Field Sampling and Analysis Plan of Soil Samples in Support of an Interim Barrier at SX Farm
- Accession
- AR-03704
- Document Date
- 7/1/2009
- Document Number
- RPP-PLAN-41491
- Revision
- 0
- Title / Description
- Field Sampling and Analysis Plan of Soil Samples in Support of an Interim Barrier at SX Farm
- Pages
- 50
- Author Name
- Connelly M P
- Author Organization
- Washington River Protection Solutions
- Document Type
- CERCLA/RCRA RESPONSE ACTION DECISION DOCUMENTS
- Key Document
- False
- Tri-Party Agreement Milestone
- Operable Unit
- Treatment, Storage, and Disposal Unit
- S-2-4 Single-Shell Tanks
- Waste Management Area
- WMA S-SX
- Post Record of Decision
- False
- Date Placed on Website
- 4/28/2020
- Cross Reference
- AR-03702
- Keywords
- SX Farm, interim barrier, soil, field sampling, HFFACO, characterization, Waste Management Area S-SX, WMA S-SX, direct push, RPP-PLAN-41491, quality assurance, quality control, RCRA, sampling event requirements, laboratory analysis requirements, data reporting, eletronic data management, M-045, safety, health, radiological engineering, change control, field team, project/task organization