Establishment of CY 2000 Interim Milestone M-24-00L Groundwater Monitoring Well Construction Requirements
- Accession
- D8244225
- Document Date
- 3/3/2000
- Document Number
- Revision
- Title / Description
- Establishment of CY 2000 Interim Milestone M-24-00L Groundwater Monitoring Well Construction Requirements
- Pages
- 5
- Author Name
- Wilson M
- Author Organization
- Washington State Department of Ecology
- Document Type
- CHANGES, CORRESPONDENCE
- Key Document
- False
- Tri-Party Agreement Milestone
- M-24-00L, M-24-46, M-24-47, M-24-48, M-24-49, M-24-50
- Operable Unit
- Treatment, Storage, and Disposal Unit
- D-1-2 1301-N/1325-N Liquid Waste Disposal Facility, D-2-10 216-A-37-1 Crib, D-2-2 216-A-10 Crib, D-2-3 216-A-29 Ditch, D-2-4 216-A-36B Crib, D-2-5 216-B-3 Pond System, D-2-6 216-B-63 Trench, D-2-7 216-S-10 Pond and Ditch, D-2-8 216-U-12 Crib, D-3-1 300 Area Process Trenches, D-6-1 600 Area Nonradioactive Dangerous Waste Landfill, S-2-8 Liquid Effluent Retention Facility, T-1-2 1324-N/1324-NA Liquid Waste Facilities, T-1-4 183-H Solar Evaporation Basins
- Waste Management Area
- Post Record of Decision
- False
- Date Placed on Website
- 9/24/2013
- Cross Reference
- Keywords