Discovery Site Evaluation Checklist the French Drain Received Condensate Drainage from the 291-U Sand Filter the French Drain is a Concrete Pipe Filled with Gravel the Ventilation System for U-Plant was Taken off Line on September 15, 2011 the System was Completely Deactivated and Final Effluent Samples were Obtained
- Accession
- 1206290704
- Document Date
- 3/21/2012
- Document Number
- 200-W-234
- Revision
- Title / Description
- Discovery Site Evaluation Checklist the French Drain Received Condensate Drainage from the 291-U Sand Filter the French Drain is a Concrete Pipe Filled with Gravel the Ventilation System for U-Plant was Taken off Line on September 15, 2011 the System was Completely Deactivated and Final Effluent Samples were Obtained
- Pages
- 2
- Author Name
- Charboneau B L, Lobos R A
- Author Organization
- Richland Operations Office, U.S. Environmental Protection Agency
- Document Type
- ASSESSMENTS/EVALUATIONS
- Key Document
- False
- Tri-Party Argeement Milestone
- Operable Unit
- Treatment, Storage, and Disposal Unit
- Waste Management Area
- Post Record of Decision
- False
- Date Placed on Website
- 9/24/2013
- Keywords