AR-01141 20-Mar-2019 D4-PFP-041 Facility Status Change Form for 2712Z D4-PFP-041
AR-01142 20-Mar-2019 D4-PFP-110 Facility Status Change Form for MO2308, D4-PFP-110
AR-01143 20-Mar-2019 D4-PFP-135 Facility Status Change Form Area 200W for 252Z-2, D4-PFP-135
0069786H 08-Jun-2017 TPA-CN-0756 TPA-CN-0756: DOE/RL-2011-03, REMOVAL ACTION WORK PLAN FOR THE DEACTIVATION, DECONTAMINATION, DECOMMISSIONING, AND DEMOLITION OF THE PLUTONIUM FINISHING PLANT COMPLEX, REV 1
0069913H 05-Jun-2017 17-AMRP-0181 NOTIFICATION OF PENDING SHUTDOWN OF THE PLUTONIUM FINISHING PLANT (PFP) MAIN VENTILATION SYSTEM STACK AND ASSOCIATED MONITORING STATION AT THE HANFORD SITE
0069672H 25-Apr-2017 Not listed. APRIL 25 2017 MEETING MINUTES PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING MO250/200W
0071406H 09-Mar-2017 Not listed. PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING MARCH 9 2017
0072349H 16-Feb-2017 CWR-PFP-00002 0 2904ZA AND 2904ZB DEMOLITION REPORT AS LEFT CHARACTERIZATION
0071970H 01-Feb-2017 Not listed. PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING FEBRUARY 1 2017
0071367H 24-Jan-2017 D4-PFP-046 FACILITY STATUS CHANGE FORM DOE/RL-2005-13 DOE/RL-2011-03 FACILITY ID: 2729Z
0071368H 24-Jan-2017 D4-PFP-045 FACILITY STATUS CHANGE FORM DOE/RL-2005-13 DOE/RL-2011-03 FACILITY ID: 2727Z
0073241H 22-Dec-2016 17-AMRP-0048 APPROVED SAMPLING AND ANALYSIS PLAN FOR REMOVAL OF THE PLUTONIUM FINISHING PLANT (PFP) 236Z AND 242Z SLABS DOE/RL-2016-25 REVISION 0
0073836H 16-Nov-2016 HNF-60350 0 PFP SLAB REMOVAL AND DISPOSAL DATA QUALITY OBJECTIVE (DQO) SUMMARY
0074319H 26-Oct-2016 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING SEPTEMBER 28 2016
0073640H 26-Oct-2016 Not listed. PLUTONIUM FINISHING PLANT (PFP) OCTOBER 26 2016
0074897H 28-Sep-2016 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING AUGUST 31 2016
0075231H 31-Aug-2016 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING JULY 14 2016
0074515H 31-Aug-2016 TPA-CN-0746 TPA-CN-0746: TPA CHANGE NOTICE FORM DOE/RL-2011-59 REV 0 SURVEILLANCE AND MAINTENANCE PLAN FOR THE PLUTONIUM FINISHING PLANT COMPLEX
0074516H 10-Aug-2016 TPA-CN-0739 TPA-CN-0739: TPA CHANGE NOTICE FORM DOE/RL-2011-03 REV 1 REMOVAL ACTION WORK PLAN FOR THE DEACTIVATION DECONTAMINATION DECOMMISSIONING AND DEMOLITION OF THE PLUTONIUM FINISHING PLANT COMPLEX
0075803H 14-Jul-2016 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING MAY 26 2016
0075716H 13-Jul-2016 DOE/RL-2016-25 DRAFT A DOE/RL-2016-25 DRAFT A: SAMPLING AND ANALYSIS PLAN FOR REMOVAL OF THE 236Z AND 242Z SLABS
0076315H 20-Jun-2016 16-NWP-110 16-NWP-110: COMPLETION OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER TRI PARTY AGREEMENT TARGET MILESTONE M-083-24-T01 SUBMIT REVISION 0 OF THE PFP COMPLEX SURVEILLANCE AND MAINTENANCE (S&M) PLAN TO ECOLOGY DUE JUNE 30 2016
0076114H 14-Jun-2016 16-AMRP-0199 16-AMRP-0199: SURVEILLANCE AND MAINTENANCE PLAN FOR THE PLUTONIUM FINISHING PLANT COMPLEX DOE/RL-2011-59 REVISION 0 COMPLETION OF TARGET MILESTONE M-083-24-T01
0076113H 13-Jun-2016 DOE/RL-2011-59 0 SURVEILLANCE AND MAINTENANCE PLAN FOR THE PLUTONIUM FINISHING PLANT COMPLEX
0076594H 26-May-2016 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING APRIL 28 2016
0077210H 23-Mar-2016 DOE/RL-2011-03 1 REMOVAL ACTION WORK PLAN FOR THE DEACTIVATION DECONTAMINATION DECOMMISSIONING AND DEMOLITION OF THE PLUTONIUM FINISHING PLANT COMPLEX
0077553H 17-Mar-2016 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING FEBRUARY 25 2016
0077685H 20-Jan-2016 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING JANUARY 20 2016
0078320H 20-Jan-2016 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING (PMM) DECEMBER 3 2015
0079149H 07-Dec-2015 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING OCTOBER 29 2015
0079230H 29-Oct-2015 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING 825 JADWIN 641 SEPTEMBER 3 2015
0079659H 03-Sep-2015 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING M0250 200W JULY 23, 2015
0080188H 23-Jul-2015 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING JUNE 25 2015
1506100325 12-May-2015 Not listed. MEETING MINUTES: PLUTONIUM FINISHING PLANT (PFP) PROJECT MANAGERS MEETING MO250/200WEST MARCH 17 2015
1108241349 18-Aug-2011 Not listed. MEETING MINUTES RIVER CORRIDOR CENTRAL PLATEAU TRI PARTY AGREEMENT MILESTONE REVIEW JULY 21 2011
0071320H 09-Jun-2011 Not listed. UNDERGROUND STORAGE TANK SITE ASSESSMENT AND CLOSURE REPORT US DEPARTMENT OF ENERGY SITE # 12763 TANK ID # 2721Z-2
DA05906866 05-Oct-2007 07-SED-0403 TRANSMITTAL OF REV 1A RADIOACTIVE AIR EMISSIONS NOTICE OF CONSTRUCTION NOC FOR TRANSITION OF PLUTONIUM FINISHING PLANT PFP DOE/RL-2003-43
DA05728663 30-Aug-2007 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PFP MAY 24 2007
DA05728673 30-Aug-2007 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PFP JUNE 21 2007
DA05598825 06-Aug-2007 07-SED-0333 TRANSMITTAL OF PLUTONIUM FINISHING PLANT PFP FILTER ROOM 310 REPLACEMENT PLAN HNF-34087 REV 0
DA05186995 13-Jun-2007 Not listed. TPA PLUTONIUM FINISHING PLANT PFP DOCUMENT AVAILABLE
DA05186998 13-Jun-2007 07-AMCP-0191 CONTRACT DE-AC06-96RL13200 FIELD IMPLEMENTATION WORK PLAN FOR PHOTOGRAPHIC CHARACTERIZATION OF 216-Z-9 TRENCH BY CAMERAS AND CRAWLER DOE/RL-2007-32 REV 0
DA05111845 06-Jun-2007 Not listed. DOCUMENT IN ADMIN RECORD
DA05111847 01-Jun-2007 DOE/RL-2006-53 001 ENGINEERING EVALUATION AND ENVIRONMENTAL ANALYSIS REPORT FOR PFP SUB-GRADE STRUCTURES AND INSTALLATIONS [REISSUE]
DA05187021 01-Jun-2007 DOE/RL-2007-32 000 FIELD IMPLEMENTATION WORK PLAN FOR PHOTOGRAPHIC CHARACTERIZATION OF 216-Z-9 TRENCH BY CAMERAS AND CRAWLER
DA04992305 07-May-2007 Not listed. REVIEW OF ENGINEERING EVALUATION COST ANALYSIS FOR PLUTONIUM FINISHING PLANT PFP SUB-GRADE STRUCTURES AND INSTALLATIONS DOE/RL-2006-53
0066021H 10-Apr-2007 0702005 COMPLETION OF HFFACO (TRI PARTY AGREEMENT) INTERIM MILESTONE M-083-22, SUBMIT TO ECOLOGY AN ENGINEERING EVALUATION/COST ANALYSIS(ES) [EE/CA(S)], FOR APPROVAL AND PROVIDE AN ACTION MEMORANDUM(A) AS A PRIMARY DOCUMENT (S) FOR THE DECOMMISSIONING OF THE PFP FACILITY, DUE SEPTEMBER 30, 2008
DA04508274 22-Feb-2007 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING LOW-LEVEL BURIAL GROUNDS JANUARY 18 2007
DA04455246 15-Feb-2007 TPA-CN-162 CHANGE NOTICE FOR MODIFYING APPROVED DOCUMENTS WORK PLANS IN ACCORDANCE WITH TPA ACTION PLAN SECTION 9.0 DOCUMENTATION AND RECORDS DOE/RL-2005-15 REV 0 REMOVAL ACTION WORK PLAN FOR PLUTONIUM FINISHING PLANT PFP ABOVE-GRADE STRUCTURES
DA04454791 07-Feb-2007 07-SED-0128 REQUEST FOR ALTERNATE MONITORING APPROVAL FOR 291-Z-1 STACK PLUTONIUM FINISHING PLANT PFP 200 WEST AREA HANFORD SITE
DA03767956 19-Sep-2006 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP AUGUST 17 2006
DA03630417 24-Aug-2006 KBC-24706 MODIFICATION OF RCRA PERMIT FOR STORAGE WA7890008967 REV 8B TO INCORPORATE FINAL PERMIT CONDITIONS FOR PLUTONIUM FINISHING PLANT PFP TREATMENT UNIT HA-20MB AND 241-Z TREATMENT AND STORAGE TANKS
DA03630509 24-Aug-2006 KBC-24706 COMPLETION OF TPA INTERIM MILESTONE M-83-40 COMPLETE TRANSITION AND DISMANTLEMENT OF 232-Z INCINERATOR DUE SEPTEMBER 30 2006
0066022H 24-Aug-2006 0602325 COMPLETION OF HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (TRI PARTY AGREEMENT) INTERIM MILESTONE M-83-40, COMPLETE TRANSITION AND DISMANTLEMENT OF THE 232-Z BUILDING INCINERATOR, DUE SEPTEMBER 30, 2006
DA03468395 17-Aug-2006 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP JULY 13 2006
DA03374999 16-Aug-2006 06-AMCP-0270 COMPLETION OF TPA INTERIM MILESTONE M-083-40 COMPLETE TRANSITION AND DISMANTLEMENT OF 232-Z BUILDING INCINERATOR DUE SEPTEMBER 30 2006
DA03124746 13-Jul-2006 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP JUNE 22 2006
DA03009684 07-Jul-2006 06-ESD-0132 ACCEPTANCE OF NOTICE OF CONSTRUCTION APPROVAL AIR 06-603 FOR TRANSITION OF PLUTONIUM FINISHING PLANT DOE/RL-2003-43 REV 001
DA03009145 22-Jun-2006 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP MAY 18 2006
DA02567434 18-May-2006 Not listed. COMPLETENESS REVIEW AND APPROVAL OF NEW SOURCE REVIEW NOTICE OF CONSTRUCTION FOR AMENDMENT OF ORDER DE04NWP-001 PLUTONIUM FINISHING PLANT TRANSITION
DA02754282 18-May-2006 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP APRIL 13 2006
DA02350616 14-Apr-2006 06-AMCP-0182 TRANSMITTAL OF NEW SOURCE REVIEW NOTICE OF CONSTRUCTION APPLICATION FOR CONSTRUCTION OR MODIFICATION OF STATIONARY SOURCE CRITERIA TOXIC AIR POLLUTANT EMISSIONS ASSOCIATED WITH TRANSITION OF PLUTONIUM FINISHING PLANT PFP COMPLEX DOE/RL-2004-08 REV 001
DA03007945 13-Apr-2006 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP MARCH 16 2006
DA02277439 31-Mar-2006 06-AMCP-0180 TRANSMITTAL OF DOE/RL-2003-43 REV 001 RADIOACTIVE AIR EMISSIONS NOTICE OF CONSTRUCTION FOR TRANSITION OF PLUTONIUM FINISHING PLANT PFP 200-W AREA HANFORD SITE RICHLAND WASHINGTON
DA02350626 22-Mar-2006 DOE/RL-2004-08 001 NEW SOURCE REVIEW NOTICE OF CONSTRUCTION APPLICATION FOR CONSTRUCTION OR MODIFICATION OF STATIONARY SOURCE CRITERIA TOXIC AIR POLLUTANT EMISSIONS ASSOCIATED WITH TRANSITION OF PLUTONIUM FINISHING PLANT PFP COMPLEX
DA02208617 16-Mar-2006 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP FEBRUARY 14 2006
DA01922013 14-Feb-2006 TPA-CN-150 CHANGE NOTICE FOR MODIFYING APPROVED DOCUMENTS WORK PLANS IN ACCORDANCE WITH TPA ACTION PLAN SECTION 9.0 DOCUMENTATION AND RECORDS DOE/RL-2005-15 REV 000 REMOVAL ACTION WORK PLAN FOR PFP ABOVE GRADE STRUCTURES ANCILLARY FACILITY DEMOLITION
DA01922282 14-Feb-2006 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP DECEMBER 13 2005
DA01880440 24-Jan-2006 06-AMCP-0093 PLUTONIUM FINISHING PLANT PFP
DA02277445 17-Jan-2006 DOE/RL-2003-43 001 RADIOACTIVE AIR EMISSIONS NOTICE OF CONSTRUCTION FOR TRANSITION OF PLUTONIUM FINISHING PLANT PFP 200-W AREA HANFORD SITE RICHLAND WASHINGTON
DA01649457 19-Dec-2005 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP OCTOBER 15 2005
DA01561905 01-Dec-2005 06-AMCP-0065 ACCEPTANCE OF NOTICE OF CONSTRUCTION APPROVAL AIR-05-1101 FOR DEACTIVATION OF PLUTONIUM FINISHING PLANT PFP DOE/RL-2003-43 REV 0A
DA01058996 26-Sep-2005 Not listed. COMPLETION OF TPA INTERIM MILESTONE M-083-14
DA01233911 20-Sep-2005 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP AUGUST 9 2005
DA04027275 20-Sep-2005 TPA-CN-141 CHANGE NOTICE FOR MODIFYING APPROVED DOCUMENTS WORK PLANS IN ACCORDANCE WITH TPA ACTION PLAN SECTION 9.0 DOCUMENTATION AND RECORDS DOE/RL-2005-15 REV 0 REMOVAL ACTION WORK PLAN FOR PFP PLANT ABOVE GRADE STRUCTURES ANCILLARY FACILITY DEMOLITION
DA04027277 20-Sep-2005 TPA-CN-142 CHANGE NOTICE FOR MODIFYING APPROVED DOCUMENTS WORK PLANS IN ACCORDANCE WITH TPA ACTION PLAN SECTION 9.0 DOCUMENTATION AND RECORDS DOE/RL-2005-14 REV 0 REMOVAL ACTION WORK PLAN FOR PFP ABOVE GRADE STRUCTURES FACILITY DEACTIVATION
DA00932779 06-Sep-2005 05-AMCP-0399 COMPLETION OF TPA INTERIM MILESTONE M-083-14 COMPLETE 100 PERCENT OF LEGACY PU HOLDUP REMOVAL AS DEFINED IN LEGACY PU HOLDUP REMOVAL PLAN FOR PFP REQUIRED BY MX-83-12-T01
DA00914124 02-Sep-2005 05-AMCP-0400 TRANSMITTAL OF RADIOACTIVE AIR EMISSIONS NOTICE OF CONSTRUCTION FOR DEACTIVATION OF PLUTONIUM FINISHING PLANT PFP DOE/RL-2003-43 REV 0A
DA691717 28-Jul-2005 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP JUNE 14 2005
DA505618 07-Jul-2005 05-AMCP-0319 TRANSMITTAL OF CENTRAL PLATEAU ECOLOGICAL SAMPLING AND ANALYSIS PLAN PHAS I DOE/RL-2004-42 REV 000
DA505623 07-Jul-2005 05-AMCP-0320 TRANSMITTAL OF CENTRAL PLATEAU ECOLOGICAL SAMPLING AND ANALYSIS PLAN PHASE I DOE/RL-2004-42 REV 000
DA505626 07-Jul-2005 05-AMCP-0321 TRANSMITTAL OF CENTRAL PLATEAU ECOLOGICAL SAMPLING AND ANALYSIS PLAN PHASE I DOE/RL-2004-42 REV 000
DA505634 07-Jul-2005 05-AMCP-0322 TRANSMITTAL OF CENTRAL PLATEAU ECOLOGICAL SAMPLING AND ANALYSIS PLAN PHASE I DOE/RL-2004-42 REV 000
DA505648 07-Jul-2005 05-AMCP-0323 TRANSMITTAL OF CENTRAL PLATEAU ECOLOGICAL SAMPLING AND ANALYSIS PLAN PHASE I DOE/RL-2004-42 REV 000
DA506480 30-Jun-2005 Not listed. MEETING MINUTES TPA MILESTONE REVIEW CENTRAL PLATEAU APRIL 26 2005
DA368827 30-Jun-2005 05-AMCP-0312 TRANSMITTAL OF CENTRAL PLATEAU ECOLOGICAL SAMPLING AND ANALYSIS PLAN PHASE I DOE/RL-2004-42 REV 000
DA452092 14-Jun-2005 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP MAY 10 2005
DA236301 27-May-2005 05-AMCP-0285 PLUTONIUM FINISHING PLANT PFP ABOVE GROUND STRUCTURES CERCLA WORK PLANS FOR APPROVAL
DA263087 26-May-2005 Not listed. APPROVAL OF RECOVERY PLAN FOR LOW-LEVEL WASTE FRACTION OF RETRIEVABLY STORED WASTE SAMPLING AND ANALYSIS PLAN
DA236304 18-May-2005 DOE/RL-2005-14 000 REMOVAL ACTION WORK PLAN FOR PLUTONIUM FINISHING PLANT ABOVE GRADE STRUCTURES FACILITY DEACTIVATION
DA01974612 12-May-2005 05-AMCP-0268 COMMENTS ON PLUTONIUM FINISHING PLANT PFP ABOVE GRADE STRUCTURES ENGINEERING EVALUATION COST ANALYSIS DOE/RL-2004-05 REV 001
DA01974625 12-May-2005 05-AMCP-0269 COMMENTS ON PLUTONIUM FINISHING PLANT PFP ABOVE GRADE STRUCTURES ENGINEERING EVALUATION COST ANALYSIS DOE/RL-2004-05 REV 001
DA01974628 12-May-2005 05-AMCP-0273 COMMENTS ON PLUTONIUM FINISHING PLANT PFP ABOVE GRADE STRUCTURES ENGINEERING EVALUATION COST ANALYSIS DOE/RL-2004-05 REV 001
DA01974631 12-May-2005 05-AMCP-0270 COMMENTS ON PLUTONIUM FINISHING PLANT PFP ABOVE GRADE STRUCTURES ENGINEERING EVALUATION COST ANALYSIS DOE/RL-2004-05 REV 001
DA007045 03-May-2005 05-AMCP-0241 TRANSMITTAL OF RECOVERY PLAN FOR LOW-LEVEL WASTE FRACTION OF RETRIEVABLY STORED WASTE SAMPLING AND ANALYSIS PLAN
DA00914134 02-May-2005 05-AMCP-0242,DOE/RL-2005-13 0 TRANSMITTAL OF CERCLA NONTIME CRITICAL REMOVAL ACTION MEMORANDUM FOR PLUTONIUM FINISHING PLANT PFP ABOVE GRADE STRUCTURES
DA00973996 21-Apr-2005 Not listed. RESPONSIVENESS SUMMARY ON ENGINEERING EVALUATION COST ANALYSIS FOR PLUTONIUM FINISHING PLANT PFP ABOVE GRADE STRUCTURES
DA006670 14-Apr-2005 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP MARCH 10 2005
D7748594 25-Mar-2005 05-AMCP-0209 TRANSMITTAL OF PART A FORM 3 COVERSHEET FOR CLEAN CLOSED PLUTONIUM FINISHING PLANT TREATMENT UNIT GLOVEBOX HA-20 MB
D7612215 10-Mar-2005 Not listed. MEETING MINUTES PROJECT MANAGERS MEETING PLUTONIUM FINISHING PLANT PFP FEBRUARY 10 2005