Advanced Search Results
Displaying 1-57 of 57 records found of 103,170

Where           Treatment Storage Disposal Unit     eq     "T-2-3 204-AR Waste Unloading Station"
Document
Details
Date of
Document
Document
Number
Revision Document Title/Description
[ Click to retrieve document. ]
0069915H 01-Jun-2017 17-NWP-065 DEPARTMENT OF ECOLOGY (ECOLOGY) REVIEW OF RESPONSE TO DANGEROUS WASTE COMPLIANCE INSPECTION ON MARCH 8, 2016, AT THE DOUBLE-SHELL TANK SYSTEM AND 204-AR WASTE UNLOADING STATION, RCRA SITE ID: WA7890008967, NWP COMPLIANCE INDEX NO. 16.554
0073837H 27-Sep-2016 RPP-ENV-59682 0 204-AR WASTE UNLOADING STATION DANGEROUS WASTE MANAGEMENT UNIT INTERIM STATUS CLOSURE PLAN
1502030639 18-Dec-2014 Not listed. ORP PROJECT MANAGERS MONTHLY (PMM) MEETING 2440 STEVENS CENTER RICHLAND WASHINGTON MEETING DECEMBER 18 2014
1412180754 23-Oct-2014 Not listed. ORP TPA PROJECT MANAGERS MONTHLY PMM MEETING OCTOBER 23 2014
1411170744 25-Sep-2014 Not listed. ORP TPA PROJECT MANAGERS MONTHLY PMM MEETING SEPTEMBER 25 2014
1402130003 04-Feb-2014 B-13-01 B-13-01: FEDERAL FACILITY AGREEMENT AND CONSENT ORDER CHANGE CONTROL FORM DELETE TREATMENT BY GENERATOR FOOTNOTE IN ACTION PLAN APPENDIX B
DA06548090 11-Jan-2008 Not listed. CONTRACT NO. DE-AC27-99RL14047-SUBMITTAL OF US DEPARTMENT OF ENERGY (DOE), OFFICE OF RIVER PROTECTION (ORP) SURVEILLANCE FOR 204-AR WASTE UNLOADING STATION
DA05187194 14-Jun-2007 Not listed. SUBMITTAL OF DOUBLE-SHELL TANK SYSTEM 204-AR WASTE UNLOADING STATION REV 2 PART A
D9177883 21-Oct-2002 Not listed. ECOLOGY RECEIPT AND REVIEW OF DOE PART A PERMIT APPLICATION REVISIONS FORM 3
D8847203 27-Sep-2001 01-TOD-T023 RESPONSE TO ECOLOGY ACTION ITEMS FOR CATCH TANKS 241-A-350 241-AZ-151 241-AX-152
D8844020 07-Sep-2001 Not listed. SECONDARY CONTAINMENT FOR TRANSFER LINES SN-277 THROUGH SN-280 AND LIQW-702
D8801553 01-Aug-2001 Not listed. JULY 18 2001 SUBMITTAL PER ADMINISTRATIVE ORDER 00NWPKW-1250 AND 00NWPKW-1251
0086883 18-Jul-2001 01-TOD-T0002,CHG-0103044 01-TOD-T0002 AND CHG-0103044: COMPLETION OF ULTRASONIC TESTING AND STATIC LEAK TESTS OF MISCELLANEOUS WASTE (X-032-25) TANKS PER THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY (ECOLOGY) ADMINISTRATIVE ORDERS NO. 00NWPKW-1250 AND 1251
D8475163 01-Sep-2000 DOE/RL-88-21, RELEASE 27 HANFORD SITE DANGEROUS WASTE PART A PERMIT APPLICATION
D8259741 13-Mar-2000 Not listed. TIME DEPLOYMENT STUDY FOR ANNULUS PUMPING IN DOUBLE-SHELL TANKS
D199159629 12-Jan-2000 Not listed. DOE TRANSMITTAL OF HANFORD FACILITY DANGEROUS WASTE PART A PERMIT APPLICATION FORM ONE AND FOUR PART A FORM THREE CHANGING COOPERATOR FROM LMHC TO CHG
D8225208 01-Jan-2000 DOE/RL-88-21, RELEASE 25 HANFORD SITE DANGEROUS WASTE PART A PERMIT APPLICATION
D199159246 18-Nov-1999 Not listed. COMPLETION OF CORRECTIVE MEASURE 3 PER JULY 8 1998 241-SY TANK FARM NOTICE OF CORRECTION
D199158703 21-Oct-1999 Not listed. HANFORD FACILITY DANGEROUS WASTE PART A PERMIT APPLICATION FORM THREE FOR DOUBLE-SHELL TANK SYSTEM AND 204-AR WASTE UNLOADING STATION
D199158621 12-Oct-1999 Not listed. NOTICE OF DEFICIENCY FOR COMBINED DOUBLE-SHELL TANK SYSTEM AND 204-AR WASTE UNLOADING STATION DRAFT PART A FORM THREE DANGEROUS WASTE PERMIT APPLICATION
D199158571 30-Sep-1999 99-EAP-516 TRANSMITTAL OF ONE PART A FORM ONE AND FOUR PART A FORM THREE TO DOCUMENT CHANGE IN COOPERATOR FROM FDH TO LHMC FOR FOUR TSD UNITS
D199158568 24-Sep-1999 99-EAP-502 TRANSFER OF RCRA PERMITTING DOCUMENTATION IN SUPPORT OF CONTRACT TRANSITION
D199157934 07-Sep-1999 Not listed. DEFERRAL OF CONTINUED 244-S DOUBLE CONTAINED RECEIVER TANK INTEGRITY ASSESSMENT TO COMPLETION OF DOUBLE-SHELL TANK INTEGRITY ASSESSMENT REPORT
D199156405 28-Jul-1999 Not listed. NOTICE OF DEFICIENCY FOR DOUBLE-SHELL TANKS SYSTEM AND 204-AR WASTE UNLOADING STATION DRAFT B PERMIT APPLICATION
D199131916 24-Jun-1999 Not listed. COMPLETION OF CORRECTIVE MEASURES PER JULY 8 1998 241-SY TANK FARM NOTICE OF CORRECTION
D199122796 14-Jun-1999 Not listed. NOTICE OF DEFICIENCY FOR DOUBLE-SHELL TANK SYSTEM AND 204-AR WASTE UNLOADING STATION PART B PERMIT APPLICATION
D197070035 01-Feb-1997 DOE/RL-88-21, RELEASE 16 HANFORD SITE DANGEROUS WASTE PART A PERMIT APPLICATION
D196245759 06-Nov-1996 Not listed. PART A SUBMITTAL FOR 204-AR WASTE UNLOADING FACILITY
E0039731 21-Nov-1994 95-PCA-069 RESPONSE TO OCTOBER 18 1994 LETTER ON 204-AR WASTE TRANSFER FACILITY INSPECTION
D196053893 04-Nov-1994 95-PCA-011 HANFORD FACILITY DANGEROUS WASTE PART A PERMIT APPLICATION FORM THREE FOR EIGHT TREATMENT STORAGE AND DISPOSAL UNITS
E0039732 18-Oct-1994 Not listed. ECOLOGY INSPECTION OF 204-AR WASTE TRANSFER FACILITY
E0039297 04-Aug-1994 Not listed. SUMMARY OF REGULATORY AGENCY VISIT INSPECTION OF 204-AR RAILCAR UNLOADING FACILITY
E0039300 18-Apr-1994 ETF-94-0135 PROCEDURE CHANGE AUTHORIZATION SIGNATURE SHEET TANK FARM PLANT OPERATING PROCEDURE TO-290-130 TRANSFER 204-AR RAIL CAR TO TANK FARM REV D-0
D196060692 28-Feb-1994 Not listed. APPLICATION FOR STATE WASTE DISCHARGE PERMIT FOR 200-E AREA W-252 STREAMS
D196048923 28-Feb-1994 Not listed. STATE WASTE DISCHARGE PERMIT APPLICATION FOR 200-E AREA W-252 STREAMS DOE/RL 93-61 REV 000
D196102947 01-Dec-1993 DOE/RL-93-61 000 STATE WASTE DISCHARGE PERMIT APPLICATION FOR INDUSTRIAL DISCHARGE TO LAND 200-E AREA W-252 STREAMS
D196095257 31-Aug-1993 ECN198883,SD-WM-EV-076 ENGINEERING CHANGE NOTICE TO SD-WM-EV-076 REV 2 244-AR COOLING WATER SAMPLING AND ANALYSIS PLAN
D196124147 26-Feb-1993 93-RPB-125,9302110 HANFORD FACILITY DANGEROUS WASTE PART A PERMIT APPLICATION FORM THREE REV 002 FOR 204-AR WASTE UNLOADING STATION UNIT
D196125167 25-Feb-1993 92-LWB-038,9301641 LIQUID EFFLUENT SAMPLING
D196120527 06-Jan-1993 9300336 244-AR VAULT COOLING WATER SAMPLING AND ANALYSIS PLAN
D196120513 09-Dec-1992 9300304 REVISED SAMPLING AND ANALYSIS PLAN
D196095255 01-Dec-1992 SD-WM-EV-076 002 244-AR COOLING WATER SAMPLING AND ANALYSIS PLAN
D196120514 30-Nov-1992 92-LWD-031,9208762 REVISED SAMPLING AND ANALYSES PLANS
D196113639 21-Oct-1992 92-LWD-011,9207437 RESPONSE TABLE FOR COMMENTS RECEIVED ON SAMPLING AND ANALYSIS PLANS
D196101388 11-May-1992 9203011 244-AR VAULT COOLING WATER SAMPLING AND ANALYSIS PLAN
D196101344 30-Apr-1992 92-RPB-113,9202776 SUBMITTAL OF LIQUID EFFLUENT SAMPLING AND ANALYSIS PLANS
D196101364 29-Apr-1992 SD-WM-EV-076 001 244-AR COOLING WATER SAMPLING AND ANALYSIS PLAN
D196101363 14-Apr-1992 SD-WM-EV-076 000 244-AR COOLING WATER SAMPLING AND ANALYSIS PLAN
E0020219 08-Apr-1992 92-RPA-124,9202381 RAILROAD TANK CAR 81 MOVEMENT BACK TO T-PLANT
E0019930 12-Nov-1991 9105625 NOTIFICATION TO WDOH OF ROUTINE TRANSFERS BETWEEN 222-S AND 204-AR
E0019929 23-Sep-1991 91-EAB-239,9104247 NOTIFICATION OF ROUTINE TRANSFERS BETWEEN 222-S AND 204-AR
D196021622 01-Aug-1990 WHC-EP-0342, ADDENDUM 25 244-AR VAULT COOLING WATER STREAM SPECIFIC REPORT
D199159365 14-Dec-1989 Not listed. MEETING MINUTES UNIT MANAGERS MEETING TPA MILESTONE M-22-00 OCTOBER 13 1989
D195065286 10-Oct-1989 8904286 TREATMENT OF GENERATOR PETITION
D195065287 14-Apr-1989 Not listed. CLARIFICATION AND POSSIBLE MODIFICATION OF NINETY DAY GENERATOR RULE
E0031194 27-Feb-1986 FDM-T-290-00001 A-0 WESTINGHOUSE HANFORD COMPANY FACILITY DESCRIPTION MANUAL 204-AR RAIL CAR
E0001526 No date listed. Not listed. TREATMENT BY GENERATOR REQUEST 204-AR WASTE UNLOADING STATION