DOE/RL-2010-63-ADD-3B Revision 0: Remedial Design Remedial Action Work Plan for the K Basin Interim Remedial Action: Removal of K Basins Sludge from the River Corridor to the Central Plateau; and Removal of Knock Out Pot Contents from the K Basins
- Accession
- 1408200350
- Document Date
- 6/28/2013
- Document Number
- DOE/RL-2010-63-ADD-3B
- Revision
- 0
- Title / Description
- DOE/RL-2010-63-ADD-3B Revision 0: Remedial Design Remedial Action Work Plan for the K Basin Interim Remedial Action: Removal of K Basins Sludge from the River Corridor to the Central Plateau; and Removal of Knock Out Pot Contents from the K Basins
- Pages
- 56
- Author Name
- Lobos R, Teynor T K
- Author Organization
- U.S. Environmental Protection Agency, Richland Operations Office
- Document Type
- PLANS
- Key Document
- False
- Tri-Party Agreement Milestone
- Operable Unit
- Treatment, Storage, and Disposal Unit
- Waste Management Area
- Post Record of Decision
- False
- Date Placed on Website
- 8/20/2014
- Cross Reference
- Keywords