IA Monitoring, February 2018; S18-002 Sitewide Survey, February 2018; I18-006 AEA, March 2018; I18-007 ERDF, March 2018; S18-003 CERCLA March 2018; W18-003 RCRA, March 2018
0066390H 15-Feb-2018 ECF-HANFORD-17-0241 0 HYDRAULIC GRADIENT AND VELOCITY CALCULATIONS FOR RCRA SITES IN 2017
D1589073 01-Jan-2003 Not listed. EXPLANATION OF SIGNIFICANT DIFFERENCE FOR 100-NR-1 OU TREATMENT STORAGE AND DISPOSAL INTERIM ACTION RECORD OF DECISION AND 100-NR-1 100-NR-2 OU INTERIM ACTION ROD
D8818688 08-Jan-2001 M-24-00-03 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM MODIFY RCRA WELL INSTALLATION INTERIM MILESTONES M-24-46 M-24-48 M-24-49 AND M-24-50
D196093317 18-Dec-1991 M-24-91-2 1324N 1324NA MONITORING WELL LOCATION CHANGES