1074 Records Found
Record Name and Description
-
November 2024 Quarterly Report for the State of Washington Vs. U.S. Department of Energy, Hanford Field Office Case No. 08-5085-RMP, for Waste Treatment and Immobilization Plant Construction and Startup Activities and Tank Retrieval Activities – July 1, 2024, Through September 30, 2024
-
Calculation of Upper Prediction Limits (UPLs) for Waste Management Area (WMA) A-AX
-
Hanford Site Resource Conservation and Recovery Act Groundwater Monitoring Report for 2020, DOE/RL-2020-59, Revision 1
-
Hydraulic Gradient and Average Linear Groundwater Velocity Calculations - Quarter 3 Calendar Year 2020
-
Reissue - Hanford Site Resource Conservation and Recovery Act Groundwater Monitoring Report For 2021, DOE/RL- 2021-50, Revision 0
-
Hanford Site Groundwater Monitoring Report for 2019, DOE/RL-2019-66, Revision 0
-
Transmittal of the U.S. Department of Energy’s Responses to Letter 21-NWP-044
-
The U.S. Department of Energy, Office of River Protection Response to Letter 19-NWP-193, Resource Conservation Recovery Act Facility Investigation/Corrective Measures Study Work Plan for Waste Management Area A/AX, Milestone M-045-98
-
Interim Status Groundwater Quality Assessment Plan for the Single Shell Tank Waste Management Area A-AX, DOE/RL-2020-63, Revision 0
-
Interim Status Groundwater Monitoring Plan for Single-Shell Tank Waste Management Area A-AX, DOE/RL-2019-44, Revision 0
-
Transfer of Co-Operator Responsibilities for Hanford Facility Resource Conservation and Recovery Act Permit, WA7890008967
-
Hanford Site Resource Conservation and Recovery Act Groundwater Monitoring Report for 2023, DOE/RL-2023-53, Revision 0
-
Opportunistic Sampling Program, Sampling and Analysis Instruction During Installation of a Vadose Zone Soil Characterization Borehole and Resource Conservation and Recovery Act Monitoring Well at Waste Management Area A-A/X, SGW-68631, Revision 0
-
U.S. Department of Energy Submission of the Retrieval Data Report for Tank 241-AX-103
-
The U.S. Department of Energy Response to Letter 23-NWP-109 from the Washington State Department of Ecology
-
Transmittal of Sampling and Analysis Plan for Drilling Interim Remedial Action Work Plan Wells in the 200-BP-5 and 200-PO-1 Groundwater Operable Units, DOE/RL-2020-41-ADD2, Revision 0
-
Hanford Site Resource Conservation and Recovery Act Groundwater Monitoring Report for 2022, DOE/RL-2022-39, Revision 0
-
The U.S. Department of Energy Response to Letter 22-NWP-038 from the Washington State Department of Ecology and Transmittal of RPP-PLAN-64407, “Waste Management Area Integration Study – Waste Management Area A-AX,” Rev. 1
-
Hanford Site Groundwater Monitoring Report for 2021, DOE/RL-2021-51, Revision 0
-
Transmittal of Waste Management Plan/Waste Control Plan for the 200-BP-5 and 200-PO-1 Groundwater Operable Units, DOE/RL-2022-14, Draft A
-
February 2025 Quarterly Report for the State of Washington Vs. U.S. Department of Energy, Hanford Field Office, Case No. 08-5085-RMP, for Waste Treatment and Immobilization Plant Construction and Startup Activities and Tank Retrieval Activities – October 1, 2024, Through December 31, 2024
-
Reopen for Cause and Issuance of Approval Order DE23NWP-001, Revision 1, for the 241-A Tank Farm
-
Interim Status Change Number 1: Interim Status Alternate Groundwater Monitoring Plan for the Single-Shell Tank Waste Management AREA A-AX, RCRA-CN-01_DOE/RL-2023-36_R0
-
Opportunistic Sampling Program, Sampling and Analysis Instruction During Installation of a Vadose Zone Soil Characterization Borehole and Resource Conservation and Recovery Act Monitoring Well at Waste Management Area A-A/X, SGD-68631, Regulator Review Draft
-
Interim Status Groundwater Monitoring Plan for the Single-Shell Tank Waste Management Area A-AX, DOE/RL-2023-36, Revision 0